Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 184 13 SECTOR 18 PRATAP NAGAR SANGANER JAIPUR | JAIPUR | JAIPUR | RAJASTHAN | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Technically not qualified |
| 4 | Rejected-Technical | Rejected-Technical Technically not qualified |
| 5 | Rejected-Technical NIRAJ HOUSE SUNDER BAUG NEAR DEONAR BUS DEPOT CHEMBUR MUMBAI MAHARASHTRA 440 088 | Rejected-Technical Technically not qualified |
Tender Value
Refer Docs
Closing Date
10 Jul 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer Project Pushpak
HQ CE (P) Pushpak C/O 99 APO Zemabawk Aizawl Mizoram
DESIGN AND CONSTR OF 216 PT00 MTR SPAN MAJ PMT BR OVER GALETHIYA RIVER AT KM 46 PT 45 AND 24 PT 75 MTR SPAN MINOR PMT BR WITH OVER KRISHNA NALLAH AT KM 38 PT 75 BOTH ON NORTH-SOUTH RD IN ANDAMAN AND NICOBAR ISLAND UNDER 46 BRITF PROJECT PUSHPAK
2021_BRO_628709_1
CE (P) PSK-02 of 2021-22
Open Tender
Civil Works - Bridges
Item Rate
1060 days
AT KM 46 PT 450 AND KM 38.750 ON NORTH SOUTH ROA
As per Tender Documents
16 documents required · 16 mandatory
₹0
Exempted
HQ CE (P) Pushpak C/O 99 APO Zemabawk Aizawl Mizor
24 Aug 2021
3 May 2021
12 Jul 2021
3 May 2021
10 Jul 2021
18 May 2021
4 May 2021 - 27 May 2021
25 May 2021
120 days
Amount
FOR PART-I : GALETHIYA BRIDGE PROPER
Design including proof checking and construction of 216.00 mtr span (3 x 72 mtr) Major Pmt bridge with Steel truss superstructure (Through Type) on Pile Foundation over Galethiya river at Km 46.45 on North-South road under 46 BR(I)TF Project Pushpak in Campbell bay GNI of Andaman & Nicobar island based on hydraulic data, sub soil data, Special conditions, Particular specifications of the tender document. Construction works includes all preparatory work, Pile boring/driving works, Erection of staging/shuttering, abutments, piers, return wall, placing of POT & POT cum PTFE bearings, launching of steel superstructure and casting of RCC decking, wearing coat having nonskid surface in uniform thickness, strip seal expansion joints, RCC crash barriers, foot paths, kerbs, RCC hand rails, drainage spout, load testing of superstructure of bridge, service arrangement for utility, painting of all exposed steel works with painting system 6 as per Table D-2 of IRC 24-2010 or alternative painting with nano technology/ Moisture cured Polyurethene technology considering the bridge being in severe marine environment (Extreme exposure confition), protective works, temporary river training works and diversion, approach slab, and all other items of works required for the completion of the bridge including curing (Both side Approach road works as separate item in Part-2).
FOR PART-II : KRISHNA NALLAHA BRIDGE PROPER
Design including proof checking and construction of 24.75 mtr Single span Minor Pmt bridge with RCC T-Beam girder superstructure over pile foundation over Krishna nallah at Km 38.75 on North-South road under 46 BR(I)TF Project Pushpak in Campbell bay GNI of Andaman & Nicobar island based on hydraulic data, sub soil data, special conditions, particular specifications of the tender document. Construction works includes all preparatory work, Pile boring/driving works, Erection of staging/shuttering, abutments, return wall, placing of bearings, Casting/erection of superstructure including RCC decking, wearing coat having nonskid surface in uniform thickness, strip seal expansion joints, RCC crash barriers, kerbs, RCC hand rails, drainage spout, service arrangement for utility, painting of all exposed steel works with painting system 6 as per Table D-2 of IRC 24-2010 or alternative painting with nano technology/ Moisture cured Polyurethene technology considering the bridge being in severe marine environment (Extreme exposure confition), protective works, temporary river training works and diversion and all other items of works required for the completion of the bridge including curing (excluding both side approach road works)
FOR PART-II : CONSTRUCTION OF APPROACHES (GALETHIYA BRIDGE)
Jungle clearance including cutting down trees not exceeding 30 cm girth measured at 1 meter above ground level and clearing away shrubs brushwood undergrowth and grubbing up roots in areas having annual rainfall more than 200 cm.
Cutting down trees exceeding 30cm girth and not exceeding 75 cm measured at 1m above ground level grubbing up roots filling up holes/hollows rammed properly and leveled including lopping branches, trimming/stacking the useful material & removal of rubbish upto a distance of 20 m.
Cutting down trees exceeding 75 cms girth measured at 1 m above ground level grubbing up roots, filling holes/hollows rammed properly and leveled including lopping branches, trimming/stacking the useful material & removal of rubbish to a distance of 20 m ( each additional 25 cm exceeding 75 cm girth)
Earthwork in embankment by filling with earth free from roots etc. spreading in layers not exceeding 30 cm including watering and finishing to required slope & level not exceeding 1.5 m high above the base in ordinary soil in hill roads where cut & fill method is adopted.
Excavation in trenches not exceeding 1.2 m width and 1.5 m depth in soil/soil mixed with boulders (SMB), including dressing bottom and sides getting out and disposing all excavated material lead upto 6 m and lift upto 1.5 m. (by manual means)
Plain cement concrete 1:4:8 (1 cement: 4 sand: 8 stone aggregate of size 4cm graded downwards) in foundation or elsewhere (excluding the cost of centering/shuttering).
Plain cement concrete 1:2:4 (1cement: 2 coarse sand: 4 stone aggregate size 4cm graded downwards) in foundation or elsewhere (excluding the cost of centering/shuttering).
Reinforced Cement concrete M-20 nearly corresponding to nominal mix, 1 cement: 1.5 sand: 3.0 stone aggregate. of size 20 mm graded downward. (excluding the cost of reinforcement & centering/shuttering)
Centering/Shuttering (Steel) including strutting, propping and removal of formwork (considering 10 times to be used).
Laying reinforcement including cutting bending, binding, providing hooks overlaps etc bars upto 12 mm (labour only).
Earthwork in filling with earth free from roots etc. spreading in layers not exceeding 30 cm including watering and finishing to required slope & level not exceeding 1.5 m high above the base in ordinary soil (For filling in excavated trenches)
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150x75x5 mm spaced 2 mtr centre- to- centre, 1.80 mtr high, 1.10 mtr below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150x75x5 mm, 330 mm long complete as per clause 810 of MoSRT&H specification.
Gabion walling (Gabion Unit are made with double twisted hexagonal shaped steel woven wire mesh machanically sevedge,mesh type 10x12 wire dia 2.7/3.7mm (Zinc+10%Al) Alloy+PVC Coated Size 2x1x1m exclusive of stone).
Gabion walling (Gabion Unit are made with double twisted hexagonal shaped steel woven wire mesh machanically sevedge,mesh type 10x12 wire dia 2.7/3.7mm (Zinc+10%Al) Alloy+PVC Coated Size 1.5x1x1m exclusive of stone).
Gabion walling (Gabion Unit are made with double twisted hexagonal shaped steel woven wire mesh machanically sevedge,mesh type 10x12 wire dia 2.7/3.7mm (Zinc+10%Al) Alloy+PVC Coated Size 1x1x1m exclusive of stone).
Earth work in filling with earth free from roots etc. spreading in layer not exceeding 30 cm including watering and finishing to required slope & level not exceeding 1.5 m high above the base in ordinary soil (For filling in berms)
Preparation of sub-grade in SMB by excavating upto 20 cm avg depth, dressing excavated earth to required camber or super elevation and consolidating with power roller incl watering & disposal of surplus earth within a lead of 30 mtr.
Soil Stabilisation with Biaxial extruded high modulus polypropylene geogrid for base/sub base reinforement having minimum tensile strength of 40 KN/m in longitudinal and transverse direction ,with 14 KN and 28 KN/m tensile strength at 2% and 5% strain respectively in the longitudinal and transverse direction , junction efficiency not less than 95% and with 38 mm x 38 mm mesh opening.
GSB 10 cm thick (compacted ) with stone aggregate conforming to grading No IV as per Tables-400-1 of MORT&H specifications for Road and Bridge Works including supply of material, watering and compaction all complete.
GSB 15 cm thick (compacted ) with stone aggregate conforming to grading No 1 as per Tables-400-1 of MORT&H specifications for Road and Bridge Works including supply of material, watering and compaction all complete.
WBM 75 mm consolidated thickness of stone metal size 63 mm to 45 mm, grading No 1, as per Table-400-9 with type 'A' screening as per Table 400-10 and satisfying the physical requirement as per Table-400-8 of MORT&H specifications, spread, rolled, hollow made up to form true surface blinded and compacted to gradient and camber required all as specified.
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor @ 2.5 Kg/10 Sqm on prepared bituminous/granular surface cleaned with mechanical broom, all complete as per clause 503 of MoSRT&H specifications.
Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer @ 7.50 Kg per 10 sqm. (using BPD with manual labour)
Preparing of WBM surface including scrubbing, cleaning, laying and compacting pre-coated stone chips 0.343 cum (13.2 mm - 0.229 cum-passing 22.4 mm sieve and retained on 11.2 mm sieve and 11.2 mm - 0.114 cum-passing 13.2 mm sieve and retained on 5.6 mm sieve) mixed with 18.65 Kg of binder (grade VG-10), applying a premixed sand seal coat 0.06 cum sand (passing 2.36 mm and retained on 180 micron sieve) with binder (VG-10) 6.83Kg/10sqm and rolling complete as specified, total compacted thickness 25 mm (using tar boiler mixing and spreading with manual labour) (using LDO)
Rakesh Construction Co.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .