Loading…
Loading…
Tender Value
₹15.4 L
EMD Value
₹46,200
Closing Date
28 Jul 2026, 9:00 am
AGM (Engg. Elect.), CHIAL
AGM (Engg. Elect.), Airports Authority of India, Chandigarh- 160003
Construction of Glide Path and Localizer Building and other associated works inside Airforce Area at Chandigarh Airport. SH- SITC of Gas Suppression and Fire Alarm System
2026_AAI_283161_1
AAI/CHD/Engg. (E)/ILS Gas Suppression/NIT-03/2026-27
Open Tender
Electrical Works
60 days
Inside Airforce Area at Chandigarh Airport
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹46,200
6 Jul 2026
6 Jul 2026
29 Jul 2026
7 Jul 2026
28 Jul 2026
7 Jul 2026
7 Jul 2026 - 13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Design, Supply, Installation,Testing & commissioing of Gas Suppression System including fire gas (FK-5-1-12) of 4.5% concentration, flooding system comprising of the following as per NFPA 2001 standards with Upto date amendments. Supply of Cylinder UL listed /FM/VDS/LPCB and CCOE(PESO) Approved, complete with valve assembly including supervisory switch connection for monitoring cylinder pressure. A pressure gauge with a safety burst disc, electronic control head / Solenoid, pressure operated control, head, flexible hose, strap, NRV and safety cap. Gas - Quantity would be as per the design volume and as per the necessary codal specifications UL Certifications. Clean agent shall be of FK-5-1-12 Gas flooding System with all cylinders, gas, manifold, Master Cylinder Accessories for above including Electrical Control Head and Gas discharge Warning sign, Nozzles etc. complete Gas Suppression System as required. The contractor will design the system as per NFPA 2001 and will get the design approved by AAI before execution, Statutory Approvals if required, will be taken from concerned authorities no extra payment in this regard. The piping design and pressure calculations using manufacturer design software for a given dimension of room duly approved by manufacturer/ distributors shall be submitted prior to starting of the works. | |||||
| 1.1 | SITCof UL & PESO approved Seamless storage 80L cylinder suitable for FK-5-1-12 fire suppression agent complete with valve assembly, pressure gauge, pressure switch with safety burst disk, safety cap, all safety features and other standard accessories etc. including suitable size mounting Straps (2nos. of straps for each cylinder). | 4 | Job | - | - |
| 1.2 | Supply & filling of clean, odourless, colour less, UL listed and suitable for fire class - A, B & C fire suppression agent (FK-5-1-12 fire suppresion fluid) for item no 1.1 complete as per tender specification, as per site requirment & as per direction of Engineer Incharge.(Gas shall be UL Listed and Chromatography Report is required) | 200 | KG | - | - |
| 2 | Supply, Installation, Testing & Commissioning of UL listed Electrical & Manual actuator to operate the gas from the cylinder by an Electrical signal with manual override complete with all accessories as per tender specification and as per site requirment. | 4 | Job | - | - |
| 3 | Supply, Installation, Testing & Commissioning of UL listed High pressure flexible rubber discharge hose with appropriate pressure rating and made of braided reinforcement to route the FK 5-1-12 gas from storage cylinders to the discharge piping complete as required & as per technical specification | 4 | Job | - | - |
| 4 | Supply, Installation, Testing & Commissioning of UL listed Discharge nozzles designed to provide the proper flow and distribution of gas for total flood of hazard area at - 360 degrees or as per tender specification and as per site requirment. | 4 | Job | - | - |
| 5 | Supply, Installation, Testing & Commissioning of Gas discharge pressure switch to trip A.C., electrical equip. etc for FK 5-1-12 System complete as per tender specification and as per site requirment | 2 | Job | - | - |
| 6 | Supply, Installation, Testing & Commissioning of Low pressure supervisory switch for the cylinder assembly etc. for FK-5-1-12 System complete as per tender specification and as per site requirement. | 4 | Job | - | - |
| 7 | Supply, Installation, Testing & Commissioning of Manual Gas Release Station- Lift/Push & Pull Type (Dual-Action), conforming to UL/LPCB/FM/EN with auxiliary contacts for FK 5-1-12 System including integration with Gas Release Panel in conformance to NFPA 2001 standards with Upto date amendments. with complete as per tender specification and as per site requirment. | 4 | Job | - | - |
| 8 | Supply, Installation, Testing & Commissioning of Manual Gas Abort Station- Lift/Push & Pull Type (Dual-Action), conforming to UL/LPCB/FM/EN with auxiliary contacts for FK 5-1-12 System including integration with Gas Release Panel in conformance to NFPA 2001 standards with Upto date amendments. with complete as per tender specification and as per site requirment. | 4 | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
DNITGASSUPPRE.pdf
Tender Documents • 9.07 MB
BOQ_330345.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid