Construction of fire protection wall in between power transformer I and II at Somanur 110 33 11KV Sub Station
2024_EB_491988_1
SE/CEDC/S/C/No.12/24-25
Open Tender
Civil Works
Works
270 days
Somanur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
3 Dec 2024
8 Oct 2024
23 Oct 2024
8 Oct 2024
22 Oct 2024
8 Oct 2024
Amount
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc., complete as per standard specification.
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in soft disinegrated rock, laterite, soft rock or kankar, not requiring blasting etc., complete as per standard specification.
Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in medium rock and dense medium rock not requiring blasting etc., complete as per standard specification.
Supplying and filling of M.sand in foundation and basement with well consolidation, watering including cost of all materials, labour, lead,lift, etc., complete.
PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation and flooring including cost of all materials, M.sand, curing, labour, lead, lift, etc. complete.
Brick work in CM 1:5 mix using class II chamber burnt bricks of size for super structure including cost of all materials, M.Sand, Curing, labour, lead, lift, curing, etc., complete.
RCC 1:1.5:3 using 12-20mm HBS machine crushed metal for raft foundation including cost of all materials, M.sand, curing, vibrating charges, labour, lead, lift, etc., complete, but excluding cost of steel reinforcement. (Raft)
RCC 1:1.5:3 using 12-20mm HBS machine crushed metal for column concrete with form work including cost of all materials, M.Sand, curing, vibrating charges, labour, lead, lift, etc., complete. But excluding cost of steel reinforcement. For column concrete upto Ground level
RCC 1:1.5:3 using 12-20mm HBS machine crushed metal for column concrete with form work including cost of all materials, M.Sand, curing, vibrating charges, labour, lead, lift, etc., complete. But excluding cost of steel reinforcement. For column concrete above Ground level
RCC 1:1.5:3 using 12-20mm HBS machine crushed metal for column concrete with form work including cost of all materials, M.Sand, curing, vibrating charges, labour, lead, lift, etc., complete. But excluding cost of steel reinforcement. For column concrete above Lintel level (Under LC condition)
RCC 1:1.5:3 mix using 12-20mm HBS machine crushed metal for Grade beam with form work including cost of all labour, materials, M.Sand,curing, vibrating charges, labour, lead, lift, etc. complete. But excluding cost of steel reinforcement.
RCC 1:1.5:3 mix using 12-20mm HBS machine crushed metal for continuous lintel and roof beam with formwork including cost of all materials, M.Sand, curing, vibrating charges, labour, lead, lift, etc., complete but excluding cost of steel reinforcement. (Ground floor)
RCC 1:1.5:3 mix using 12-20mm HBS machine crushed metal for continuous Roof beam with form work including cost of all materials, M.Sand, curing, vibrating charges, labour, lead, lift, etc., complete but excluding cost of steel reinforcement. (under LC condition)
RCC 1:1.5:3 mix using 12-20mm HBS machine crushed metal for precast slab with form work including cost of all materials, M.Sand, curing, vibrating charges, labour, lead, lift, etc., complete but excluding cost of steel reinforcement. (Ground floor)
Refilling with excavated earth other than sand in foundation and well consolidation, watering including labour, lead , lift, etc., complete as per standard specification.
Disposal of excess of surplus earth away in low lying, area with a lead of 100 m including spreading and levelling labour, lead, lift etc., complete
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, typing and fixing in position as per specification including cost of all materials, binding wire, labour, lead and lift etc., complete.
Plastering with cm 1:5 mix using 12mm thick for inside & outside walls, including cost of all materials, M.Sand, curing, labour, lead, lift etc., complete.
Colour washing two coats of cement paint over one coat of primer using white cement for outside wall surface including cleaning the plastered surface, cost of all materials, labour lead, lift etc., complete.
Labour charges for transporting from casting yard to curing tank, curing tank to fixing location, erection and installation of precast / Pre stressed concrete element in correct and final position with proper line level and plumb at site making arrangement (i.e. Cranes, push-pull jacks and all other tools and plants for lifting, placing and allignment of elemental, with in erection tolarance and all complete as per the direction of Engineer in charge including cost of all materials, labour, lead, lift etc., complete
Supply and fixing of ISMC 100 C Type channal for inserting of precast slabs etc including cost of all materials, labour, painting two coat over one coat of iron primer, lead, lift etc., complete
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .