Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76.3 LAccepted-AOC 93 BAPUJI NAGAR ITC ROAD SAHARANPUR 247001 UP | SAHARANPUR | UTTAR PRADESH | 247001 | L1 | Accepted-AOC Being lowest bidder | |
| 2 | L2₹82.5 L+₹6.2 L (8.10%)Rejected-Finance OPP AIR FORCE STATION VPO SORANA DISTT SAHARANPUR UP PIN 247 232 | SAHARANPUR | UTTAR PRADESH | 247232 | L2 | Rejected-Finance Not Lowest Bidder |
| Sl No | Description | Qty | Unit | G.H. INFRASTRUCTURE PRIVATE LIMITED L1 | SUBHASH CHAND CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Schedule 'A' Section-I (Building Works) is not prepriced by MES and prepriced rates indicates 0.00 under column 6 signified this fact only | |||||
| 1.01 | Construction of MI Room, single storey with RCC framed structure with permanent specifications complete all as specified & shown on drawings. | 1 | Each | 45,21,425 ₹45,21,425 Lowest | 52,00,000 ₹52,00,000 |
| 1.02 | Construction of Garage for ambulance, single storey with RCC framed structure and with permanent specifications complete all as specified & shown on drawings. | 1 | Each | 7,39,998 ₹7,39,998 Lowest | 8,70,000 ₹8,70,000 |
| 1.03 | Construction of scooter cum car parking shed, single storey with RCC framed structure and with permanent specifications complete all as specified & shown on drawings. | 1 | Each | 8,59,520 ₹8,59,520 | 6,75,000 ₹6,75,000 Lowest |
| 2.00Schedule 'A' Section-II to Section-XI (BOQ Item No 2.01 to 2.11 here-in-after). These schedules are Prepriced by MES and Prepriced rates indicated under column-6. Bidders to quote their rates under column-7 only . | |||||
| 2.01 | Schedule 'A' Section-II (Excavation & Earth Works) | 1 | Lump Sum | 45,000 ₹45,000 | 40,000 ₹40,000 Lowest |
| 2.02 | Schedule 'A' Section-III (Internal Water Supply Works) | 1 | Lump Sum | 2,47,900 ₹2,47,900 | 23,000 ₹23,000 Lowest |
| 2.03 | Schedule 'A' Section-IV (Internal Electric Supply Works) | 1 | Lump Sum | 3,00,000 ₹3,00,000 Lowest | 3,90,000 ₹3,90,000 |
| 2.04 | Schedule 'A' Section-V (Road, Path & Hardstanding Works) | 1 | Lump Sum | 1,25,000 ₹1,25,000 Lowest | 1,40,000 ₹1,40,000 |
| 2.05 | Schedule 'A' Section-VI (Area Drainage Works) | 1 | Lump Sum | 1,23,000 ₹1,23,000 Lowest | 1,44,000 ₹1,44,000 |
Tender Value
₹88.7 L
EMD Value
₹1.6 L
Closing Date
21 Feb 2026, 6:00 pmClosed
CWE (AF) Ambala
HQ CWE (AF) Ambala Cantt
CWE/AF AMB/SAR-T58/2025-26 CONSTRUCTION OF MI ROOM AT SG SARSAWA UNDER GE AF SARSAWA
2026_MES_748853_1
CWE/AF AMB/SAR-T-58/2025-26
Open Tender
Civil Works
Lump-sum
180 days
Sarsawa
For MES enlisted contractor Class C Category a i and for un-enlisted contractor
refer NIT
11 documents required · 11 mandatory
₹1,000
GE (AF) Sarsawa
₹1.6 L
Yes
20 May 2026
16 Jan 2026
23 Feb 2026
16 Jan 2026
21 Feb 2026
15 Feb 2026
16 Jan 2026 - 10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule 'A' Section-I (Building Works) is not prepriced by MES and prepriced rates indicates 0.00 under column 6 signified this fact only | |||||
| 1.01 | Construction of MI Room, single storey with RCC framed structure with permanent specifications complete all as specified & shown on drawings. | 1 | Each | - | - |
| 1.02 | Construction of Garage for ambulance, single storey with RCC framed structure and with permanent specifications complete all as specified & shown on drawings. | 1 | Each | - | - |
| 1.03 | Construction of scooter cum car parking shed, single storey with RCC framed structure and with permanent specifications complete all as specified & shown on drawings. | 1 | Each | - | - |
| 2Schedule 'A' Section-II to Section-XI (BOQ Item No 2.01 to 2.11 here-in-after). These schedules are Prepriced by MES and Prepriced rates indicated under column-6. Bidders to quote their rates under column-7 only . | |||||
| 2.01 | Schedule 'A' Section-II (Excavation & Earth Works) | 1 | Lump Sum | 79,093.09 | ₹79,093.09 |
| 2.02 | Schedule 'A' Section-III (Internal Water Supply Works) | 1 | Lump Sum | 24,886.49 | ₹24,886.49 |
| 2.03 | Schedule 'A' Section-IV (Internal Electric Supply Works) | 1 | Lump Sum | 4,01,044.96 | ₹4,01,044.96 |
| 2.04 | Schedule 'A' Section-V (Road, Path & Hardstanding Works) | 1 | Lump Sum | 1,54,103.63 | ₹1,54,103.63 |
| 2.05 | Schedule 'A' Section-VI (Area Drainage Works) | 1 | Lump Sum | 1,53,331.13 | ₹1,53,331.13 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.26 MB
Tender58T.pdf
Tender Documents • 1.40 MB
BOQ_838643.xls
BOQ • 1.69 MB
MIROOMDRG.pdf
Additional Documents • 8.51 MB
TDDRGMIROOM.pdf
Additional Documents • 10.45 MB
AMDT04.pdf
PDF • 0.21 MB
58Date.pdf
PDF • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .