Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC NO 4 745 5 FIRST FLOOR 3RD STREET 6TH CROSS STREET MAHALAKSHMI NAGAR K PUDUR MADURAI 02 | MADURAI | MADURAI | TAMIL NADU | ₹1.9 Cr | L1 | Accepted-AOC L1 CONTRACTOR |
| 2 | L2₹1.9 Cr+₹3.0 L (1.61%)Rejected-Finance | ₹1.9 Cr+₹3.0 L (1.61%) | L2 | Rejected-Finance L2 CONTRACTOR |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
3 May 2023, 3:00 pmClosed
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
Madurai District Madurai west Block Under MGSMT 2022-2023 Strengthening with 5 years maintenance of 2 nos of Roads Package No TN MDU-MW-06
2023_RDTN_307305_1
735/2023/D6/Mwest06
Open Tender
Civil Works
Item Rate
180 days
Madurai west
Refer Tender document
4 documents required · 4 mandatory
₹0
₹1.9 L
24 Jun 2023
27 Apr 2023
3 May 2023
27 Apr 2023
3 May 2023
29 Apr 2023
Amount
Upgradation & Black topping Road from Madurai Natham road to Lakhsmi Nagar & Bharath nagar road in Chatrapatti Panchayat. Km - 0/0 -1/6, R-45
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Construction of granular sub-base (GSB) by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 401 Grading III.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying Primecoat over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., Complete.
Applying Tackcoat over Primed WMM surface at 2.5Kg / 10 sq.m RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., Complete.
Bituminous Macadam 50 MM thick including hire and Labour charges etc., complete.
Providing and laying Bituminous Concrete to 25/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of PMB Cubes for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing and Laying U.S. gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.
Road marking with Hot Applied Thermoplastic compound with reflectorising Glass beads on Bituminous surface
CULVERT @ Ch 0/0
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with exc
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1:4:8 mix using 40mm HBG metal including all cost and conveyance of all materials and labours charges etc., complete
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Centering and shuttering for RCC work in plain surfaces including all cost and conveyance of all material using mild steel angles of size 25mmx25mmx3mm with 10 guage sheets of size 10cmx60cm welded frame for boarding laid over silver oak joist of size 5cm
A) Below GL
B)Above GL
Plain Cement concrete 1:3:6 using 40mm ISS HBG metal for all including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be fi
Plain Cement concrete 1:2:4 using 20mm ISS HBG metal for all including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be fi
Reinforcement cement concrete 1:1.5:3 mix using 20mm graded HBG metal including all cost and conveyance of materials and labour charges etc., complete
Supply and fixing of 63 mm PVC Pipe for Wheep Holes
Providing and Laying of Gravel including all cost and conveyance of materials
CULVERT @ Ch 1/6
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with exc
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1:4:8 mix using 40mm HBG metal including all cost and conveyance of all materials and labours charges etc., complete
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Centering and shuttering for RCC work in plain surfaces including all cost and conveyance of all material using mild steel angles of size 25mmx25mmx3mm with 10 guage sheets of size 10cmx60cm welded frame for boarding laid over silver oak joist of size 5cm
A) Below GL
B)Above GL
Plain Cement concrete 1:3:6 using 40mm ISS HBG metal for all including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be fi
Plain Cement concrete 1:2:4 using 20mm ISS HBG metal for all including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be fi
Reinforcement cement concrete 1:1.5:3 mix using 20mm graded HBG metal including all cost and conveyance of materials and labour charges etc., complete
Supply and fixing of 63 mm PVC Pipe for Wheep Holes
Providing and Laying of Gravel including all cost and conveyance of materials
Supply and fixing of KM stone SI No. 43 A.
Supply and fixing of HM stone SI No. 44 C.
Provision for CIB & Name Board.
Provision for Photos with album.
Road Marker / Road Stud with lens reflector
60cm Equilateral triangle cautionary signborad
Strengthening & Black Topping the Road from Keelapananagadi to Senthamil Nagar via Edision Road in Petchikulam Panchayat. Km - 0/0 -0/9, R-53
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Picking the existing wornout BT surface including all labour charges etc., complete.
Construction of granular sub-base (GSB) by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 401 Grading III.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying Primecoat over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., Complete.
Applying Tackcoat over Primed WMM surface at 2.5Kg / 10 sq.m RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., Complete.
Bituminous Macadam 50 MM thick including hire and Labour charges etc., complete.
Providing and laying Bituminous Concrete to 25mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing and Laying U.S. gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete.
Road marking with Hot Applied Thermoplastic compound with reflectorising Glass beads on Bituminous surface
Supply and fixing of HM stone SI No. 44 C.
Provision for CIB & Name board
Provision for Photos with album.
Road Marker / Road stud with lens reflector
60cm Equilateral triangle cautionary signboard
Upgradation & Black topping Road from Madurai Natham road to Lakhsmi Nagar & Bharath nagar road in Chatrapatti Panchayat. Km - 0/0 -1/6, R-45
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
Strengthening & Black Topping the Road from Keelapananagadi to Senthamil Nagar via Edision Road in Petchikulam Panchayat. Km - 0/0 -0/9, R-53
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SHARVAA ASSOCIATES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .