Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.5 LAccepted-AOC NA | NA | NA | 121004 | L1 | Accepted-AOC L1 | |
| 2 | L2₹59.1 L+₹3.6 L (6.49%)Rejected-AOC HOUSE NO 699 VPO KILOI DOPANA ROHTAK 124401 | ROHTAK | ROHTAK | HARYANA | 124401 | L2 | Rejected-AOC L2 | |
| 3 | L3₹62.5 L+₹6.9 L (12.5%)Rejected-AOC DOON PUBLIC SCHOOL NEAR HOUSE NO 838 P SECTOR 21 PANCHKULA 134112 | PANCHKULA | PANCHKULA | HARYANA | 134112 | L3 | Rejected-AOC L3 | |
| 4 | L4₹65.3 L+₹9.8 L (17.6%)Rejected-AOC JIND JIND HARYANA | JIND | HARYANA | 126101 | L4 | Rejected-AOC L4 |
Tender Value
₹51.5 L
EMD Value
₹1.0 L
Closing Date
9 May 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Sinchai Bhawan Jhajjar
Constructing head regulator at RD 62107 JSB (RD 0 of Jhajjar Disty)
2022_HRY_219445_1
regulator
Open Tender
Civil Works
Works
180 days
Jhajjar
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹1.0 L
Yes
22 Jun 2022
3 May 2022
11 May 2022
3 May 2022
9 May 2022
3 May 2022
120 days
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. including dressing, refilling around structure (HSR 4.12.1)
Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to RMC from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing. admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Enginer-in-charge, M-15 grade plain cement concrete 1084 454 2686 4224 (cement content considered HSR 6.22.2.2
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge All works upto plinth level. HSR 6.25
Centering and shuttering including strutting propping etc and removalof form for foundations, footing, bases of columns, etc for mass concrete shuttering HSR 6.21.1
Shuttering walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc HSR 6.30.2
Suspended floors, rofs landings balconies shuttering HSR 6.30.3
Brick masonry work in cem,ent mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and Technical specifications MORT&H clause 1300 Cement mortar 1:3 (1 cement : 3 Snad) HSR 15.6.1
Providing and filling in position, blown bitumen in expansion joints HSR 27.51.4
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work below plinth level and upto Floor IV level : 1 :4:8 (1 Cement : 4 Coars sand (Zone III : 8 graded staone aggregate 40 mm nominal size) HSR 6.1.6
Pointing on brick work or brick flooring with cement mortar 1:3 ( 1 cement : 3 fine sand) reised and cut pointing HSR 11.25.2
Steel reinforcement for RCC work where not included in the complete rate of RCC inculding straightening, cutting, bending , placing in position , binding wastage overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc complete in all respect below plinth level (Cold twisted bars) HSR 6.33.3
Dismantling of brick work
Supply and fixing of gate
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pliasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc upto floor four level, excluding the cost of centering, shuttering and finishing; 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III: 3 grade staone aggregate 20 mm nominal size)
Credit of steel for old regulation gate
Credit of dismantling brick works
The Sanjay Kiloi Dopana Co.Op L and C Society Ltd.
ARVIND KUMAR CONTRACTOR
jaipal singh s/o sardara singh
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .