Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.7 LAccepted-Finance | ₹24.7 L | 1 | Accepted-Finance 1 |
| 2 | 2₹24.7 LRejected-Finance | ₹24.7 L | 2 | Rejected-Finance 2 |
| Sl No | Description | Qty | Unit | ms Aryan construction company L2 | shiv mahima construction L1 |
|---|---|---|---|---|---|
| 1.01 | Earthwork in excavator in foundation including chharribajari,wet earth,slush kanker which is not separeble I e all type of soils including dewatering with all leads,lifts labour,T&P and proper disposal etc complete. | 330.72 | cum | 142 ₹46,962.24 | 140 ₹46,300.8 Lowest |
| 1.02 | Providing and laying M-10 mix plain cement concrete of A20 aggregate,c-sand and cement complete in allrespect including all material ,labourand T& P For proper completion of work | 25.44 | cum | 6,171 ₹1,56,990.24 | 6,170 ₹1,56,964.8 Lowest |
| 1.03 | Brick masonary in 1:4 cement sand mortar usin 1st class brick in all respect including all lead, lift cost of materail labour curing and T&P etcrequired for proper completion of | 127.24 | cum | 5,333 ₹6,78,570.92 | 5,330 ₹6,78,189.2 Lowest |
| 1.04 | Preparation of sand/Silt bed preparation after compaction and to achieve 65% relative density at OMC including all materail,labour etc Between chainage 0.010 to Chainage 0.25 | 50.4 | cum | 2,071 ₹1,04,378.4 | 2,070 ₹1,04,328 Lowest |
| 1.05 | 10 mm thick brick cement plaster on brick masonry in 1:4 cement sand mortar including all cost of meterial,labour and t&p etc. as par | 1,118.4 | sqm | 227 ₹2,53,876.8 | 225 ₹2,51,640 Lowest |
| 1.06 | Providing 70 mm thick brick lining in 1:4 cement sand sand mortar complete in all including all material, labour,curing,T&P required for proper completion Between chainage 0.010 to Chainage 0.25 | 1,296 | sqm | 523 ₹6,77,808 | 520 ₹6,73,920 Lowest |
| 1.07 | Casting and laying of porous blocks of size 230 *230 *180 mm in 1:4 cement and 20 mm coarse aggregate including all cost of matrials, labour ,T&P etc to complete the work as per drawing and specification in Nos.Between chainage 0.010 to Chainage 0.25 | 34 | Nos | 60 ₹2,040 Lowest | 60 ₹2,040 Lowest |
| 1.08 | earth work in constructing channel where earth is bought from private land manually or by other means where ever possible and aplicable in below 1.0 cumecs in all type of soil including lead upto 30 m and lift upto 1.5 m excluding mechanical compaction but inclusive of manual compaction and dressing to profile. 60% of total filling eathwork quantity | 1,840.5 | cum | 127 ₹2,33,743.5 Lowest | 127 ₹2,33,743.5 Lowest |
| 1.09 | earth Work by power transport for a lead of upto 1 km including excavation,loading,unloading,royalty,manual compaction and dressing including all lift .rates shall be aplicable for lead beyaond 1 km and upto 20 km. 40% of total filling quantity | 1,227 | cum | 261 ₹3,20,247 | 260 ₹3,19,020 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.8 L
Closing Date
29 Jun 2026, 10:00 amClosed
EE
RDSSC
AS PAR TENDER NOTICE
2026_UPIDC_1162880_1
01/rkd/2026-27 lot 1
Open Tender
Civil Works - Canal
Item Rate
180 days
raebareli
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,590
₹2.8 L
Yes
17 Jul 2026
23 Jun 2026
29 Jun 2026
23 Jun 2026
29 Jun 2026
23 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earthwork in excavator in foundation including chharribajari,wet earth,slush kanker which is not separeble I e all type of soils including dewatering with all leads,lifts labour,T&P and proper disposal etc complete. | - | cum | 142.2 | - |
| 1.02 | Providing and laying M-10 mix plain cement concrete of A20 aggregate,c-sand and cement complete in allrespect including all material ,labourand T& P For proper completion of work | - | cum | 6,171.1 | - |
| 1.03 | Brick masonary in 1:4 cement sand mortar usin 1st class brick in all respect including all lead, lift cost of materail labour curing and T&P etcrequired for proper completion of | 1 | cum | 5,333.15 | ₹5,327.82 |
| 1.04 | Preparation of sand/Silt bed preparation after compaction and to achieve 65% relative density at OMC including all materail,labour etc Between chainage 0.010 to Chainage 0.25 | 1 | cum | 2,071.2 | ₹2,069.13 |
| 1.05 | 10 mm thick brick cement plaster on brick masonry in 1:4 cement sand mortar including all cost of meterial,labour and t&p etc. as par | - | sqm | 227.8 | - |
| 1.06 | Providing 70 mm thick brick lining in 1:4 cement sand sand mortar complete in all including all material, labour,curing,T&P required for proper completion Between chainage 0.010 to Chainage 0.25 | - | sqm | 523.05 | - |
| 1.07 | Casting and laying of porous blocks of size 230 *230 *180 mm in 1:4 cement and 20 mm coarse aggregate including all cost of matrials, labour ,T&P etc to complete the work as per drawing and specification in Nos.Between chainage 0.010 to Chainage 0.25 | - | Nos | 60.4 | - |
| 1.08 | earth work in constructing channel where earth is bought from private land manually or by other means where ever possible and aplicable in below 1.0 cumecs in all type of soil including lead upto 30 m and lift upto 1.5 m excluding mechanical compaction but inclusive of manual compaction and dressing to profile. 60% of total filling eathwork quantity | - | cum | 127.83 | - |
| 1.09 | earth Work by power transport for a lead of upto 1 km including excavation,loading,unloading,royalty,manual compaction and dressing including all lift .rates shall be aplicable for lead beyaond 1 km and upto 20 km. 40% of total filling quantity | - | cum | 261.68 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_2179806.xls
BOQ • 0.26 MB
biddocument.pdf
Tender Documents • 1.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].