Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical PQC Qualified |
| 2 | Accepted-Technical | Accepted-Technical PQC Qualified |
| 3 | Rejected-Technical | Rejected-Technical PQC not Qualified |
Tender Value
₹1.6 L
EMD Value
₹3,200
Closing Date
21 Jan 2020, 6:00 pmClosed
SE OMCIII BTPS OBRA SONEBHADRA
OFFICE OF SE OMCIII BTPS OBRA SONEBHADRA
Checking and binding the loosened faeteners of stator winding damaged loosed wedges spacers etc during OH of 6 point 6 Kv HT motors of 200 MW Units no 11
2020_RVUNL_420592_1
T19 OMCIII EMD III BTPS 2019 20
Open Tender
Electrical Works
Lump-sum
365 days
BTPS OBRA SONEBHADRA
Please refer Tender documents.
4 documents required · 4 mandatory
₹296
DY CAO CFA AND BO BTPS OBRA SONERBHADRA
₹3,200
19 Jun 2020
7 Jan 2020
23 Jan 2020
7 Jan 2020
21 Jan 2020
7 Jan 2020
7 Jan 2020 - 21 Jan 2020
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .