Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.7 LAdmitted-Fee/PreQual/Technical/Finance | -15.99% | ₹4.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.6 L+₹88,756.98 (19.0%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹5.6 L+₹88,756.98 (19.0%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹5.6 L+₹88,756.98 (19.0%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹5.6 L+₹88,756.98 (19.0%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L2₹5.6 L+₹88,756.98 (19.0%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹5.6 L+₹88,756.98 (19.0%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L2₹5.6 L+₹88,756.98 (19.0%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹5.6 L+₹88,756.98 (19.0%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.6 L
EMD Value
₹5,600
Closing Date
22 Jul 2026, 5:00 pmClosed
EXECUTIVE ENGINEER RW (PH) DIVISION, BHUBANESWAR
SE RW (PH) DIVISION, BBSR Behind Esplande mall, Bomikhal, Rasulgarh,751010
PH Works for Construction of HWC Sub-Centre Building at Sutei of Remuna block in the district of Balasore for the year 2023-24
2026_CERWI_134533_9
EERWPH-09/2026-27
Open Tender
Civil Works - Buildings
Percentage
Sutei
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
₹5,600
Yes
27 Jul 2026
13 Jul 2026
23 Jul 2026
13 Jul 2026
22 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in all kinds of soil in excavation of foundation trenches within 50 m initial lead including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding o.30 in depth and as per direction of E.I.C .-- Initial lift up to 1.50m | 1 | Cum | 299.53 | ₹299.23 |
| 2 | 2nd depth upt 3.00 mtr | - | Cum | 321.53 | - |
| 3 | Supplying all materials, labour T&P and filling in F&P with river sand well watered and rammed including conveyance of all materials to worksite payment of royalty, taxes etc. all complete as per direction of E.I.C. | - | Cum | 1,437.4 | - |
| 4 | Supplying all materials, labour T&P and providing c.c (1:3:6) using 4cm h.g. metal including watering, curing, coveyance of all materials to worksite payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. | - | Cum | 7,087.5 | - |
| 5 | Supplying all materials, labour T&P and providing c.c (1:1.5:3) using 12 mm h.g. chips including watering, curing, coveyance of all materials to worksite payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. | - | Cum | 9,294.7 | - |
| 6 | 1st floor | 1 | Cum | 9,731.5 | ₹9,721.77 |
| 7 | Supplying all materials, labour, T&P and providing brick work with Fly Ash bricks 25cmx12cmx8cm size having cs. not less than 75kg / cm2 with dimensional tolerance ± 8% in including watering,curing conveyance of all materials to worksite, payment of royalty taxes etc. all complete as per specification and direction of EIC. - In Foundation & Plinth in CM (1:4) | 1 | Cum | 6,112.1 | ₹6,105.99 |
| 8 | Supplying all materials, labour, T &P and providing C.C (1:1.5 :3 ) using 12mm h.g. chips for R.C.C. works including hoisting, laying, watering, curing, conveyance of all materials to worksite, curing, conveyance of all materials to worksite, payment of royalty, taxes etc, all complete as per specification and direction of E.I.C. | - | Cum | 9,294.7 | - |
| 9 | Supplying all materials, labour, T&P and providing M.S. reinforcement for R.C.C. works including cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge, conveyance of all materials to worksite etc. complete as per directio n of E.I.C. | 0.28 | Qntl | 8,584.4 | ₹2,403.63 |
| 10 | Supplying all materials, labour, T&P and providing rigid & smooth centering & shuttering for R.C.C.works including false work and dismantling them after casting including conveyance of all material, to worksite, payment of royalty, taxes etc. all complete as per direction of E..I.C.-- R.C.C.Slab | 1 | Sqm | 762.1 | ₹761.34 |
stage.html
html • 0.03 MB
finance_600565.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_600565.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .