Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.5 CrFinancial bid opened Comprehensive maintenance to IBB Road in ID-78, 79, 79A1, 79A, 79B, 79C, 79D & 80 from BP No. 1129/4-S to 1203/3-S. Total Length 156.522 Km i/c Link Road under Tura Sub-Division in Meghalaya Sector during the year 2023-2024, 2024-2025, 2025-2026. (SH: Ordinary repair, bridge repair and flood damage repair). | Comprehensive maintenance to IBB Road in ID-78, 79, 79A1, 79A, 79B, 79C, 79D & 80 from BP No. 1129/4-S to 1203/3-S. Total Length 156.522 Km i/c Link Road under Tura Sub-Division in Meghalaya Sector during the year 2023-2024, 2024-2025, 2025-2026. (SH: Ordinary repair, bridge repair and flood damage repair). | ₹4.5 Cr | L1 | Financial bid opened |
| 2 | L2₹4.6 Cr+₹11.9 L (2.68%) Comprehensive maintenance to IBB Road in ID-78, 79, 79A1, 79A, 79B, 79C, 79D & 80 from BP No. 1129/4-S to 1203/3-S. Total Length 156.522 Km i/c Link Road under Tura Sub-Division in Meghalaya Sector during the year 2023-2024, 2024-2025, 2025-2026. (SH: Ordinary repair, bridge repair and flood damage repair). | Comprehensive maintenance to IBB Road in ID-78, 79, 79A1, 79A, 79B, 79C, 79D & 80 from BP No. 1129/4-S to 1203/3-S. Total Length 156.522 Km i/c Link Road under Tura Sub-Division in Meghalaya Sector during the year 2023-2024, 2024-2025, 2025-2026. (SH: Ordinary repair, bridge repair and flood damage repair). | ₹4.6 Cr+₹11.9 L (2.68%) | L2 | - |
| 3 | L3₹5.1 Cr+₹66.6 L (14.9%) Comprehensive maintenance to IBB Road in ID-78, 79, 79A1, 79A, 79B, 79C, 79D & 80 from BP No. 1129/4-S to 1203/3-S. Total Length 156.522 Km i/c Link Road under Tura Sub-Division in Meghalaya Sector during the year 2023-2024, 2024-2025, 2025-2026. (SH: Ordinary repair, bridge repair and flood damage repair). | Comprehensive maintenance to IBB Road in ID-78, 79, 79A1, 79A, 79B, 79C, 79D & 80 from BP No. 1129/4-S to 1203/3-S. Total Length 156.522 Km i/c Link Road under Tura Sub-Division in Meghalaya Sector during the year 2023-2024, 2024-2025, 2025-2026. (SH: Ordinary repair, bridge repair and flood damage repair). | ₹5.1 Cr+₹66.6 L (14.9%) | L3 | - |
| 4 | - | - | - | - |
| Sl No | Description | Qty | Unit | Bidya Sagar Mishra L3 | M/s Dilip Paul & Sons L1 | GLOBAL TECHNOCRATS PVT LTD L2 |
|---|---|---|---|---|---|---|
| 1 | Comprehensive maintenance to IBB Road in ID- 78, 79, 79A1, 79A, 79B, 79C, 79D & 80 from BP No. 1129/4-S to 1203/3-S, Total Length 156.522km i/c Link Road under Tura Sub-Division in Meghalaya Sector during the year 2023-2024, 2024-2025,2025-2026. (SH:- Ordinary repair, bridge repair and flood damage repair). | - | - | 0 ₹5,12,48,609 | -13 ₹4,45,86,289.83 Lowest | -10.67 ₹4,57,80,382.42 |
Tender Value
₹5.1 Cr
EMD Value
₹10.2 L
Closing Date
21 Nov 2023, 11:00 amClosed
EE(C ), BFD-V, Tura
Executive Engineer
O/o EE BFD V CPWD
Comprehensive maintenance to IBB Road in ID-78, 79, 79A1, 79A, 79B, 79C, 79D & 80 from BP No. 1129/4-S to 1203/3-S. Total Length 156.522 Km i/c Link Road under Tura Sub-Division in Meghalaya Sector during the year 2023-2024, 2024-2025, 2025-2026. (SH: Ordinary repair, bridge repair and flood damage repair).
57653
10/02/SE/BFC-II/IBBZ-II/EE/BFD-V/TURA/2023-24
OPEN
Repair and Maintenance
NCB
1095 days
West Garo Hills, Meghalaya
6 documents required · 6 mandatory
₹10.2 L
Not Applicable
21 Nov 2023
31 Oct 2023
21 Nov 2023
21 Nov 2023
21 Nov 2023
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT10_COMP_23-24.pdf
document • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .