Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.4 CrAdmitted-Finance | ₹84.4 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical REJECTED |
| 3 | Rejected-Technical | - | - | Rejected-Technical REJECTED |
| Sl No | Description | Qty | Unit | Ultra Mega Power Private Limited L1 |
|---|---|---|---|---|
| 1.00 | Design, Engineering, Supply, Installation and Commissioning of an 8 MW Wind Farm at VOCPA Port Estate, Tuticorin, including Civil, Electrical and Communication Works, Power Evacuation System, Grid Connectivity in compliance with DISCOM (TANGEDCO) norms, along with a 2-year warranty and free Operation & Maintenance (O&M) period, Design, Engineering, Supply, Installation, Testing and Commissioning of a 5 MWh Battery Energy Storage System (BESS), including integration with the Renewable Energy infrastructure and grid system, in compliance with applicable DISCOM norms, along with a 2-year comprehensive warranty and free Operation & Maintenance (O&M) period.Integration of all Renewable Energy projects with the Port’s power and grid systems, and development of a centralized real-time monitoring and analytics Dashboard with a 2-year free comprehensive maintenance Period. | 1 | set | 84,40,55,078 ₹84,40,55,078 Lowest |
Tender Value
₹80.4 Cr
EMD Value
₹1.6 Cr
Closing Date
23 Feb 2026, 3:00 pmClosed
CME
CME
Design Engineering Supply Installation and Commissioning of Integrated Renewable and Battery Energy Storage System BESS of 8MW Wind Farm 5 MWh BESS at VOCPA
2026_VOCPT_265050_1
MEE-PM-8155-2026-1
Open Tender
Electrical Works
Lump-sum
390 days
VOCPA
Refer tender
6 documents required · 6 mandatory
₹0
₹1.6 Cr
Yes
VOCPA
6 Mar 2026
31 Jan 2026
24 Feb 2026
31 Jan 2026
23 Feb 2026
31 Jan 2026
10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design, Engineering, Supply, Installation and Commissioning of an 8 MW Wind Farm at VOCPA Port Estate, Tuticorin, including Civil, Electrical and Communication Works, Power Evacuation System, Grid Connectivity in compliance with DISCOM (TANGEDCO) norms, along with a 2-year warranty and free Operation & Maintenance (O&M) period, Design, Engineering, Supply, Installation, Testing and Commissioning of a 5 MWh Battery Energy Storage System (BESS), including integration with the Renewable Energy infrastructure and grid system, in compliance with applicable DISCOM norms, along with a 2-year comprehensive warranty and free Operation & Maintenance (O&M) period.Integration of all Renewable Energy projects with the Port’s power and grid systems, and development of a centralized real-time monitoring and analytics Dashboard with a 2-year free comprehensive maintenance Period. | 1 | set | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
01.pdf
Tender Documents • 2.09 MB
BOQ_307708.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].