Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.5 LAccepted-AOC DOOR NO IV 400 NEAR RAMANTHALI GHSS RAMANTHALI PO KANNUR 670308 | KANNUR | KERALA | 670308 | L1 | Accepted-AOC L1 | |
| 2 | L2₹32.9 L+₹39,600 (1.22%)Rejected-AOC C 101 ADG P CHENNAI | L2 | Rejected-AOC Other than L1 | |
| 3 | L3₹33.3 L+₹79,200 (2.44%)Rejected-AOC 204B SENTHAMANGALAM GOTHANDARAMPURAM VILLAGE PERUMANADU POST VAYALOGAM VIA PUDUKKOTTAI DIST TN | PUDUKKOTTAI | TAMIL NADU | 622104 | L3 | Rejected-AOC Other than L1 | |
| 4 | L4₹34.3 L+₹1.8 L (5.69%)Rejected-AOC | L4 | Rejected-AOC Other than L1 | |
| 5 | L5₹34.6 L+₹2.2 L (6.67%)Rejected-AOC C 234 ADG P CHENNAI | L5 | Rejected-AOC Other than L1 |
Tender Value
₹37 L
EMD Value
₹74,000
Closing Date
13 May 2020, 6:00 pmClosed
GE DSSC
GE DSSC WELLINGTON BARRACKS POST, WELLINGTON, THE NILGIRIS, PIN 643 231
MANNING AND OPERATION OF GOLF PUMP HOUSE, GORKHA HILL PUMP HOUSE, ANNEX OFFICERS MESS PUMP HOUSE AND CONTROLLING VALVES AT DIFFERENT POCKETS AT DSSC WELLINGTON UNDER GE DSSC WELLINGTON
2020_MES_340665_1
8111/E8
Open Tender
Civil Works
Item Rate
330 days
Wellington
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE DSSC WELLINGTON
₹74,000
Yes
10 Sept 2020
24 Apr 2020
15 May 2020
24 Apr 2020
13 May 2020
28 Apr 2020
Amount
Manning and operation of water supply installations consisting of pump sets, all type of connected controlling valves located at Golf Pump house by employing one FGM (Skilled) and trouble free operations including carry out minor repairs such as valves, leakage arresting, checking of water level in the UG sumps located within 1.5 Km from the installation and day to day cleaning & maintenance of entire pump houses and surroundings including operating the gensets with LT panel whenever power shielding / shut down by TNEB, round the clock complete all as specified and directed by Engr-in-Charge. Note: Three shifts per day (a) First Shift of 08 hours : 0600 hrs to 1400 hrs - 1 FGM (b) Second Shift of 08 hours : 1400 hrs to 2200 hrs - 1 FGM (c) Third Shift of 08 hours : 2200 hrs to 0600 hrs - 1 FGM
All as per item No1 here-in-before but at Gorkha Hill Pump House and Annex Officers Mess Pump House with following trades man and shift complete all as specified and directed by Engr-in-Charge. Note: Three shifts per day (a) First Shift of 08 hours : 0600 hrs to 1400 hrs - 1 FGM (b) Second Shift of 08 hours : 1400 hrs to 2200 hrs - 1 FGM (c) Third Shift of 08 hours : 2200 hrs to 0600 hrs - 1 FGM
All as per item No 1 here-in-before but at College Officers Mess Pump House with following trades man and shift complete all as specified and directed by Engr-in-Charge. Note: Two shifts per day (a) First Shift of 08 hours : 0600 hrs to 1400 hrs - 1 FGM (b) Second Shift of 08 hours : 1400 hrs to 2200 hrs - 1 FGM
Manning and operation of controlling of different type and size of valves located in various places at Gorkha Hill area, Circle area, DSC PL, 24 Civilian qtrs at Gorkha Camp, stable etc by employing valve man (semi-skilled) for smooth and trouble free operation for supplying of water by operating valves area wise including to attend the minor water supply break downs /repairs works and cleaning of all valve chamber in this area complete all as specified and directed by Engr-in-Charge. Note: Two shifts per day (a) First Shift of 08 hours : 0600 hrs to 1400 hrs - 1 Valve Man (b) Second Shift of 08 hours : 1400 hrs to 2200 hrs - 1 Valve Man
All as per item No.4 here-in-before but Annex officers area, 70 Major New accns area at MAP area and supplying water from MAP tank etc complete with following trades man and shift complete all as specified and directed by Engr-in-Charge. Note: Two shifts per day (a) First Shift of 08 hours : 0600 hrs to 1400 hrs - 1 Valve Man (b) Second Shift of 08 hours : 1400 hrs to 2200 hrs - 1 Valve Man
All as per item No. 4 here-in-before but at College Office area /OR's & JCO's Md accn /OR's & JCO's Mess /Jagaranda Qtrs / Memorial view Qtrs area /Flag staff House area etc complete with following trades man and shift all as specified and directed by Engr-in-Charge. Note: Two shifts per day (a) First Shift of 08 hours : 0600 hrs to 1400 hrs - 1 Valve Man (b) Second Shift of 08 hours : 1400 hrs to 2200 hrs - 1 Valve Man
All as per item No. 4 here-in-before but Wellington Hall /Castle /New Neelamber /Niligiri /IB /Jubilee garden /DSSC Offrs Mess /Golf view / Valley view area etc complete with following trades man and shift all as specified and directed by Engr-in-Charge. Note: Two shifts per day (a) First Shift of 08 hours : 0600 hrs to 1400 hrs - 1 Valve Man (b) Second Shift of 08 hours : 1400 hrs to 2200 hrs - 1 Valve Man
Note for item Nos 1 to 7: (i) The rate quoted shall not be less than minimum wages as notified by Government of India / State Government / Local body whichever is higher including all statutory provisions such as EPF, ESIC, LWC, GST etc. (ii) Necessary documentary proof shall be produced regarding the payment of employees through Bank accounts in every RAR and FB stage. (iii) The wages of staff employed shall be disbursed through Aadhaar linked Bank Accounts through NEFT/ RTGS only. (iv) The person employed should posses Aadhaar Card and Police Verification certificate duly verified the antecedents not less than 1 year. (v) The staff employed shall be in proper uniform indicating the name of individual as well as firm name. (vi) The contractor shall produce EPF filing report of every month for the persons employed by him. The RAR's shall be processed only after production of EPF filing upto the previous month of paid/payable RAR. (vii) Submission of proof of crediting the wages in the bank account / payment made to the employees by the contractor shall be a pre-requisite to enable the contract executing authority to release subsequent payments to contractors. The registered contractors shall also provide the details of individual EPF and ESI account number to claim the payment and the contract executing authority will ensure verification of the same from time to time. (viii) Proper daily log sheet as per sample for the pumpsets and DG Set shall be maintained ( Stationary required for maintaining log sheets to be supplied by the contractor & cost of the same is deemed to be included in the unit quoted rates). (ix) Installation shall always be kept neat and clean. (x) Cost of rectification of any type of leakages with in the installation premises such as leaking joints (from flanged or S/S pipes) & of C/F pump sets are deemed to be included in the unit quoted rates.
ACE PROMOTERS
M Govindarajan
SHREE SAI LABOUR CONTRACT CO-OPERATIVE SOCIETY LTD
GMS Builders
sree devi construction
S.RAMACHANDRAN
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .