Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹76.9 L
EMD Value
₹1.5 L
Closing Date
2 Dec 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
ELEC. GENL
15 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' which ever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure VI-B, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet
All financial documents submitted by bidders for financial eligibility, such as audited balance sheets, financial turnover certificates, and banking references towards liquidity (where applicable), and other CA-certified financial documents, shall invariably bear a valid UDIN (Unique Document Identification Number) issued by the Institute of Chartered Accountants of India (ICAI), wherever applicable. The financial documents submitted for evaluation shall be current, valid and relevant to the tender under consideration and shall conform to the eligibility conditions stipulated in the tender document. Documents not complying with the prescribed requirements, including those not bear a valid UDIN wherever applicable, shall not be considered for financial evaluation. {Authority: CEGE Letter no: SC/XXIX/Vig dated: 28/07/2026.}
The contractor shall hold a valid Electrical Contractor License issued by the competent State Electrical Licensing Board / Chief Electrical Inspectorate, duly authorizing the execution of Low Tension (LT) electrical installation works up to 650 Volts, including 415 V three-phase systems. Submission of a valid electrical contractor license along with the bid is mandatory. Failure to upload the same shall render the offer liable for rejection.
The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: 1. Three similar works each costing not less than the amount equal to 30% of advertised value, or 2. Two similar works each costing not less than the amount equal to 40% of advertised value or 3.One similar work each costing not less than the amount equal to 60% of advertised value Note: Separate completed works of minimum required values for each component can also be considered for fulfillment of technical eligibility criteria for different components. *Similar Single work is defined as "Works involving wiring/lighting with 240V, 1 Phase or 415V, 3 phase system with control gear and protection arrangements in residential buildings or service buildings or railway stations/yards or colony/highway lighting".Authority CEGE Letter No:E.252/I/8/G Dt:02/08/2013.NOTE:- Certificates from private individuals for who such works are executed / being executed will not be accepted.
30 conditions · 6 needing a document upload
The Stores materials which are supplied by Railways shall be collected from SSE/E/Works/SA stores duly transporting the same to the site by own cost borne by the contractor only.The released Railway materials if any should be handed over to the maintenance concerned SSE/Power stores duly getting forwarding acknowledgement from SSE/E/Works concerned.
I/We also hereby agree to abide by the updated Regulations of Tenders and Contracts and General Conditions of Contract issued by the Engineering Department of Indian Railways along with correction slips issued from time to time and to carry out the work according to the Special Conditions of Contract and specifications of materials and works as laid down by Railway in the Annexed Special Conditions / Specifications,Schedule of Work for the present contract.
All rates quoted in the tenders shall be deemed to be inclusive of CGST,SGST, IGST etc., payable by the contractor to the Government or any public body and no additional amount/rate or claim will be entertained on this account by the Railways. Also no claim whatsoever will be accepted by Railways on account of revision of tax rates, new taxes of statutory natureby State/Central Govt.
I/We have read the various conditions to tender attached hereto and agree to abide by the said conditions
I/We also agree to keep this tender open for acceptance for a period of 60 days from the date fixed for opening the same
I/We offer to do the work for Senior Divisional Electrical Engineer, Electrical General, Salem Division, Salem, at the rates quoted in the attached schedule and hereby bind myself/ourselves to complete the work in all respects within the period of completion stipulated in the tender document, from the date of commencement of work of the tender. The amount as stipulated in the tender document is herewith forwarded as Earnest Money. Full value of the earnest Money shall stand forfeited without prejudice to any other right or remedies in case my/our Tender is accepted and if : (a) I/We do not execute the contract documents as stipulated in performance guarantee clause of GCC 2022 as detailed in general instructions. (b) I/We do not commence the work within seven days after receipt of LOA/orders to that effect.
I/We hereby Confirm that the rates, rebates and/or other financial terms, if any, quoted by us in the relevant fields of the Financial Bid page will only be the ruling terms for deciding the inter-se ranking, and any such condition having financial repercussions, if quoted by us anywhere else including attached documents shall not be considered for deciding inter-se ranking. However, Railways shall have the right to incorporate any such condition quoted by us, in the contract, at their discretion, if contract is placed on us.
The Tenderer should submit a copy of GST/PAN and NEFT Form.
The Contractor shall submit a statement to the effect that no retired Engineer or retired Gazetted Officer is associated with the tenderer as per Appendix-D. Tenders without the information above referred to or a statement to the effect that no such retired Engineer or retired Gazetted Officer is so associated with the tenderer, as the case may be, shall be rejected.
The Contractor shall have the option to take payment from Railways through a letter of credit (LC) arrangement, the detailed formalities for which is as per Railway Board letter No. 2018/CE-I/CT/9 dt. 04/06/2018.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Deployment of Qualified Engineers at Work Sites by the Contractor - The Contractor shall employ 1 No. of qualified Graduate Engineer for works Rs. 200 Lakh or more and 1 No. of Diploma Engineer for works costing more than Rs. 25 Lakh, but less than Rs 200 Lakh.
Payment of Security Deposit/EMD and Tender form cost should be made on line only.
Salem Division: Construction of New Terminal building at Erode Railway Station- Electrical arrangements.
SA-E19-2026-27-W1~SR
SA-E19-2026-27-W1
Open
Works - General
12 Months
Salem, Tamil Nadu
₹0
₹1.5 L
10 Nov 2026
10 Nov 2026
18 Nov 2026
152 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 8,81,350 | ||
| — | 400.00 | — | — | ||
| Excavation of Cable trench in all kinds of soil including refilling as per Drg. No. CEE /CN/MS/01-2018. | — | — | — | 2,16,800 | |
| — | 10.00 | — | — | ||
| Excavation of Cable trench across the concrete flooring / road / track as per Drg. No. CEE/CN/MS/01-2018. | — | — | — | 7,390 | |
| — | 10.00 | — | — | ||
| Breaking of cement concrete flooring as instructed by Engineer-in-charge at site. | — | — | — | 5,120 | |
| — | 10.00 | — | — | ||
| Supply and provision of mass concrete for platforms or elsewhere with 1:3:6 ratio using 20 mm blue metal complete in a manner as directed by the Section Engineer in charge at site. | — | — | — | 61,070 | |
| — | 600.00 | — | — | ||
| Labour charges for laying of HDPE pipes 63 mm dia PN 6 and PE 100 type in excavated trenches, on walls, platforms, platform shelters or any other required location, complete with suitable fixing arrangements and necessary coupling/jointing works, as directed by the Section Engineer-in-charge at site. The work includes handling, aligning, positioning, jointing and securing the HDPE pipes to ensure proper routing, protection and continuity. Note: Required HDPE pipes will be supplied by Railways. | — | — | — | 17,400 | |
| — | 1780.00 | — | — | ||
| Labour Charges for Laying of 110 mm Dia PE 100 PN 6 type HDPE pipes in the excavated trench, on walls or on platform shelter etc., including suitable fixing arrangement complete in a manner as directed by Section Engineer-in-charge at site.(Note: Required HDPE Pipe will be supplied by Railways.) | — | — | — | 92,560 | |
| — | 50.00 | — | — | ||
| Supply and fixing of medium duty GI pipe of 65 mm dia, conforming to IS.1239,part 1 (2004) ,for cable leading without clamp complete in an approved manner and as directed by Engineer in charge at site. | — | — | — | 41,800 | |
| — | 4250.00 | — | — | ||
| Supply and laying of 6 SWG GI wire along with the LTUG Cable, for earth continuity confirming to IS 12776 complete in an approved manner and as directed by Engineer in charge at site. | — | — | — | 1,65,750 | |
| — | 50.00 | — | — | ||
| Supply and fixing of cable route indicator made of cast iron plate type as per specification in drawing No. CEE/CN/MS/11-2004 complete in an approved manner and as directed by Engineer in charge at site. | — | — | — | 27,100 | |
| — | 550.00 | — | — | ||
| — | 3700.00 | — | — | ||
| — | 30.00 | — | — | ||
| — | 60.00 | — | — | ||
| — | 30.00 | — | — | ||
| — | 60.00 | — | — | ||
| — | 350.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderBookletrevised.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
GICableTraySpecification.pdf
ATTACHMENT
LEDNameBoardAnnexure.pdf
ATTACHMENT
Drawings_I_merged.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .