| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-AOC | ₹11.5 L | L1 | Accepted-AOC ok |
| 2 | L2₹11.5 L+₹5,312 (0.46%)Rejected-Finance | ₹11.5 L+₹5,312 (0.46%) | L2 | Rejected-Finance L2 |
Tender Value
₹11.6 L
EMD Value
₹23,200
Closing Date
5 Aug 2026, 12:00 pmClosed
Executive Engineer
EE red saharanpur vikas bhawan delhi road saharanpur
Gram Kakrala me nakur-Saharanpur marg se Pratap Upadhyaya ke ghar tak ak sahayak gali sahit C C road v nali nirman karya
2026_REDUP_1173267_13
583/RED/cashier/26-27 dt 04-07-2026
Open Tender
Civil Works
Percentage
90 days
EE red saharanpur
Gram Kakrala me nakur-Saharanpur marg se Pratap Upadhyaya ke ghar tak ak sahayak gali sahit C C road v nali nirman karya
3 documents required · 3 mandatory
₹854
₹23,200
EE red saharanpur vikas bhawan delhi road saharanp
7 Sept 2026
30 Jul 2026
5 Aug 2026
30 Jul 2026
5 Aug 2026
30 Jul 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 3000 m as per Technical Specification Clause 202. as per Mord 2.5 | 118.54 | Cum | 597.55 | ₹70,833.58 |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 3000 m as per Technical Specification Clause 301.5 As per Mord 3.4 | 237.08 | Cum | 192.85 | ₹45,720.88 |
| 3 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P C C 1:3:6 M-10 As per Mord 11.4 | 8.2 | Cum | 5,718.05 | ₹46,888.01 |
| 4 | Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204
As Per Mord 12.1 | 13.16 | Cum | 5,639.2 | ₹74,211.87 |
| 5 | Plastering with cement mortar (1:4), 12 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
As Per Mord 12.3 | 80.9 | Sqm | 173.85 | ₹14,064.47 |
| 6 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
P C C 1:2:4 M- 20 As Per Mord 11.4 | 4.5 | Cum | 6,054.35 | ₹27,244.58 |
| 7 | Construction of Granular Sub Base by providing Well graded material, spreading in uniform layers with Motor grader/Tractor mounted appropriate equipment on prepared surface, mixing by mix in place method with Rotavator at OMC and compacting with Smooth wheel roller to achieve the desired density complete as per Technical Specification Clouse 401 As Per Mord 4.1 | 68.88 | Cum | 2,071 | ₹1,42,650.48 |
| 8 | Cement Concrete with 2cm gauge approved stone grit, course sand & cement in proportion of 1:1.5:3 in CC Pavement with 43 grade cement or any other type as per Clause 1501.2.2, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle,and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints,s, admixtures as approved, curing of concrete slabs for 14-days,, As Per Mord 6.4 | 103.31 | Cum | 6,912.2 | ₹7,14,099.38 |
| 9 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 R.C.C. grade M 25 As per Mord Sr. N0 -: 12.5 | 1.17 | Cum | 6,572.1 | ₹7,689.36 |
| 10 | Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 As per Mord Sr. N0 -: 12.7 | 1.13 | Qtl | 6,476.15 | ₹7,318.05 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_2203541.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .