| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-AOC SENGADU PO EDAPPULI NADU KOLLIHILLS TK PIN 637411 | KOLLIHILLS | NAMAKKAL | TAMIL NADU | 637411 | ₹11.5 L | L1 | Accepted-AOC Lowest Rated Quoted by L.K.Murugan |
| 2 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Not Registration for RD Departments |
| Sl No | Description | Qty | Unit | P MADASAMY L2 | Murugan L1 |
|---|---|---|---|---|---|
| 1.00Construction of 3m Span culvert at Kela Velayuthapuram village in Mela Arasadi Panchayat | |||||
| 2.00 | Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation. As per SS20B | 78.13 | m³ | 276.97 ₹21,639.67 | 263.65 ₹20,598.97 |
| 3.00 | Plain Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith including handling charges for the same at the both ends cost and labour for mixing, laying and watering, curing and compacting the concrete and labour for form work and all other incidental charges such as baling out water providing protective bunds, cofferdams etc complete for foundation concrete. | 10.78 | m³ | 6,350.67 ₹68,460.22 | 6,045.24 ₹65,167.69 |
| 4.00 | Cement concrete1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete | 88.2 | m³ | 6,639.41 ₹5.9 L | 6,320.09 ₹5.6 L |
| 5.00Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting) | |||||
| 6.00 | Below Ground Level | 176.67 | m³ | 574.88 ₹1.0 L | 547.23 ₹96,679.12 |
| 7.00 | Above Ground Level | 33.12 | m³ | 1,149.75 ₹38,079.72 | 1,094.45 ₹36,248.18 |
| 8.00 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete. | 3.38 | m³ | 7,722 ₹26,100.36 | 7,350.61 ₹24,845.06 |
| 9.00 | Reinforced Cement Concrete 1:11/2:3 using 20 mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith and excluding cost and fabrication of steel and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete for Deck slab | 8.1 | m³ | 10,284.56 ₹83,304.94 | 9,789.92 ₹79,298.35 |
| 10.00 | Supply and fabrication of Steel Grade S-415/Steel Grade S-240 required for all RCC items of works involved in the schedule including cost of steel which will be procured by the contractor by his own arrangement, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of space bars, cover blocks and all other incidental charges etc., complete as per standard specification | 0.81 | m³ | 96,548.55 ₹78,204.33 | 91,905.02 ₹74,443.07 |
Tender Value
₹11.8 L
EMD Value
₹11,750
Closing Date
4 Mar 2026, 3:00 pmClosed
BDO VP Ottapidaram
Block development office Ottapidaram
Construction of 3m Span culvert at Kela Velayuthapuram village in Mela Arasadi Panchayat
2026_RDTN_667195_1
BDOoprm A1/043/2018 Dt25.02.2026
Open Tender
Civil Works - Bridges
180 days
Ottapidaram block
As per tender Scheudle
4 documents required · 4 mandatory
₹0
₹11,750
Block development office Ottapidaram
7 Apr 2026
26 Feb 2026
4 Mar 2026
26 Feb 2026
4 Mar 2026
26 Feb 2026
26 Feb 2026
Construction of 3m Span culvert at Kela Velayuthapuram village in Mela Arasadi Panchayat
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation. As per SS20B
Plain Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith including handling charges for the same at the both ends cost and labour for mixing, laying and watering, curing and compacting the concrete and labour for form work and all other incidental charges such as baling out water providing protective bunds, cofferdams etc complete for foundation concrete.
Cement concrete1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete
Supply and erecting centering for sides and sofits including supports and strutting upto 3.29 m. height for plane surfaces in all floors with all cross bracings using mild sheets of sixe 90 cm. x 60 cm.and 10 gauge stiffened, welded with mild steel angles of size 25 m. x 25 mm. x 3 mm. for boarding laid over silver oak (country wood) joist of size 10 cm. x 6.5 cm. dia spaced at about 90 m. centre to centre etc., complete and complying with standard specification and as directed for the following items. (Below sill - without struting)
Below Ground Level
Above Ground Level
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete.
Reinforced Cement Concrete 1:11/2:3 using 20 mm ISS HBG metal including cost and conveyance of all materials from approved sources to site including cost of cement which will be supplied departmentally and cost of same will be recovered from the contractror bill at the rate specified by in the special condition appended herewith and excluding cost and fabrication of steel and including labour charges for form work and centering labour charges compacting curing and all other incidental charges etc complete for Deck slab
Supply and fabrication of Steel Grade S-415/Steel Grade S-240 required for all RCC items of works involved in the schedule including cost of steel which will be procured by the contractor by his own arrangement, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of space bars, cover blocks and all other incidental charges etc., complete as per standard specification
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_801513.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.66 MB
01Technicalbid.pdf
Tender Documents • 0.82 MB
BOQ_801513.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid