Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-Finance NOT SPECIFIED | NA | NA | 121004 | ₹1.0 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.1 Cr+₹5.0 L (4.85%)Rejected-Finance | ₹1.1 Cr+₹5.0 L (4.85%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.1 Cr+₹7.5 L (7.22%)Rejected-Finance | ₹1.1 Cr+₹7.5 L (7.22%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Dis Qualify |
Tender Value
Refer Docs
EMD Value
₹2.7 L
Closing Date
25 Apr 2026, 4:00 pmClosed
EE
Nagar Nigam Gorakhpur
Ward number 31 harsewakpur Mein mprl school se Rakesh shrivtastav ke Makan Hote Hue Ram Vinay ke Makan Tak aur Anya Galiyon Mein CC Sadak aur RCC Nali ka Nirman Karya
2026_DOLBU_1137687_1
CMNSY Ward 31
Open Tender
Civil Works
Percentage
180 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Nagar Nigam Gorakhpur
₹2.7 L
13 Jul 2026
16 Apr 2026
25 Apr 2026
16 Apr 2026
25 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Earth filling with cartage upto 10km including etc. all complete of work. | - | Cum | - | - |
| 1.02 | Earth work in excavation in foul position soil lead 50mt & lift 1.5 mt including dressing and disposal including T&P etc all complete. | - | Cum | - | - |
| 1.03 | P/L of base concrete in 1:6:12 with cement, coarse sand and 40mm size stone including material, labour, T&P etc complete. | - | Cum | - | - |
| 1.04 | RCC Work with cement concrete (1:1.5:3) including all completion of work. | - | Cum | - | - |
| 1.05 | M.S or iron work in reinforcement cutting bending, binding and placing incl. etc all. | - | Qtl | - | - |
| 1.06 | Diversion by diesel pump including all comp. work. | - | Cum | - | - |
| 1.07 | P/L of flat soling including etc. all complete of work. | - | Sqm | - | - |
| 1.08 | S/Laying of GSB 53.9.5 mm thick S/B upto 10cm loose layer including etc. all complete of work. | - | Cum | - | - |
| 1.09 | Consolidation of GSB upto 10 cm thick loose layer by Road Roller including etc. all complete. | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.36 MB
d.pdf
Tender Documents • 2.34 MB
BOQ_2124341.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .