| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.8 LAccepted-Finance 104 MITASU MANSION SHANTINAGAR PONDA GOA | SOUTH GOA | GOA | 403103 | ₹61.8 L | L1 | Accepted-Finance LOWEST BIDDER |
| 2 | L2₹67.6 L+₹5.8 L (9.45%)Rejected-Finance | ₹67.6 L+₹5.8 L (9.45%) | L2 | Rejected-Finance QUOTED HIGHER THAN L1 |
Tender Value
₹66.4 L
EMD Value
₹1.3 L
Closing Date
16 Jun 2026, 11:00 amClosed
EXECUTIVE ENGINEER
DISTRICT RURAL DEVELOPMENT AGENCY - KUSHAWATI MATHANY SALDANHA ADMINISTRATIVE COMPLEX BLOCK NO 202, 2ND FLOOR NEW COLLECTORATE BUILDING SOUTH MARGAO-GOA
Construction of Stage and Developmental Works in Survey No. 39-13 of Village Canacona near Shree Nirakar Temple at Khalwadem in V.P Shristhal of Canacona Taluka (Re-tender 2nd call)
2026_DRD_29665_1
DRDA-K/EW/GGSY/2026-2027/28
Open Tender
Civil Works
Percentage
360 days
SHRISTHAL CANACONA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.3 L
18 Aug 2026
9 Jun 2026
17 Jun 2026
9 Jun 2026
16 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | |||||
| 1.01 | All kinds of soil 50% total Qty i.e. 440.69*50/100 | 440.69 | M3 | - | - |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 177.14 | M3 | - | - |
| 3Providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering, shuttering and finishing in: | |||||
| 3.01 | All works upto plinth level | 179.29 | M3 | - | - |
| 3.02 | In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. | 105 | M3 | - | - |
| 4Centering & shuttering including Strutting, Propping & removal of forms for : | |||||
| 4.01 | Vertical surfaces such as retaing walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like | 210 | M2 | - | - |
| 4.02 | Foundations, Footings, Bases for columns | 27.84 | M2 | - | - |
| 4.03 | Columns, Piers, Pillars, Aburments, Posts and struts (square rectangle polygon in plan) | 62.22 | M2 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_30087.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .