Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.5 LAccepted-AOC NO 5 37 VITTAMPALAYAM EMAPALLI TIRUCHENGODE TALUK NAMAKKAL DISTRICT 637211 | EMAPALLI | NAMAKKAL | TAMIL NADU | 637211 | ₹18.5 L Quoted ₹13.0 L | 1 | Accepted-AOC Accept |
| 2 | 2₹14.4 LRejected-Finance | ₹14.4 L | 2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | Vetrivelavan Construction L2 | RKK CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. | 32.5 | M3 | 224 ₹7,280 Lowest | 234 ₹7,605 |
| 2.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, four part sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO : 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 21.5 | M3 | 5,900 ₹1,26,850 | 4,887 ₹1,05,070.5 Lowest |
| 3.00 | Refilling the basement with excavated earth other than sand complying the Standard specification | 18 | M3 | 40 ₹720 Lowest | 41 ₹738 |
| 4.00 | Collection supply and filling of Stone Dust of approved quarry including cost and Conveyance of all materials to site and all labor charges for filling etc., Complete. | 7 | M3 | 180 ₹1,260 Lowest | 256 ₹1,792 |
| 5.00 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand) using new best II Class Bricks of size 9 ” x 4 3/8 “x 2 3/4 ” from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.Basement | 7 | M3 | 6,500 ₹45,500 Lowest | 7,061 ₹49,427 |
| 5.10 | Super structure : wall alround | 27 | M3 | 6,500 ₹1,75,500 Lowest | 7,143 ₹1,92,861 |
| 6.00 | Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 17.5 | M3 | 5,100 ₹89,250 Lowest | 7,859 ₹1,37,532.5 |
| 7.00 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 1.8 | MT | 7,500 ₹13,500 Lowest | 85,389 ₹1,53,700.2 |
| 8.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 37.5 | M2 | 500 ₹18,750 Lowest | 1,166 ₹43,725 |
| 8.10 | Earth beam | 24.5 | M2 | 2,000 ₹49,000 | 429 ₹10,510.5 Lowest |
Tender Value
Refer Docs
EMD Value
₹18,500
Closing Date
17 Jun 2026, 3:00 pmClosed
EXECUTIVE OFFICER
VENNANDUR TOWN PANCHAYAT OFFICE
Construction of Anganwadi Building at Ward no1Sarkar Thoppu in Vennandur Town panchayat
2026_DTP_679248_1
89/2026 SADP
Open Tender
Civil Works
Works
180 days
VENNANDUR TOWN PANCHAYAT
AS PER TENDER NOTICE
2 documents required · 2 mandatory
₹0
₹18,500
Yes
22 Jun 2026
3 Jun 2026
18 Jun 2026
3 Jun 2026
17 Jun 2026
3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per SS 20 A. TNDSS NO: 23 & 24 VI (S2) VI,VII 9,10 with standard specifications. | 32.5 | M3 | - | - |
| 2 | Plain Cement Concrete 1:4:8 Mix (one part cement, four part sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO : 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 21.5 | M3 | - | - |
| 3 | Refilling the basement with excavated earth other than sand complying the Standard specification | 18 | M3 | - | - |
| 4 | Collection supply and filling of Stone Dust of approved quarry including cost and Conveyance of all materials to site and all labor charges for filling etc., Complete. | 7 | M3 | - | - |
| 5 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand) using new best II Class Bricks of size 9 ” x 4 3/8 “x 2 3/4 ” from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.Basement | 7 | M3 | - | - |
| 5.1 | Super structure : wall alround | 27 | M3 | - | - |
| 6 | Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 17.5 | M3 | - | - |
| 7 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 1.8 | MT | - | - |
| 8 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 37.5 | M2 | - | - |
| 8.1 | Earth beam | 24.5 | M2 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BID.pdf
Tender Documents • 0.27 MB
BOQ_816104.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].