| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.9 LAccepted-Finance GORAKHPUR UTTAR PRADESH 273006 INDIA UDYAM UP 32 0070581 | GORAKHPUR | UTTAR PRADESH | 273006 | ₹48.9 L | L1 | Accepted-Finance 1st Lowest Bidder |
| 2 | L2₹54.5 LRejected-Finance | ₹54.5 L | L2 | Rejected-Finance 2nd Lowest Bidder |
| 3 | L3₹55.5 LRejected-Finance | ₹55.5 L | L3 | Rejected-Finance 3rd Lowest Bidder |
Tender Value
₹49.0 L
EMD Value
₹49,000
Closing Date
5 Feb 2026, 5:00 pmClosed
Superintending Engineer
Electricity Transmission Circle, UPPTCL, Pareshan Bhawan , Mohaddipur, Gorakhpur
SUPPLY OF MATERIALS AND WORK OF SHIFTING / HEIGHT RAISING OF 132 KV BARAHUWA- GIDA LINE (LOCATION No. 27-29) UNDER ETD-II, GORAKHPUR DUE TO INFRINGING IN THE CORRIDOR OF SAHJANWA-DOHARIGHAT NEW RALWAY LINE PROJECT PROPOSED BY NORTH EASTERN RAILWAY ,
2026_UPTCL_1104820_1
E-Tender No. 67-ETC(G)/2025-26
Open Tender
Electrical Works
180 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
SE, ETC, Gorakhpur
₹49,000
17 Feb 2026
8 Jan 2026
6 Feb 2026
8 Jan 2026
5 Feb 2026
8 Jan 2026
Part (A)-Supply of Material
24Fibre(DWSM) OPGW Fibre Optic Cable
Supply of Hardware set for 24Fibre OPGW
Joint Box(24 Fibre)
TOWER ACCESSORIES-
Number Plate
Danger Plate
Circuit Plate (set of two)
Phase Plate in sets of red, blue and yellow for Tension towers
132KV Pipe type earthing material for towers
PORCELAIN DISC INSULATORS
HARDWARE SUITABLE FOR ACSR Panther
Single Tension fittings
Double Tension fittings
vibration Dampers
Mid Span compression Joint
Repair sleeves
Part(B)-WORK ASSOCIATED WITH CONSTRUCTION OF NEW LINE PORTION AND INTERCONNECTION WITH EXISTING LINE
FOUNDATION WORK
Survey including preparation of schedule of materials, marking of locations(route length), GPS survey of linewith co-ordinates of each tower(the length of lineshall be authenticated by GPS Survey)
Soil Investigation Test (All kind of soil)
Check survey & Peg marking
Excavation of 132 KV Tower foundation including all earth work, back filling, leveling, watering and dewatering if necessary, preparing of crop and land compensation forms etc
Setting of stubs including of all foundation work but excluding the cost of concreting and excavation(Rate per location)for follwing towers
132 KV DB Panther
132 KV DC Panther
Installation of steel reinforcement of concrete foundation including cost of steel bars, cuitting, bending & placing etc.
Concreting of foundation including cost of arrangement of form boxes, shoring, shuttering & back filling, curing including the cost of cement, sand & stone ballast etc. But excluding cost of reinforcement bars.
1:2:4 concreting
ERECTION/ STRINGING WORK
Transportation of all material from various stores under ETD-II Gorakhpur to site as required.
Erection of 132 KV towers including proper tightening, fixing/punching of number plates, phase plate & danger plates, bird guard, preparing of crop compensation forms etc.
Tack welding of all the bolts uo to height of one section of the tower or 5 meter from ground level whichever is higher with three tacks at 1200 seperation of minimum 10 mm thickness with 10mm/12mm electrodes& application of Zinc rich Aluminium paint on the affected surface including cost of all material including tack welding of River Crossing tower&Anchor tower
Grounding work including earth work etc for pipe type grounding including cost of coke & salt.
Laying, stringing, tensioning clamping, jointing etc of ACSR Panther conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all three phases of 132 KV SC lines, preparing of crop compensation forms etc.
Laying, stringing, tensioning clamping, jointing,including fitting of all necessary Hardware and accessories of OPGW&OFAC,terminationat S/S,end to end connectivity&testing etc of 132KV&220 KV lines
DISMANTLING WORK
Anchoring of section towers by providing stay on cross arms of section towers before removal of old conductors including suitable fixing of stay rod by making CC foundations and removal there of after completion of work (01 Job per Arms)
Construction of scaffolding of sufficient height on both side of H.T/L.T line for providing sufficient clearance to conductors during stringing & de-stringing of ACSR Panther conductor as per requirement
Dismantling of 03 (Three) phases existing ACSR Panther conductor all hardware fiting and conductor accessories e.g. Armour rod, vibration dampers, insulator strings etc of existing line and re-rolling of dismantled conductor are empty drum on re-use safety transportation of all removed material to UPPTCL store. (Quantity has been taken double for 3 phase)
De-stringing of 24 Fibre OPGW cable along with hardware fitting,joint box and its proper rolling
Dismantling and Stacking of 132 KV Single Circuit towers after cutting of bolt with all safety and precaution along with associated works. Dismantling of the tower is done piece by piece in a safe manner by removing the tack welding / punching, un-fastening the bolts &nuts in a systematic manner, the members so dismantled shall have to be in such a condition that the same can be re-used in future. To the maximum possible extent as cutting / cutting shall have to be avoided. Similarly, while de-stringing the materials are to be removed carefully without damage to the materials (Conductor/ Insulators / Hardware fittings etc.). The removed/released materials are to be re-used to the extent possible.
Dismantling of earlier foundation which includes Excavation,breaking of foundation upto 2 mtr depth and removing of concrete,cutting,removing of stubes and steel reinforcement,backfilling,levelling and making field suitaable for agriculture.
Transportation/Carriage of dismantled material (tower parts) from site to store at 220KV S/S Barahuwa,Gorakhpur along with loading, unloading, stacking
CORRIDOR CLEARANCE WORKS FOR NEW LINE PORTION
Cutting of different types of trees like mango,Neem,Sheesham,Eucalyptus,popular etc. having follwing Girths aand falling in the range of corridor of above Transmission Line to Provide Minimum allowed ROW Clearence for 220 KV line &Conductors on both side of the tower/Line with all due Care of safety&Precautions to Avoid any damage to nearby Building,Power&Telephone Lines passing nearby,crops,other nearby Trees etc.The work also includes Removing,Eliminating&Cleaning the Lines Sites after Cutting of the Trees
Trees having Trunk upto 1.0 mtr girth
Trees having Trunk upto 1.0 mtr to above girth
Lopping&Chopping of Branches of Different types of Trees like Mango,Neem,Sheesham,Peepal,Semal,Eucalyptus,Popular etc.,Falling in the range of Corridor of the above Transmission Lines to Provide the Minimum allowed ROW Clearence for 220 KV line &Conductors on both side of the tower/Line with all due Care of safety&Precautions to Avoid any damage to nearby Building,Power&Telephone Lines passing nearby,crops,other nearby Trees etc.The work also includes Removing,Eliminating&Cleaning the Line Sites after Lopping&Chopping of the Trees.
Cutting,Lopping &Chopping of Bamboo Koty falling the range of line corridor above transmission line with all due Care of safety&Precautions to Avoid any damage to nearby Building,Power&Telephone Lines passing near vicinity of trees with all cost of men,misc consumable and T&P etc. required for the job
Please Enable Macros to View BoQ information
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_2038353.xls
BOQ • 0.45 MB
Technical67.pdf
Tender Documents • 0.88 MB
Download all tender documents and submit your bid