| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.2 CrAccepted-Finance GWJWNPURI WARD NO 4 CHIRANG P O CHAPAGURI PS DALIGAON DISTRICT CHIRANG PIN 783373 | KOKRAJHAR | ASSAM | 783373 | ₹31.2 Cr | L1 | Accepted-Finance Qualified |
| 2 | L1₹31.2 CrRejected-Finance P O P S UDALGURI WARD NO 2 DIST UDALGURI BTC ASSAM | UDALGURI | ASSAM | 784113 | ₹31.2 Cr | L1 | Rejected-Finance Refer Financial Minutes |
| 3 | L2₹34.6 CrRejected-Finance | ₹34.6 Cr | L2 | Rejected-Finance Refer Financial Minutes |
| 4 | L3₹34.6 CrRejected-Finance WARD NO 1 P O P S BIJNI DIST CHIRANG PIN 783390 | CHIRANG | ASSAM | 783390 | ₹34.6 Cr | L3 | Rejected-Finance Refer Financial Minutes |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹34.6 Cr
EMD Value
₹69.2 L
Closing Date
22 Jul 2021, 2:00 pmClosed
Chief Engineer, PWD, Roads, Assam, Chandmari, Ghy
O/o the Chief Engineer, PWD, Roads, Assam, chandmari, Guwahati-781003
SOPD_G_20_21_249_B Improvement and widening of Udalguri to Kalaigaon Road via Chintagaon in Udalguri (R and B) Division under SOPD-(G) for the year 2020-21, ( Ch. 14900.00 to Ch. 26800.00m) Group N0.(ii)
2021_PWD_22083_2
CE/DEV/TB/686/2020-21/10
Open Tender
Civil Works
365 days
Kalaigaon/Udalguri
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
Empowered Officer, ASRB
₹69.2 L
Yes
O/o the Chief Engineer, PWD, Roads, Assam,
29 Mar 2022
2 Jul 2021
22 Jul 2021
2 Jul 2021
22 Jul 2021
8 Jul 2021
2 Jul 2021 - 22 Jul 2021
7 Jul 2021
Amount
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm dia, removal of stumps of trees cut earlier and disposal of serviceable materials to be used or auctioned, upto 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specifications Clause 201.
Scarifying existing bituminous surface to a depth of 50 mm by mechanical means (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.
Compacting original ground supporting subgrade (Loosening of the ground upto a level of500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.
Excavation for roadway in soil using manual means using cut earth to embankment in the immediate vicinity.
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (i) Private Land
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2) (a), ( Including cost of testing of materials at site and laboratory as directed by the deptt.) (a) From private land
Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density,complete as per cl. 401( with an initial lead of 5 Km.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) (ii) for grading II Material
Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density ( with an initial lead of 5.0 km. ) A)By Manual Means.'Grading- II c)Using Screening Type-B (11.2mm Agg.)
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sb-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density (including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant)
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(i) With bitumen emulsion-CSS-1h
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(I)With Bitumen emulsion CSS-1h '(c) Granular surfaces treated with primer
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix and filler transporting the hot miox to work site,laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no. 507. complete in all respect. (including carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.)
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no.509. complete in all respect. (including carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(a) With hydrated lime/cement as filler ( refer table 500-9 of MoSRT&H specification) (I)'with 60/70 or VG-30 grade bitumen for Grading-I ( 19 mm nominal size )
Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 metres
Removing all type of hume pipes and stacking within a lead of 1000 metres including earthwork and dismantling of masonry works., above 600 mm to 900 mm dia
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and
Providing reflective pavement marker with Micro prismatic lens in both direction having thermoplastic body adhering to the specification and guidelines of MoSRT&H’s fixed to the road surfac using the adhesives and the procedures recommended by the manufacturers with three months replacement warranty
Planting of Trees and their Maintenance for one Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for one year.
RCC guard post: Supplying,fitting and fixing RCC guard post size 15 cm dia,150cm long,75cm above the ground and 75cm below the ground, with 4- 12mm Tor steel main steel and 6mm MS stirrups at 30cm c/c tied in position with annealed black wire, cement concrete proportin 1:2:4 with broken stone aggregate up to 20mm size including centering,mouldingthe top.curing,paintedblack and white alternately in 23cm strips upto 0.75m from the top having reflective band 2 nos. of desired shade etc. as per design and direction complete.
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and
Removal of Telephone / Electric Poles and Lines (Removal of telephone / Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of 1000 metres and stacking serviceable materials and unserviceable materials
RCC Slab Culvert 2m 'Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, place in foundation and compacted by vibration including curing for 14 days.
Plain reinforced cement concrete in open foundation complete as per drawing and technical specification. RCC M 15. Case ll with Batching Plant, Transit mixer and concrete pump.
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork,RCC Grade M-20
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specification
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification
Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications
Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequat space between vertical posts for expansion, complete as per approved
Drainage Spouts complete as per drawing and Technical specification
Construction of RCC Br. No 26/2 Labour for dismantling all members of the timber bridge (excluding piles) with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed (all members will be under custody of the contractor till taken over by the department)
Labour for taking out old piles of timber bridge with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed.
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
'Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1000 mm)
Pile load test on single vertical pile in accordance with IS:2911(Part-IV).
Levelling course for Pile cap : Providing and laying of PCC M15 levelling course 100mm thick below the pile cap
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification including providing plasticiser ( Masterplast PL-1/SPL-2 or equivalent ), air entraining and water reducing plasticiser ( Masterplast PAE or equivalent) and accelerating plasticiser ( Masterplast ACPL or equivalent) conforming to IS-9103-1999.,RCC Grade-M25
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications , tmt-is-1786(fe-500D),ISI Approved
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork , RCC Grade-M-25
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. N. Without Plasticiser IN Super struvcture., RCC T BEAM & SLAB,RCC M-25 using concrete mixer.
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications (a) TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequat space between vertical posts for expansion, complete as per approved drawings and technical specifications.
Buried joint(Providing and laying of buried joint expansion gap 20 mm covered with 12 mm thick, 200 mm wide galvanised wieldable structural steel plate as per IS:2062, PLACED SYMMETRICAL TO CENTRE LINE OF THE JOINT RESTING FREELY OVER THE TOP SURFACE OF THE DECK CONCRETE WELDING OF 8 MM DIA , 100 MM galvanized nails spaced 300 mm C/C along the centre line of the plate as specified cl.2604.
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete .
Drainage Spouts complete as per drawing and Technical specification
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications A) Stone/Boulder
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighting not less than 40Kg each.)
Construction of temporary Bamboo bridge of 3.70m clear road way with Bholuka or Barua Bamboo post 5nos. in each rows driven at least180cm. below ground level and rows not more than 150cm apart from center to center Bholuka or Barua Bamboo dham longitudinal groth both closely placed and tied with half bamboo 90cm to 120cm apart in both layers and ttwo layers of jati bamboo chattais ( top layer should be digonally woven), 70 mm to 100 mm thick brushwood in between chattias should be tied with half jati bamboo on both ends, bamboo railing with bholuka or barua bamboo post placed at150cm apart jati or betua bamboo hand rails of two lines both side of every alternate rows.All tying must be done with cane or coir string and only mature bamboo should be used in w
Construction of subway at U/S of Prop. RCC Br. No.26/2 'Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (i) Private Land
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC,and compacting with vibratory roller to achieve the desired density,complete as per cl. 401 (ii) for grading- II Material
Labour for laying Reinforced cement concrete pipe NP4/NP3/prestressed concrete pipe for culverts on first class bedding of granular material /cc M-15 in single row including fixing collar with cement mortar 1:2,and cost of granular bedding but excluding excavation, protection works, backfilling, concrete and masonry work in head wall and parapet,cost of pipe and cost of CC bedding. (A) 1000mm dia
Sri Minon Mochahari
kamalchgoyary
ranjanbasumatary
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid