| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 CrAdmitted-Finance | -15.51% | ₹2.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.4 Cr+₹11.9 L (5.34%)Admitted-Finance | -11.00% | ₹2.4 Cr+₹11.9 L (5.34%) | L2 | Admitted-Finance |
| 3 | L3₹2.4 Cr+₹17.2 L (7.69%)Admitted-Finance | -9.01% | ₹2.4 Cr+₹17.2 L (7.69%) | L3 | Admitted-Finance |
| 4 | L4₹2.4 Cr+₹17.5 L (7.84%)Admitted-Finance | -8.89% | ₹2.4 Cr+₹17.5 L (7.84%) | L4 | Admitted-Finance |
| 5 | L5₹2.5 Cr+₹24.3 L (10.9%)Admitted-Finance | -6.31% | ₹2.5 Cr+₹24.3 L (10.9%) | L5 | Admitted-Finance |
Tender Value
₹2.6 Cr
EMD Value
₹5.3 L
Closing Date
24 Aug 2026, 6:00 pmClosed
SE and PM WCDC
SE and PM WCDC
CONSTRUCTION OF WATER HARVESTING STRUCTURE, PAKKA CHECKDAM AND ANICUT
2026_WDSC_582524_1
NIT 39/2026-27 SE and PM
Open Tender
Civil Works
Percentage
Adwas
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
As per NIT
₹5.3 L
14 Sept 2026
6 Aug 2026
25 Aug 2026
6 Aug 2026
24 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect | 0 | - | 0 | ₹0 |
| 2 | In hard & Kanker mixed soil BSR RDPR 2023 Item No. 196 b | - | Cum | 68.52 | - |
| 3 | Soft / Disintegrated rock BSR WRD 2023 Item No 2a Chapter Vth | - | Cum | 161 | - |
| 4 | Hard rock not requiring blasting BSR WRD 2023 Item No 2b Chapter Vth | - | Cum | 242 | - |
| 5 | Cement concrece (1:3:6) with 40 mm stone aggregate well mixed & laid in position complete including curing and finishing etc. Complete.BSR RDPR 2025 Item No 170 B | - | Cum | 4,350.4 | - |
| 6 | Stone kharanja 23 cm thick in apron with cement mortar (1:6) including curing etc. complete. BSR RDPR 2025
Item No 149 B | - | SQM | 592.62 | - |
| 7 | R.R.Stone masonary in cement mortar (1:6) including curing & finishing etc. complete for foundation BSR RDPR 2025 Item No 166 A | - | Cum | 3,298.22 | - |
| 8 | R.R.Stone masonary in cement mortar (1:6) including curing & finishing etc. complete for superstructure.BSR RDPR 2025 Item No 166 A | - | Cum | 3,298.22 | - |
| 9 | Cement concrete(1:2:4) with 20 mm stone aggregate well mixed and laid in position complete including curing and finishing.BSR RDPR 2025 Item No 16 | - | Cum | 5,161.16 | - |
| 10 | 25MM thick cement plaster in cement sand mortar (1:4) including racking of joints smooth finishing and curing of etc. Complete BSR RDPR2025 Item No 76 A | - | Sqm | 305.71 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
39_BID.pdf
Tender Documents • 1.36 MB
BOQ_1035342.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .