Tender Value
₹10.3 Cr
EMD Value
₹20.6 L
Closing Date
3 Jul 2026, 2:00 pm
Similar tender results from the same govt authority in the past 3 years.
General Manager (Zone-4) Agra
H No. A-121, Sec-13, Avas Vikas Colony, Sikandra, Agra
TOURISM DEVELOPMENT WORK AT SAMBHOR BABA DHAM IN DISTRICT- FIROZABAD (U.P)
2026_UPPRC_1162578_1
27/GM-4/UPPCL/2026-27 Dated 18-06-2026
Open Tender
Miscellaneous Works
365 days
Samour Baba Dham Distt Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹17,700
₹20.6 L
Office of General Manager (Zone-4) Agra
22 Jun 2026
22 Jun 2026
3 Jul 2026
22 Jun 2026
3 Jul 2026
22 Jun 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | C.C. ROAD
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | - | cum | - | - | - |
| 2 | Filling By carted earth in trenches, plinth, sides of foundation, campus etc. in layers not exceeding 20 cms in depth, consolidating each deposited layer by ramming and watering including lead upto 50 m & lift upto 1.50 m. | - | cum | - | - | - |
| 3 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. | - | Sqm | - | - | - |
| 4 | Construction of dry lean cement concrete sub base over a prepared subgrade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per specifications,
cement content not to be less than 150 Kg/cum, optimum moisture content
to be determined during trial length construction, concrete strength not to
be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, for all leads & lifts, laid with a mechanical paver, compacting with 8-10 tonne vibratory roller, finishing and curing etc. complete as per direction of Engineer-in- charge. | - | cum | - | - | - |
| 5 | Construction of granular sub-base by providing close graded Materia conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25 | - | cum | - | - | - |
| 6 | Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-in-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately).Note:- Cement content considered in M-30 is @ 340 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately.
Cement concrete prepared with batch mixing machine..[all complete as per specification.Design and drawing to be approved by the Architect in charge by the means of shop drawing and sample preparation by the contractor.] | - | cum | - | - | - |
| 7 | Providing and fixing in position pre-moulded joint filler in expansion joints. | - | per cm depth per cm width per m length | - | - | - |
| 8 | Providing and laying in position bitumen hot sealing compound for expansion joints etc. Using grade ‘A’ sealing compound. | - | per cm depth per cm width per m length | - | - | - |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more | - | qtl | - | - | - |
| 10 | INTERLOCKING
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | - | Cum. | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.31 MB
Bid_Samaor.pdf
Tender Documents • 4.80 MB
BOQ_2179106.xls
BOQ • 1.01 MB
Download all tender documents and submit your bid