Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹70.2 CrAccepted-AOC BUILDING NO 8 RAJEBAHADUR MANSION A D MARG FORT MUMBAI | MUMBAI | MUMBAI CITY | MAHARASHTRA | ₹70.2 Cr | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | Savani Heritage Conservation Pvt Ltd L1 |
|---|---|---|---|---|
| 1.00Civil Work Portion- Commercial Complex & Corridor and Ghat Section -160 Rmt | ||||
| 1.00 | Cutting down trees including trunks and branches with girths above 30 cm. to 60 cm. and stacking the material neatly with all lifts and lead of 1000 m as directed and earth filling in the depression/pit if any. | 40 | Number | 600 ₹24,000 Lowest |
| 1.00 | Cutting down trees including trunks and branches with girths above 60cm to 90cm and stacking the materials neatly with all lifts and lead of 1000m. as directed and earth filling in the depression/pit if any. | 5 | Number | 1,200 ₹6,000 Lowest |
| 1.00 | Cutting down trees including trunks and branches with girths above 90 cm. to 180 cm. and stacking the material neatly with all lifts and lead of 1000 m as directed and earth filling in the depression/pit if any. | 5 | Number | 2,200 ₹11,000 Lowest |
| 1.00 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.5 metre) by Mechanical Means.. | 6,621.38 | Cubic Metre | 350 ₹23,17,483 Lowest |
| 1.00 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum,
including removing the excavated material upto a distance of 50 metres beyond the buildingareaandstacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means | 2,047.92 | Cubic Metre | 380 ₹7,78,209.6 Lowest |
| 1.01 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.50 m) by Mechanical Means.. | 9,361.28 | Cubic Metre | 350 ₹32,76,448 Lowest |
| 1.01 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift from 1.5 to 3.0 m.) by Mechanical Means. | 2,182.32 | Cubic Metre | 400 ₹8,72,928 Lowest |
| 1.01 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting, dewatering etc. complete (lift upto 1.5 m) by Mechanical Means. | 7,551.53 | Cubic Metre | 540 ₹40,77,826.2 Lowest |
| 1.01 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 meters beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/ murum, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift from 1.5 metre to 3.0 metre) by Mechanical Means. | 3,254.16 | Cubic Metre | 600 ₹19,52,496 Lowest |
Tender Value
₹67.0 Cr
EMD Value
₹67.0 L
Closing Date
12 Jan 2026, 5:00 pmClosed
CE MSIDC
13th floor Bakhtawar building Nariman point Mumbai
Construction of Darshan path. Toilet block and area development works under Pilgrimage site development plan at Shri Trimbakeshwar Dist Nashik 1st call
2026_MSIDC_1266041_1
14 Darshan Path
Open Tender
Civil Works
Item Rate
365 days
Nashik
Please refer Tender documents.
7 documents required · 7 mandatory
₹11,800
Yes
₹67.0 L
Yes
1 Jul 2026
5 Jan 2026
14 Jan 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Work Portion- Commercial Complex & Corridor and Ghat Section -160 Rmt | |||||
| 1.001 | Cutting down trees including trunks and branches with girths above 30 cm. to 60 cm. and stacking the material neatly with all lifts and lead of 1000 m as directed and earth filling in the depression/pit if any. | - | Number | 531.03 | - |
| - | Cutting down trees including trunks and branches with girths above 60cm to 90cm and stacking the materials neatly with all lifts and lead of 1000m. as directed and earth filling in the depression/pit if any. | - | Number | 880.2 | - |
| - | Cutting down trees including trunks and branches with girths above 90 cm. to 180 cm. and stacking the material neatly with all lifts and lead of 1000 m as directed and earth filling in the depression/pit if any. | - | Number | 1,814.45 | - |
| - | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.5 metre) by Mechanical Means.. | - | Cubic Metre | 215.1 | - |
| - | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum,
including removing the excavated material upto a distance of 50 metres beyond the buildingareaandstacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means | - | Cubic Metre | 326 | - |
| - | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.50 m) by Mechanical Means.. | - | Cubic Metre | 235.9 | - |
| - | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift from 1.5 to 3.0 m.) by Mechanical Means. | - | Cubic Metre | 295.15 | - |
| - | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting, dewatering etc. complete (lift upto 1.5 m) by Mechanical Means. | 1 | Cubic Metre | 445.8 | ₹445.35 |
| - | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 meters beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/ murum, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift from 1.5 metre to 3.0 metre) by Mechanical Means. | 1 | Cubic Metre | 544.55 | ₹544.01 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_2181014.xls
BOQ • 0.74 MB
DTP2.pdf
Tender Documents • 7.29 MB
Drawings.pdf
Tender Documents • 5.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .