Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹14.1 L
EMD Value
₹14,100
Closing Date
30 Oct 2026, 1:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Unit Head, Upper Kolab HEP, Bariniput
Bariniput, Jeypore, Koraput, Odisha
Construction of Tata Blue Scope Roof Top Shed Over the Training Hostel Building at Power House Colony
2026_OHPCL_143663_1
e-Tender-05/2026-27_UKHEP
Open Tender
Civil Works - Others
Percentage
120 days
Upper Kolab HEP, Bariniput
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹14,100
Yes
16 Oct 2026
16 Oct 2026
31 Oct 2026
16 Oct 2026
30 Oct 2026
16 Oct 2026
16 Oct 2026 - 30 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Close deep chipping and cleaning to R.C.C. surface for receiving cement plaster or cement concrete including all labour, T&P, sundries and labour cess etc complete in ground floor & 1st floor. | 22 | Per Sqm | 27.3 | ₹600.6 |
| 2 | Providing and finishing wall surface with Birla white wall seal water proofing putty of Asian/ Berger/ Shalimar make and finished smooth and even surface to receive painting including cost of paint, scaffolding charges, labour , T & P, sundries, labour cess etc complete in ground floor & 1st floor. | 120 | Per Sqm | 111.61 | ₹13,393.2 |
| 3 | Removing old tarfelt from roof slab and chajja cleaning the surface, lowering and removing the debris away from work site by any mechanical means within 5 Km including all labour, T&P, Sundries, loading, unloading, carriage and labour cess etc complete from ground floor. | 22 | Per Sqm | 103 | ₹2,266 |
| 4 | Supplying all required materials, fabricating trusses, rafters, vertical posts, bracings etc and welding of 80mm x 80mm x 3mm, 50mm x 50mm x 2.5mm and 40mm x 40mm x2mm thick Gr 304 Stainless Steel Square Hollow Sections and 4mm thick S.S plate etc at site including cost of all materials, conveyance, all labour, T & P, sundries and labour cess etc complete. Unit = Per Qntl. Rate as per local market Jeypore. | 95.08 | Per Qntl. | 7,540.83 | ₹7,16,982.12 |
| 5 | Hoisting joists & trusses & placing in position including all labour, T & P, sundries, lead, lift, delift and labour cess etc complete in ground floor. AR - 2006, P - 224, I - 1 Unit =Per Qntl. | 95.08 | Per Qntl. | 1,373.7 | ₹1,30,611.4 |
| 6 | Cutting hole in R.C.C floors and roofs upto 19cm thick for passing G.I / P.V.C pipes and fittings and repairing the holes safter insertion of pipe etc with cement concrete (1:2:4) including finishing complete so as to make it leak proof including cost of all materials, T & P, sundries, lead, lift, delift, scaffolding, all other materials if required and labour cess etc complete. PHAR - 2013, P - 109, I - 3.1.11 Unit = Per hole. | 352 | Per Holes | 217.2 | ₹76,454.4 |
| 7 | Rigid and smooth cetentering and shuttering for RCC works including false work and dismantling them after casting including cost of all materials complete including all labour, T&P, sundries, lead, lift, delift and labour cess etc complete as per direction of EIC. | 63.36 | Per Sqm | 273.54 | ₹17,331.49 |
| 8 | Cement concrete (1:2:4) for R.C.C works with 12mm size HGCB chips including cost, conveyance , royalty, all labour, T&P, sundries, lead, lift, delift, labour cess and curing etc complete as per direction of EIC. | 8.75 | Per Cum | 7,707.39 | ₹67,439.66 |
| 9 | 16mm thick cement plaster in cement mortar (1:6) over brick or stone masonary including cost, conveyance, royalty, lead, lift, delift, all labour, T&P, sundries, labour cess and curing etc complete as per direction of EIC. | 151.28 | Per Sqm | 290.27 | ₹43,912.05 |
| 10 | Priming one coat to inside & outside walls and ceilings with wall cement primer (ISI) including cost of primer water bound of Asian / Berger / Shalimar make including all labour,T&P, sundries, brush, scaffolding, putty and labour cess etc complete as per direction of EIC. | 151.28 | Per Sqm | 83.77 | ₹12,672.73 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
SPEC5.pdf
Tender Documents • 1.07 MB
BOQ_614294.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .