Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.4 CrAdmitted-Finance | ₹84.4 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical REJECTED |
| 3 | Rejected-Technical | - | - | Rejected-Technical REJECTED |
| Sl No | Description | Qty | Unit | Ultra Mega Power Private Limited L1 |
|---|---|---|---|---|
| 1.00 | Design, Engineering, Supply, Installation and Commissioning of an 8 MW Wind Farm at VOCPA Port Estate, Tuticorin, including Civil, Electrical and Communication Works, Power Evacuation System, Grid Connectivity in compliance with DISCOM (TANGEDCO) norms, along with a 2-year warranty and free Operation & Maintenance (O&M) period, Design, Engineering, Supply, Installation, Testing and Commissioning of a 5 MWh Battery Energy Storage System (BESS), including integration with the Renewable Energy infrastructure and grid system, in compliance with applicable DISCOM norms, along with a 2-year comprehensive warranty and free Operation & Maintenance (O&M) period.Integration of all Renewable Energy projects with the Port’s power and grid systems, and development of a centralized real-time monitoring and analytics Dashboard with a 2-year free comprehensive maintenance Period. | 1 | set | 84,40,55,078 ₹84.4 Cr |
Tender Value
₹80.4 Cr
EMD Value
₹1.6 Cr
Closing Date
23 Feb 2026, 3:00 pmClosed
CME
CME
Design Engineering Supply Installation and Commissioning of Integrated Renewable and Battery Energy Storage System BESS of 8MW Wind Farm 5 MWh BESS at VOCPA
2026_VOCPT_265050_1
MEE-PM-8155-2026-1
Open Tender
Electrical Works
390 days
VOCPA
Refer tender
6 documents required · 6 mandatory
₹0
₹1.6 Cr
Yes
VOCPA
6 Mar 2026
31 Jan 2026
24 Feb 2026
31 Jan 2026
23 Feb 2026
31 Jan 2026
10 Feb 2026
Design, Engineering, Supply, Installation and Commissioning of an 8 MW Wind Farm at VOCPA Port Estate, Tuticorin, including Civil, Electrical and Communication Works, Power Evacuation System, Grid Connectivity in compliance with DISCOM (TANGEDCO) norms, along with a 2-year warranty and free Operation & Maintenance (O&M) period, Design, Engineering, Supply, Installation, Testing and Commissioning of a 5 MWh Battery Energy Storage System (BESS), including integration with the Renewable Energy infrastructure and grid system, in compliance with applicable DISCOM norms, along with a 2-year comprehensive warranty and free Operation & Maintenance (O&M) period.Integration of all Renewable Energy projects with the Port’s power and grid systems, and development of a centralized real-time monitoring and analytics Dashboard with a 2-year free comprehensive maintenance Period.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
01.pdf
Tender Documents • 2.09 MB
BOQ_307708.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid