Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-Finance | L1 | Accepted-Finance Quoted lower Rate | |
| 2 | L2₹3.2 L+₹36,830 (13.1%)Accepted-Finance | L2 | Accepted-Finance Quoted Higher Rate | |
| 3 | L3₹3.6 L+₹82,550 (29.3%)Accepted-Finance | L3 | Accepted-Finance Quoted Higher Rate | |
| 4 | L4₹3.8 L+₹1.0 L (36.2%)Accepted-Finance | L4 | Accepted-Finance Quoted Higher Rate | |
| 5 | Rejected-Technical | - | Rejected-Technical Document not submittes as per PQC |
Tender Value
₹4.0 L
EMD Value
₹8,000
Closing Date
29 May 2023, 4:00 pmClosed
SE OMC I BTPS
O/o SE OMC I BTPS ptpp
Rotation/Replacement of 200NB CI pipe line of ESP hopper, CT tower and Bottom Discharge Pipeline during overhauling of Unit 3, 2X210 MW, BTPS, Parichha
2023_RVUNL_799375_1
T-04/AHD/2X210MW/BTPS/2023-24
Open Tender
Power/Energy Projects/Products
Lump-sum
365 days
2X210MW PTPP
as per pqc
3 documents required · 3 mandatory
₹590
Dy. CAO, CFA BO, PTPP, Parichha
₹8,000
19 Jul 2023
28 Apr 2023
31 May 2023
28 Apr 2023
29 May 2023
28 Apr 2023
Amount
Rotation/Replacement of 200NB CI pipeline of ESP Hopper, collector tank tower, and Bottom discharge pipeline of Unit#3.
Repairing/Reassembling/replacement of 200NB sleeve couplings, bends, Y-Piece with fasteners.
Garg Engineering And Sons
INDIA ENGINEERING WORKS
M.A.K. CONSTRUCTION CO.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .