| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.2 CrAccepted-AOC OFFICE NO 515 PLOT NO 194 NMS ICON SECTOR 19 ULWE NAVI MUMBAI MAHARASHTRA 410206 | NAVI MUMBAI | THANE | MAHARASHTRA | 410206 | L1 | Accepted-AOC Accept | |
| 2 | L2₹62.5 Cr+₹1.4 Cr (2.22%)Rejected-AOC 401 402 AMIT CRYSTAL ABOVE BANK OF BARODA SENAPATI BAPAT ROAD PUNE 411016 SHIVAJI NAGAR PUNE MAHARASHTRA 411016 | PUNE | MAHARASHTRA | 411016 | L2 | Rejected-AOC Reject | |
| 3 | Rejected-Technical | - | Rejected-Technical Disqualified |
Tender Value
₹55.7 Cr
EMD Value
₹27.9 L
Closing Date
24 May 2024, 6:00 pmClosed
Executive Engineer
Executive Engineer P. W. Building Div. Pune at Govt. Milk Scheme Campus
Construction Of State Level Office Building For Settlement Commissioner and Director of Land Record M.S. Pune, At Pune
2024_PWDRP_1038445_1
E-Tender Notice No. 38 for 2023-24
Open Tender
Civil Works
Item Rate
545 days
Yerawada Pune
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
₹27.9 L
Chief Engineer, P. W. Region, Pune
28 Aug 2024
24 Apr 2024
27 May 2024
24 Apr 2024
24 May 2024
24 Apr 2024
30 Apr 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK -
Removing grass, gazer grass and disposing off out of building premises including making clean the ground by shovel and phavaras etc. complete. | 9,206.47 | One Square Meter | - | - |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 3,910.93 | One Cubic Meter | - | - |
| 3 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means | 2,209.08 | One Cubic Meter | - | - |
| 4 | Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m).) By Mechanical Means | 1,919.85 | One Cubic Meter | - | - |
| 5 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means | 1,317.61 | One Cubic Meter | - | - |
| 6 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5m To 3.0 m.) By Mechanical Means | 6,847.85 | One Cubic Meter | - | - |
| 7 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 3.0m To 4.5 m.) By Mechanical Means Increase rate by 20% on basic rate of SSR Item No. 21.16 (as per SSR guidline pg no 6) | 5,840.39 | One Cubic Meter | - | - |
| 8 | Excavation for foundation in Softrock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 m beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary backfilling with available earth/ murum, ramming, watering including shoring and strutting etc.complete. (Lift from 4.5m to 6m) By Mechanical Means Increase rate by 30% on basic rate of SSR Item No. 21.16 (as per SSR guidline pg no 6) | 714.6 | One Cubic Meter | - | - |
| 9 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means Increase rate by 10% on basic rate of SSR Item No. 21.20 (as per SSR guidline pg no 6) | 1,508.15 | One Cubic Meter | - | - |
| 10 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 m beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift from 4.5m to 6m ). By Mechanical Means Increase rate by 30% on basic rate of SSR Item No. 21.20 (as per SSR guidline pg no 6) | 1,919.45 | One Cubic Meter | - | - |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1815672.xls
BOQ • 1.11 MB
143820545.pdf
Tender Documents • 2.69 MB
143820547.html
Tender Documents • 0.05 MB
DTPJamabandiUploaded.pdf
Tender Documents • 16.32 MB
Drawings.pdf
Tender Documents • 4.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .