| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | ₹8.0 L | L1 | Accepted-AOC LOW RATE QUOTED |
| 2 | L2₹8.0 LRejected-Finance | ₹8.0 L | L2 | Rejected-Finance High Rate Quoted |
| Sl No | Description | Qty | Unit | Yuvaraj B L1 | N VENKATESAN L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation | 19.99 | m3 | 260 ₹5,197.40 | 270 ₹5,397.30 |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete. | 10.31 | m3 | 5,390 ₹55,570.90 | 5,400 ₹55,674 |
| 3.00 | Supplying and filling in basement with exavated earth in layers not more than 15cm. thick wellrammed, watered and compacted complete complying with standard specification | 9.21 | m3 | 45.5 ₹419.06 | 50 ₹460.50 |
| 4.00 | Supplying and filling in foundation and basement with filling sand in layers not more than 15cm. thick wellrammed, watered and compacted complete complying with standard specification | 4.6 | m3 | 1,757 ₹8,082.20 | 1,800 ₹8,280 |
| 5.00 | Brick work in Cement Mortar 1:5 using Country bricks including cost and conveyace of all materials and all labour charges,etc, | 10.65 | m3 | 6,125.5 ₹65,236.58 | 6,150 ₹65,497.50 |
| 6.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal | 18.2 | m3 | 9,141.5 ₹1.7 L | 9,150 ₹1.7 L |
| 7.00 | Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.
Matt Footing Alround | 29.84 | m2 | 547 ₹16,322.48 | 550 ₹16,412 |
| 8.00 | Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.
Column | 108.88 | m2 | 1,095 ₹1.2 L | 1,100 ₹1.2 L |
| 9.00 | Supplying, fabrication and placing in position mils steel or ribbed for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standared specification. | 1.2 | MT | 91,965 ₹1.1 L | 91,970 ₹1.1 L |
| 10.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 104.67 | m3 | 308.5 ₹32,290.70 | 310 ₹32,447.70 |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
7 Jan 2026, 5:00 pmClosed
BLOCK DEVELOPMENT OFFICER
BLOCK DEVELOPMENT OFFICE
CONS OF DRAMA STAGE AT MALIGAIPATTU UNDER MLACDS
2026_RDTN_639627_1
A6/4343/25 - MALIGAIPATTU DS
Open Tender
Civil Works
90 days
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,000
7 Mar 2026
6 Jan 2026
7 Jan 2026
6 Jan 2026
7 Jan 2026
6 Jan 2026
Amount
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Supplying and filling in basement with exavated earth in layers not more than 15cm. thick wellrammed, watered and compacted complete complying with standard specification
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm. thick wellrammed, watered and compacted complete complying with standard specification
Brick work in Cement Mortar 1:5 using Country bricks including cost and conveyace of all materials and all labour charges,etc,
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting. Matt Footing Alround
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting. Column
Supplying, fabrication and placing in position mils steel or ribbed for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standared specification.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering with Cement Mortar 1:5 (one cement and five sand) 12 mm. thick in all floors including curing etc., complete complying with standard specification and as directed
Painting two coat using readymixed emulsion paint of approved quality and colour over priming coat (New) including cost and all labour charges etc. complete
Colour Washing with best Distempering two Coats in to primer coat and two coats with oil bound distember over cement plasterd surface ceiling and other new surface and including clearing,preparing the surface and etc.,complete.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm
Providing Electrification
N VENKATESAN (BID ID -1556252)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
BOQ_765998.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid