Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC | L1 | Accepted-AOC Accepted |
Tender Value
₹1.3 L
Closing Date
17 Mar 2023, 2:00 pmClosed
EEOMVELLORE
EEOMVELLORE
Works Contract for 1No Imp proposal for SQ into 2Q Conversion with strengthening of conductor due to rectify the low voltage problem at pillaiyarkovil street and Bajanaikovil street at exgNaganathi SS VI 100KVA in respect of AE Kilarasampet Sec
2023_EB_293221_1
EE04121_6
Open Tender
Electrical Works
Works
180 days
Kilarasampet
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
3 Apr 2023
7 Mar 2023
18 Mar 2023
7 Mar 2023
17 Mar 2023
7 Mar 2023
Amount
Excavation and Erection of RCC, REC, PSC poles upto 8.00m length by using JCB/Manual with Base Plate.
Excavation and Erection of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding, Stay Plate etc.
Fixing of LT 3 Phase cross arm
Fixing of LT single Phase cross arm
Fixing of HT / LT TI Fitting
Fixing of LT Pin & Insulator
Fixing of LT Shackle
Aluminum Knob
Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor /AB Cable upto 7/3.35mm ACSR. (route length)
Paving and stringing of conductors of size 7/2.59 mm ACSR or other equivalent conductor (route length)
Transporting of all types of poles by bullock cart or other vehicle (for all size of poles including loading and unloading) for a lead upto 5KM
Transporting of Distribution Transformer / Line materials from Sub stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor(lorry)
Transporting of Distribution Transformer from stores to office/ site upto 10KM distance by engaging 1 ton capacity Minidor(lorry)
Loading/Unloading of variouse size of REC, RCC,PSC Poles upto 8.0m length
Loading/Unloading of line material
Dismantling of X arms
Manufacturing of earth pipe clamps for structure including drilling and welding of clamps.
Open type side arm stud, cutting, drilling holes
Mass concreeting including materials
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .