Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.7 LAccepted-AOC | ₹43.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹45.1 L+₹1.4 L (3.10%)Rejected-Finance N A | FARIDABAD | HARYANA | 121004 | ₹45.1 L+₹1.4 L (3.10%) | L2 | Rejected-Finance L2 |
| 3 | L3₹46.1 L+₹2.3 L (5.35%)Rejected-Finance 00 NEAR POLICE POST JIND BYE PASS KAITHAL 136027 | KAITHAL | KAITHAL | HARYANA | 136027 | ₹46.1 L+₹2.3 L (5.35%) | L3 | Rejected-Finance L3 |
| 4 | L4₹47.2 L+₹3.5 L (7.95%)Rejected-Finance JIND JIND HARYANA | JIND | HARYANA | 126101 | ₹47.2 L+₹3.5 L (7.95%) | L4 | Rejected-Finance L4 |
Tender Value
₹46.8 L
EMD Value
₹93,660
Closing Date
13 Nov 2024, 5:00 pmClosed
NARAYAN DUTT
Executive Engineer Kaithal
Const. of Sub Health Centre at Village Habri
2024_HRY_409209_1
2024E4E4E3CC 4BB8 461A 9CB2 C0337E6D73BE702DEV
Open Tender
Civil Works
Works
150 days
HABRI
2 documents required · 2 mandatory
₹2,500
₹93,660
Yes
31 Dec 2024
6 Nov 2024
14 Nov 2024
6 Nov 2024
13 Nov 2024
6 Nov 2024
Amount
CONST. OF SUB HEALTH CENTER(HABRI)
S/E of 1.5 ton split AC (Voltas/ Blue star/ Lloyed) including cost of M.S. stand , Stablizer,and 9 ft copper pipe and all other patty material required to complete the job in all respect.
Supply of cable complete with necessary conections supply of 16 sq mm 4 core armaured cable
S/E of 45 watt LED street light fitting make (Philips/ Bajaj/ Crompton/ Wipro/Surya / Havells / Helonix) aluminium die cast body powder coated, potted driver, toughened glass body luminaries including all labour and patty material to required to complete the job in all respect.
Supply of 20 Watt LED Tube Light Fitting (Philips/ Bajaj/Wipro/Surya/Hevells/Helonix) Complete all respect.
S/E of Water Cooler 40/80 Ltr. (Climatrol,Voltas, Usha ,) make including making necessery connections and all patty material required to complete the job in all respect.
S/E of R.O. 25 L.P.H.. (Livpure ,Kent,Aquaguard) make including making necessery connections and all patty material required to complete the job in all respect.
S/E of Split A.C. 2.0 Ton 5 star (Lloyed/ Voltas/ Blue Star/Diakin) make including making necessery connections and all patty material required to complete the job in all respect.
S/E of PVC drain pipe for split A.C. including making necessery connections and all patty material required to complete the job in all respect.
S/E of copper pipe for split A.C. including making necessery connections and all patty material required to complete the job in all respect.
Bidder Name
Amount
SAUBHAGYA CONSTRUCTION (GSTN-06ADFFS1037D1ZI) BID ID -1166787
Bhuslana Mahalaxmi (GSTN-NA) BID ID -1167334
CHAHAL CONSTRUCITON COMPANY (GSTN-NA) BID ID -1164816
THE KHERI GULAM ALI CO-OP SOCIETY (GSTN-NA) BID ID -1164842
THE KHERI GULAM ALI CO-OP SOCIETY (BID ID -1164842)
SAUBHAGYA CONSTRUCTION (BID ID -1166787)
Bhuslana Mahalaxmi (BID ID -1167334)
Bhuslana Mahalaxmi (BID ID -1167334)
THE KHERI GULAM ALI CO-OP SOCIETY (BID ID -1164842)
CHAHAL CONSTRUCITON COMPANY (BID ID -1164816)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .