Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
20 May 2022, 3:00 pmClosed
Rafeeque N M
GAS, Bharat Petroleum Corporation Limited
Please attend pre-bid meeting for this tender on 09.05.2022 @ 11:00 Hrs through MS Teams in the following link https://teams.microsoft.com/l/meetup-join/19%3ameeting_NDI0ZDBmODctZDc5OC00MWM2LWJmZjItMGFhZWIxNmE4ZWY3%40thread.v2/0?context=%7b%22Tid%22%3a%22222f3a7c-d45e-4818-9aa4-33d44420ec32%22%2c%22Oid%22%3a%22ba1696e5-6511-4f2b-922a-f40134e8eba9%22%7d Join with a video conferencing device [email protected] Video Conference ID: 132 492 861 4 Alternate VTC instructions Learn More | Meeting options If any issue, please write a mail to [email protected]
2198
1000019211
Open Tender
Works
GAS
₹10 L
16 Dec 2022
4 May 2022
20 May 2022
5 May 2022
20 May 2022
5 May 2022
9 May 2022 - 9 May 2022
GAS BUSINESS UNIT
BHARAT PETROLEUM CORPORATION LIMITED
12th FLOOR, MAKER TOWER – F, CUFFE PARADE
NOTICE INVITING TENDER FOR
LAYING OF MDPE NETWORK AND ASSOCIATED WORKS
FOR CGD PROJECT AT ROHTAK GA IN THE STATE OF
TENDER DOCUMENT
(COMMERCIAL VOLUME)
E - Tender ID :
Pre-Bid Meeting on 09.05.2022 @ 11:00 Hrs
Tender Due on: 20.05.2022 @ 15:00 Hrs
TABLE OF CONTENTS
1. SECTION-I : INVITATION FOR BIDS (IFB)
2. SECTION-II : INSTRUCTIONS TO BIDDERS (ITB)
3. SECTION-III : GENERAL CONDITIONS OF CONTRACT
4. SECTION-IV : SPECIAL CONDITIONS OF CONTRACT
5. SECTION-V : FORMS AND FORMATS
6. SECTION – VI : SCHEDULE OF WORKS
INVITATION FOR BIDS (IFB)
TABLE OF CONTENTS:-
1.0 INTRODUCTION
2.0 BRIEF DESCRIPTION OF PROJECT
3.0 BRIEF SCOPE OF WORK
4.0 CONTRACT PERIOD
5.0 SUBMISSION OF BID & BID VALIDITY
6.0 BIDDING PROCEDURE7.0 DETAILS OF BID DOCUMENTS
8.0 BID EVALUATION CRITERIA (BEC)
9.0 EMD/ BID SECURITY
10.0 SUBMISSION OF ORIGINAL DOCUMENTS
11.0 PRE-BID MEETING
12.0 ZERO DEVIATION BIDS
INVITATION FOR BIDS (IFB) FOR LAYING OF MDPE NETWORK & ASSOCIATED WORKS
FOR CGD PROJECT AT. ROHTAK GA IN THE STATE OF HARYANA
OPEN DOMESTIC COMPETITIVE BIDDING
1.0 INTRODUCTION
1.1 Based on PNGRB authorization, M/s. Bharat Petroleum Corporation Limited (BPCL). (here in after
referred to as BPCL or Owner’) is developing CNG & City Gas Distribution Infrastructure in the
Geographical Areas (GA) of and ROHTAK GA in the state of Haryana for serving consumers of various
sectors namely domestic, commercial, industrial & automotive.
2.0 BRIEF DESCRIPTION OF PROJECT
2.1 The present project is implementation of CGD project At. ROHTAK GA in the state of HARYANA to
ensure uninterrupted supply of natural gas to Domestic, Commercial, Automobile and Industrial
2.2 Bharat Petroleum Corporation Limited (BPCL), invites bids through single stage two envelopes system
from eligible bidders for “LAYING OF MDPE NETWORK & ASSOCIATED WORKS FOR CGD
PROJECT AT. ROHTAK GA IN THE STATE OF HARYANA” as defined in bid document.
3.0 BRIEF SCOPE OF WORK
i) Excavation of Murom, boulders etc.
ii) MDPE Pipe Line Laying
iii) Supply and installation of MDPE valves
iv) Installation of valve chambers
v) Restoration of the Roads, Pavements, Trenches, Pits etc.
vi) Fabrication and installation of pipeline markers
2. Miscellaneous civil work for foundations
3. Miscellaneous structural work for gate, fencing etc.
Complete scope of work shall be floated as a single part.
The scope details of the tender shall be as follows,
I. Tentative Requirement of PE laying is given below :-
Sr. No. Description
20 mm x PE 100 x SDR 11 MDPE Pipes - Supply &
2 32 mm x PE 100 x SDR 11 MDPE Pipes - Laying
3 63 mm x PE 100 x SDR 11 MDPE Pipes - Laying
4 90 mm x PE 100 x SDR 11 MDPE Pipes - Laying
5 125 mm x PE 100 x SDR 11 MDPE Pipes - Laying
Total length of MDPE net work
4.0 CONTRACT PERIOD
4.1 Completion period for complete scope of work, as defined in bid document, shall be Fifteen (15)
months from the date of “Letter of Acceptance (LOA)”. Completion period includes mobilization
period of 15 (Fifteen) days.
4.2 The effective date of contract will be the date of LOA (Letter of Acceptance). The scope of work shall
be completed, as per instructions of the Owner.
5.0 SUBMISSION OF BID & BID VALIDITY
5.1 Bids are required to be submitted only through BPCL e-procurement site at https://bpcltenders.eproc.in/
on or before the Bid due date & time for submission. Bidders are required to enroll on BPCL e-
procurement site at https://bpcltenders.eproc.in/
5.2 Physical Bids / Offers or Bids through any other mode shall not be accepted. The Offers submitted
through e-tendering system, as above shall only be considered for evaluation and ordering.
5.3 Bid should be valid for 6 (Six) months from the date of scheduled bid due date for submission.
6.0 BIDDING PROCEDURE:
6.1 This is Open Domestic Competitive Bidding. Single stage two bid system is adopted for this tender.
7.0 DETAILS OF BID DOCUMENTS
7.1 Type of Enquiry
Open Domestic Competitive Bidding
7.2 Tender Document Number
BPCL E - tender ID:
7.3 Availability of Tender
Document on Website https://bpcltenders.eproc.in/
7.4 Bid document fee Not Applicable
7.5 Pre bid meeting date and venue
7.6 EMD/ Bid Security Scanned copy of EMD/ Bid Security must be
submitted in EMD Envelope / Section at BPCL
Portal as per Clause No.
9.0 & 10.0 below
7.7 Bid Submission date and time 20/05/2022 till 15:00 HRS. (IST )
of Online submission of Bids
7.8 Online Opening of Techno-
Commercial Unpriced Bid 20/05/2022 at 15:01 HRS. (IST )
7.9 Price bid opening date and
Date and time shall be intimated later
The complete Bidding Document is available on BPCL website: https://bpcltenders.eproc.in/
Bidders can view /download the tender document from the above website.
All amendments, time extension, clarifications etc. will be uploaded in the above websites only and
will not be published in Newspapers. Bidders should regularly visit the above web site to keep
themselves updated, this is the Prime responsibility of Bidder.
8.0 BID EVALUATION CRITERIA (BEC)
8.1. The bidder shall have executed / completed successfully at least one (01) MDPE contract / work order
(s) involving ‘Laying, Installation, Testing and Commissioning of MDPE Network’ OR at least one (01)
LMC contract / work order (s) involving ‘Erection, installation, testing and commissioning of GI / Cu
piping for domestic PNG connections’ for any City Gas distribution Company within last seven (07)
years ending on last day of the month previous to the one in which tender is invited.
Experience criteria (executed / completed contract) of similar works as defined above should qualify in
either of the criteria as mentioned below;
Two (02) Three (03)
similar works each similar works each
Work Description similar work costing
costing costing
(inclusive of GST )
(inclusive of GST ) (inclusive of GST)
(In INR Lakhs) (In INR Lakhs)
associated works
for CGD Project at
BPCL Rohtak GA in
the state of Haryana
Minimum Average Annual Turnover (stand-alone) during the immediately preceding three financial
years should be at least as per the below table
Work Description Minimum Average
Annual Turnover
Laying of MDPE network and associated works
for CGD Project at BPCL Rohtak GA in the state of
In case the date of constitution / incorporation of the bidder is less than 3 years old, the average
turnover in respect of the completed financial years after the date of constitution shall be taken in
to account for this criteria.
The financial net worth of the bidder as per the audited financial results of immediately preceding financial
year should be positive.
Net worth shall be calculated by considering reserves, share application money pending allotment (if any),
share capital, less accumulated losses and deferred expenditure to the extent not written off.
Note: In case bidder quotes for more than one part, the requirement of annual turnover shall be on cumulative
basis for the quoted parts
b) Bidder shall not be on “Holiday List” as per BPCL/PSU or its subsidiaries records, under liquidation,
court receivership or similar proceeding. Undertaking to this effect to be submitted by bidder.
8.3 Clarificatory notes to BEC
a) In case the bidder is executing a Rate Contract / Annual Rate Contract (ARC) of above nature, which is
still running, and the contract value executed till one day prior to due date of bid submission is equal to or
more than the minimum prescribed value mentioned in the BEC, such experience will also be taken into
consideration provided that the bidder has submitted satisfactory work execution certificate to this effect
issued by the end user / owner / authorized consultant.
b) A job executed by a bidder for its own plant/ projects cannot be considered as experience for the purpose
of meeting requirement of BEC of the tender. However, jobs executed for Subsidiary / Fellow subsidiary/
Holding company executed value against any single order fulfilling BEC criteria will be considered as
experience for the purpose of meeting BEC subject to submission of tax paid invoice(s) duly certified by
statutory auditor of the bidder and challan towards payments of statutory tax in support of the job executed
for Subsidiary / Fellow subsidiary /Holding company. Such bidders to submit these documents in addition
to the documents specified in the bidding documents to meet BEC.
c) In case audited balance sheets and profit and loss account for the immediately preceding financial year is
not available for bid closing date up to 30th September, the Bidder has an option to submit the audited
balance sheets and profit & loss account of the three previous years immediately prior to the last financial
year. However, for bid closing date after 30th September, the bidder has to compulsorily submit the
audited balance sheets and profit and loss account for the immediate three preceding financial years, for
evaluation and his qualification with respect to financial criteria. In any case the date (i.e., the financial
period closing date) of the immediate previous year’s audited annual accounts should not be older than
eighteen (18) months from the bid due date.
d) For the bidder whose financial year is Calendar Year, for such bidders the audited financial results for the
year 2018-19, 2019-20 and 2020-21. Shall be applicable in lieu of 2019-20, 2020-21 and 2021-22.
8.5 Bids may be submitted by:
1. Bids may be submitted by an Entity (Sole domestic bidder) and must be duly registered with GST.
Sole domestic bidder should have completed 3 financial years after date of commencement of
2. Bidding through JV or in a Consortium is not permitted.
3. Works done as a Sub-contractor is not permitted.
4. Sole bidder shall meet each requirement of Bidder Evaluation Criteria (BEC) as mentioned above.
8.6 Documents required to be submitted by bidder along with the bid for qualification of BEC:
Clause Description Documents required for qualification
a. Detailed work order along with Schedule of
b. Completion certificate issued by end user /
Owner (or their consultant who has been duly
authorized by owner to issue such certificate)
8.1.1 Experience only after completion of work in all aspect.
Note: The completion/execution certificates shall have
details like work order no. /date, brief scope of work,
completion date, executed value, etc.
a. Detailed work order along with Schedule of
b. Execution certificate issued by end user / Owner
(or their consultant who has been duly
8.4 Note In case of rate authorized by owner to issue such certificate)
a) contract only after execution of work in all aspect.
Note: The completion/execution certificates shall have
details like work order no. /date, brief scope of work,
completion date, executed value, etc.
for Subsidiary / Tax paid invoice(s) duly certified by statutory auditor of
8.4 Note Fellow the bidder and challan towards payments of statutory tax
b) subsidiary / in support of the job executed for Subsidiary / Fellow
Holding subsidiary /Holding company.
Bidder(s) shall submit copy of Audited Annual
Financial Statement [Balance Sheet and Profit & Loss
Account Statement along with its annexures along with
8.2.1 Independent Auditor report] of last three (3) preceding
Financial Year(s) duly signed and stamped by a
Statutory auditor/ Third Party Inspection Agency
(TPIA), as per BEC, along with un-price bid.
Bidder(s) shall submit copy of Audited Annual
Financial Statement [Balance Sheet and Profit & Loss
Account Statement along with its annexures and
8.2.2 Net Worth Independent auditor report] of last preceding Audited
Financial Year duly signed and stamped by a statutory
auditor/ Third Party Inspection Agency (TPIA), as per
BEC, along with un-price bid.
8.5 (I) GST Documentary Evidence for GST registration
Owner reserve the right to reject the bid without making any reference to the bidder.
i. Failure to meet the above qualifying criteria(s) will render the bid to be summarily rejected.
Therefore, the bidder shall in his own interest furnish complete documentary evidence including
certificate(s) from the client of the work executed etc. to justify that the bidder meets the qualifying
ii. The e-bid must be complete in all respects, leaving no scope of ambiguity. Bidder is fully
responsible for the bid submitted and no relief or consideration can be given for errors and
omissions. In-complete BEC documents shall be liable for rejection.
iii. Authentication of Documents
All documents furnished by the bidder in support of meeting the Technical and Financial criteria of
Duly certified by Statutory Auditors of the bidder
Duly verified and certified by any one of the following independent Third Party Inspection
Agency (TPIA) registered under “NABCB accredited bodies as per requirement of
ISO/IEC17020 as Type A” in QCI NABCB website
(nabcb.qci.org.in/accreditation/reg_bod_inspection_bodies.php) as on date of bid submission, at
no extra cost to BPCL The verification and certification should necessarily include comment
“Verified from Originals”, with name and contact details (contact number and email ID) of the
certifying officer including address of Third Party Inspection Agency (TPIA) branch
undertaking the certification.
8.7 It is mandatory that all documents verified / attested by Chartered Accountant (CA) should
have Unique Document Identification Number (UDIN) generated on the portal of ‘The
Institute of Chartered Accountants of India’ (https://udin.icai.org/)’.
8.8 Hard copy of the original verified documents (with Original stamp by Third Party Inspection
Agency (TPIA) / Statutory Auditor should be submitted to BPCL by the successful bidder for
future reference. BPCL reserves the right to request for original documents of bidder at any
time during tendering process.
8.9 All documents furnished by the bidder in support of meeting the Technical and Financial criteria of
BEC shall be duly certified as stated above otherwise shall be liable for rejection.
8.10 All documents furnished by the bidder in support of meeting the Technical and Financial criteria of
BEC shall be submitted in a separate section / booklet along with their unpriced bid. This section /
booklet shall be titled as “Documentation against Bid Evaluation Criteria (Technical and Financial)”
with proper index and page numbering.
8.11 Bidders are required to ensure that the value of completed job indicated by them depicts separately the
value of completed job and GST as applicable. Accordingly, the completion certificate submitted by
the bidder shall separately indicate the GST amount included in the value of completed job OR a
separate certificate from the respective client, mentioning the GST/ service taxes amount if any,
included in the value of completed job under consideration should be submitted by the bidder.
8.12 In case GST amount/component is not specified in the submitted completion certificate, then it shall
be presumed that the amount mentioned in the certificate is including goods amount and GST
(whichever is applicable) and the offer shall be evaluated accordingly.
8.13 Submission of authentic documents is the prime responsibility of the Bidder. However,
Owner/Consultant reserves the right of getting the document cross verified, at their discretion from the
document issuing authority.
8.14 Owner reserves the right to complete the evaluation based on the details furnished (without seeking
any additional information) and / or in-house data, survey or otherwise. In case of ambiguity or
incomplete documents pertaining to BEC, bidders shall be given only one opportunity with a fixed
deadline after bid opening to provide complete and unambiguous documents in support of meeting the
BEC. In case the bidder fails to submit any document or submits incomplete documents within the
given time, the bidder’s offer will be evaluated based on the available documents.
9.0 EMD/ BID SECURITY
9.1 All bids must be accompanied by an EMD / bid security. Scanned copy of EMD / Bid Security must
be uploaded under EMD Envelope / Section on BPCL E-proc portal, otherwise Bid offer is liable for
9.2 MSE Bidders are exempted from submission of EMD.
9.3 All Bidders quoting as MSE, would be required to submit Chartered Accountant (CA) certificate
along with “MSE-Certificate” to avail the benefits under Public Procurement Policy as per MSMED
Act 2006/ Public Procurement Policy Order 2012. The Chartered Accountant (CA) certificate should
be dated after the date of floating of tender and shall be specific to the tender for which bid is being
submitted. Format of the Chartered Accountant (CA) certificate is attached as Form
9.4 It is mandatory that all documents verified / attested by Chartered Accountant (CA) should
have Unique Document Identification Number (UDIN) generated on the portal of ‘The
Institute of Chartered Accountants of India’ (https://udin.icai.org/)’.
9.5 In case of NSIC Bidder, a valid NSIC (National Small Industries Corporation) certificate to be
submitted by bidder duly certified by listed Third Party Inspection Agency (TPIA) OR Chartered
Accountant (CA)
9.6 All bids submitted by Non - MSE Bidders, must be accompanied with EMD/ Bid Security
amount as per below table:-
Work Bid Security/ EMD (in Lakh)
9.7 EMD shall be in favour of Bharat Petroleum Corporation Limited and shall be acceptable in the form
Demand Draft (Payable at Mumbai) or Bank Guarantees (B.G.) in the prescribed pro-forma from
Scheduled Commercial banks in India/ Indian Branch of Foreign Bank, EXCEPT YES BANK, CKP
CO-OP BANK and Punjab and HARYANA CO-OP BANK (PMC). The B.G. shall be valid for a
period of 6 months from the final due date of submission of Bid with a claim period of 3 months.
9.8 Bidders are required to submit the EMD (in the prescribed format) in original at the time of bid
submission in sealed envelope and are required to upload the scanned copy of EMD on BPCL e-portal
along with e-Bid. EMD in original shall be submitted in a sealed envelope titled “Earnest Money
Deposit for LAYING OF MDPE NETWORK & ASSOCIATED WORKS FOR CGD PROJECT
AT. ROHTAK GA IN THE STATE OF HARYANA”, at Bharat Petroleum Corporation Limited
Bidder must upload the scanned copy of EMD (in the prescribed format) on BPCL e-procurement site
along with the e-bid. Swift message / Cheque / Cash / NEFT / RTGS shall not be acceptable. In case
bidder fails to upload scanned copy of EMD on BPCL e-portal by the bid due date & time, such bids
shall not be considered for evaluation.
9.9 BPCL will allow Public Sector Enterprises (Central/State), purchase preference as admissible/
applicable from time to time under the existing Govt. policy. BPCL shall also follow the Public
Procurement Policy on Procurement of Goods and services from Micro and Small Enterprises (MSEs)
Order 2012 for EMD/ Bid security also. Directives issued by Govt. of India from time to time shall be
given due consideration during bid evaluation.
9.10 If the Bidder is unable to submit original EMD within the due date and time of Bid submission, he
may submit the same within 7 calendar days from the date of unpriced bid opening, provided scanned
copy of the same have been uploaded on E-Tendering website along with the bid. In case the Bidder
fails to submit the EMD in original within 7 calendar days, his bid shall be rejected, irrespective of
their status / ranking in tender and notwithstanding the fact that a copy of EMD were uploaded earlier
9.11 Following categories of bidders shall be exempted from paying Earnest Money Deposit (EMD):
• Units registered with National Small Industries Corporation (NSIC).
• Units falling under Micro & Small Enterprises (MSEs) category as defined under the MSMED Act
2006. The above are subject to the fulfilling of under mentioned conditions:
a) Units should be registered with National Small Scale Industrial Corporation Limited (NSIC) or
with any of the Authorities specified under the Public Procurement Policy for MSE’s (DIC / KVIC
/ KVIB / Coir Board / NSIC / Directorate of Handicrafts and Handloom or any other body specified
by Ministry of MSME).
b) Registration Certificate is valid for a period at least upto validity of the bid offer i.e. six months
from the schedule date of bid submission.
10.0 SUBMISSION OF ORIGINAL DOCUMENTS
10.1 The following documents, in addition to uploading in the bid on BPCL e-procurement site, shall also
be submitted in Original (in physical form) within Seven (07) calendar days from the bid due date to
Bharat Petroleum Corporation Limited 12th Floor, F’ Wing, Maker Tower, Cuffe Parade, Mumbai,
Maharashtra 400005, providing the scanned copies of the same have been uploaded in e-tender by the
bidder along with e-bid within the due date:-
i) EMD / Bid Security as per Clause No. 9.0 & 10.0 of IFB
ii) Power of Attorney as per Clause No. 12.4 of ITB
iii) Integrity Pact as per Form –
iv) Declaration of liquidation, court receivership or similar proceeding as per Form –
The original affidavit containing the declaration shall be submitted along with the original other
Bidders to ensure that "Cut Out Slip" attached to IFB, must be pasted on outer envelope to ensure
that above mentioned original documents reaches to concerned official within Seven (07) calendar
days from the date of Bid Opening.
11.0 PRE-BID MEETING
11.1 The bidder(s) or his official representative are requested to attend the pre-bid meeting through
conference call so that their queries, if any, related to the tender document and scope of work can be
addressed. Nonattendance of the pre-bid meeting shall not be cause of disqualification of the bidder.
11.2 The bidders may send their queries, if any, on Bidding Document by email / courier to reach Bharat
Petroleum Corporation Limited before the pre-bid meeting. These queries shall be replied during
the Pre-bid meeting.
Contact persons for this tender are: -
1. Mr. Rafeeque N M, (BPCL, Mumbai HQ)-Mob.
Chief Manager, Engineering Services, E-mail: [email protected]
2. Mr. Ajit Singh– Mob.
Territory Manager (Gas) Haryana 2, E-mail: [email protected]
12.0 ZERO DEVIATION BIDS
12.1 This is a ZERO deviation bidding process. Bidder is to ensure compliance of all provisions of the
bidding document and submit their bid accordingly. Bids with any deviation to the bid conditions
shall be liable for rejection.
13.1 Bharat Petroleum Corporation Limited will not be responsible or liable for cost incurred in preparation,
submission & delivery of bids, regardless of the conduct or outcome of the bidding process.
13.2 In case any bidder is found to be involved in cartel formation, his Bid will not be considered for
evaluation / placement of order. Such Bidder will also be debarred from bidding in future.
13.3 Canvassing in any form by the Bidder or by any other agency on their behalf may lead to disqualification
13.4 Unsolicited clarifications to the bid offer and / or change in the prices during the validity period would
render the bid liable for rejection.
13.5 Bharat Petroleum Corporation Limited reserves the right to reject any or all the bids received or annul
the bidding process at any time at their sole discretion without assigning any reason whatsoever.
13.6 BPCL will allow Public Sector Enterprises (Central/State), purchase preference as admissible/
applicable from time to time under the existing Govt. policy. BPCL shall also follow the Public
Procurement Policy on Procurement of Goods and services from Micro and Small Enterprises (MSEs)
13.7 All other terms and condition shall be as per the bidding documents.
13.8 Bidder shall furnish necessary documentary evidence along with the bid, by way of track record,
copies of work order, division of responsibilities for the work performed, completion certificate, MOU
document/ commitment letters etc. as per requirement. In absence of such documents, BPCL reserve
the right to reject the Bid without making any reference to the Bidder or assigning any reason what-
so-ever. Bidder shall provide documentary proof in the form of purchase order/contract letter. Offers
received without documentary proof are liable for rejection.
13.9 BPCL decision on any matter regarding short listing of bidders shall be final.
13.10 Bids of bidders on “Holiday” as per BPCL/PSU or its subsidiaries records shall not be considered for
evaluation and ordering.
13.11 Failure to meet the above Qualification Criteria will render the Bid liable to be rejected. Therefore,
the bidder shall in his own interest furnish complete documentary evidence in the first instance itself,
in support of their fulfilling the Qualification Criteria as given above. BPCL reserves the right to
complete the evaluation based on the details furnished without seeking any additional Information.
13.12 All documents submitted should be in English only.
13.13 Directives issued by Govt. of India from time to time shall be given due consideration during bid
13.14 All questions and requests for clarifications or interpretations related to tender documents shall be
addressed in writing to:
Contact persons for this tender are: -
1. Mr. Rafeeque N M, (BPCL, Mumbai HQ)-Mob.
Chief Manager, Engineering Services, E-mail: [email protected]
2. Mr. Ajit Singh– Mob.
Territory Manager (Gas) Haryana 2, E-mail: [email protected]
13.15 Contact numbers of support desk of BPCL e-procurement (e-bid) website in case of any issue with
website which is as follows:
1 Sainil Bandodkar - +91 9158346209, [email protected]
2 Fairlin Jivin - +91-124-4302000 Ext : 112, [email protected]
Details of Helpdesk team are available under the link ‘Contact Us/Helpdesk’ on the e-procurement portal
https://bpcltenders.eproc.in/Product/publicDash
DO NOT OPEN - THIS IS A QUOTATION / ORIGINAL DOCUMENTS
Bid Document No.
Description: LAYING OF MDPE NETWORK AND ASSOCIATED WORKS FOR CGD PROJECT AT.
ROHTAK GA IN THE STATE OF HARYANA
Due Date & Time :
…………………………………… Mr. Rafeeque N M, (BPCL, HQ)-Mob.
8547868073, Chief Manager, Engineering
…………………………………… Services, GAS SBU,
Bharat Petroleum Corporation Limited
12th Floor, F’ Wing, Maker Tower, Cuffe
Parade, Mumbai, Maharashtra
(To be pasted on the envelope containing Physical documents in line with clause no. 10 above.)
INSTRUCTIONS TO BIDDERS (ITB)
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 ELIGIBILITY OF BIDDERS
3.0 ONE BID PER BIDDER
4.0 COST OF BIDDING
5.0 SITE LOCATION / SITE VISIT
6.0 ACKNOWLEDGEMENT & CONFIRMATION
7.0 CONTENTS OF BIDDING DOCUMENT
8.0 CLARIFICATION OF BIDDING DOCUMENTS
9.0 AMENDMENT OF BIDDING DOCUMENTS
10.0 CONFIDENTIALITY OF BIDDING DOCUMENT
11.0 LANGUAGE OF BID
12.0 DOCUMENTS COMPRISING THE BID
13.0 BID PRICES & BIDDING CURRENCY
14.0 BID VALIDITY
15.0 EMD/ BID SECURITY
16.0 PRE-BID QUERIES
17.0 FORMAT AND SIGNING OF BID
18.0 BID REJECTION CRITERIA / COMPLIANCE TO BID REQUIREMENT
20.0 CHECK LIST FOR SUBMISSION OF BID
21.0 SUBMISSION OF BID
22.0 DATE, TIME & PLACE OF SUBMISSION
24.0 MODIFICATION AND WITHDRAWAL OF BIDS
25.0 PURCHASER’S RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS
26.0 OPENING OF BIDS
27.0 CLARIFICATIONS OF BIDS
28.0 CONFIDENTIALITY
29.0 CONTACTING THE OWNER / CONSULTANT
30.0 EVALUATION OF TECHNO-COMMERCIAL BIDS
31.0 OPENING OF PRICE BID
32.0 CORRECTION OF ERRORS
33.0 EVALUATION OF PRICE BIDS
34.0 PUBLIC PROCUREMENT POLICY FOR MICRO AND SMALL ENTERPRISES
35.0 ANTI-PROFITEERING CLAUSE
36.0 PROVISION REGARDING POLICY TO PROVIDE PURCHASE PREFERENCE
37.0 UNSOLICITED POST TENDER MODIFICATION
38.0 AWARD OF CONTRACT
39.0 DOCUMENT VERIFICATION
40.0 BPCL'S RIGHT TO ACCEPT OR REJECT ANY BID
41.0 NOTIFICATION OF AWARD / LETTER OF ACCEPTANCE
42.0 CONTRACT AGREEMENT AND SIGNING OF AGREEMENT
43.0 MODIFICATION OF INSTRUCTIONS TO TENDER
44.0 CONTRACT PERFORMANCE GUARANTEE / SECURITY DEPOSIT
45.0 CARTEL FORMATION
46.0 FRAUDULENT PRACTICES
47.0 INTEGRITY PACT
48.0 PROVISIONS FOR STARTUPS
49.0 IEM DETAILS - Integrity Pact Program
1.0 INTRODUCTION
1.1 This tender deals with “LAYING OF MDPE NETWORK AND ASSOCIATED WORKS FOR CGD
PROJECT AT BPCL ROHTAK GA IN THE STATE OF HARYANA”. For details refer Technical Part
/ SOW / IFB/ complete Bid document.
1.2 Bharat Petroleum Corporation Limited invites e-bids in two part bids under single stage for the entire
scope of work covered under the Bidding Document on item rate work contract basis (hereinafter for the
purpose of these instructions collectively referred as “Works”).
1.3 It shall be Bidder’s responsibility to have thorough understanding of the reference documents, site
conditions and specifications included in the Bidding Document.
1.4 In case, the name of entity is written as ‘Bharat Gas Resources Limited / BGRL’ anywhere in the bidding
documents (Volume I & II), it shall be deemed as ‘Bharat Petroleum Corporation Limited / BPCL’
2.0 ELIGIBILITY OF BIDDERS
The Bidder shall not be under a declaration of ineligibility by Owner for Corrupt/ Fraudulent/ Collusive/
Coercive practices.
2.1 The Bidder is not put on holiday/ banned by Bharat Petroleum Corporation Limited or put on holiday/
banned by any Government Department/ Public Sector Enterprise on due date of submission of bid. If
documents are downloaded from website, offers submitted by such bidders shall not be considered for
opening/ evaluation/award.
In case there is any change in status of the declaration prior to award of contract, the same has to be
promptly informed to BPCL by the bidder.
2.2 The Bidder should not be under any liquidation court receivership or similar proceedings on due date of
submission of bid.
In case there is any change in status of the declaration prior to award of contract, the same has to be
promptly informed to BPCL by the bidder.
It shall be the sole responsibility of the bidder to inform BPCL in case the bidder is under any liquidation
court receivership or similar proceedings OR on under any kind of Contractual Agreement OR change
in constitution on due date of submission of bid and during the course of finalization of the tender.
Concealment of the facts shall tantamount to misrepresentation of facts and shall lead to action against
such Bidders as per BPCL policy.
2.3 Bidder is required to furnish the complete and correct information / documents required for evaluation
of their bids. If the information / documents forming basis of evaluation is found to be false /
misrepresentation / Fraudulent Practices /forged, the same shall be considered adequate ground for
rejection of bids.
2.4 Bidder shall not be affiliated with a firm or entity:
(i) That has provided consulting services related to the work to the Owner during the preparatory stages
of the work or of the project of which the works/services forms a part of or
(ii) That has been hired (proposed to be hired) by the Owner as an Engineer/ Consultant for the contract.
2.5 Pursuant to qualification criteria set forth in the bidding document, the Bidder shall furnish all necessary
supporting documentary evidence to establish Bidder’s claim of meeting qualification criteria.
2.6 Bidders shall, as part of their bid, submit a written power of attorney authorizing the signatory of the bid
to commit the bidder. Power of Attorney issued by the Board of Directors/ CEO /Chairman/ MD /
Company Secretary of the Bidder/ all partners in case of Partnership firm/any person authorized in terms
of Deed of LLP/Proprietor in favour of the authorized employee(s) of the Bidder, in respect of the
particular tender for signing the Bid and all subsequent communications, agreements, documents etc.
pertaining to the tender and to act and take any and all decision on behalf of the Bidder, is to be submitted.
The authorized employee(s) of the Bidder shall be signing the Bid and any consequence resulting due to
such signing shall be binding on the Bidder.
3.0 ONE BID PER BIDDER
3.1 Each bidder shall submit only one bid. A bidder who submits or participates in more than one bid will be
disqualified. If bid of companies which is managed & controlled by same group of individual (common
owners/ proprietor, common partner/ common directors), the participation in a particular tender by more
than one such bidder will not be allowed, and bids will be disqualified.
3.2 Also, if this fact is known at a later stage during bid evaluation or even after finalization of contract, the
award will be made null and void and appropriate action any form and putting the firms on holiday list
3.3 Alternative Bids shall not be considered.
4.0 COST OF BIDDING
4.1 The Bidder shall bear all costs associated with the preparation and submission of the Bid including but not
limited to Bank charges all courier charges including taxes & duties etc. incurred thereof. Further, BPCL
will in no case, be responsible or liable for these costs, regardless of the outcome of the bidding process.
5.0 SITE LOCATION / SITE VISIT
5.1 Bidder is advised to visit and examine the site, its surroundings and familiarize himself of the existing
facilities and environment, and collect all other information which he may require for preparing and
submitting the bid and entering into the Contract. Claims and objections due to ignorance of existing
conditions or inadequacy of information will not be considered after submission of the bid and during
implementation.
5.2 The Bidder or any of its personnel or agents will be granted permission by BPCL to enter upon its premises
and land for the purpose of such visits, but only upon the explicit condition that the Bidder, his personnel
or agents will release and indemnify BPCL and his personnel and agents from and against all liabilities in
respect thereof and will be responsible for personal injury (whether fatal or otherwise), loss of or damage
to property, and any other loss, damage, costs, and expenses incurred as a result thereof.
5.3 The Bidder shall not be entitled to hold any claim against BPCL for non-compliance due to lack of any kind
of pre-requisite information as it is the sole responsibility of the Bidder to obtain all the necessary
information with regard to site, surrounding, working conditions, weather etc. on its own before submission
5.4 FOR SITE VISIT CONTACT DETAILS
BHARAT PETROLEUM CORPORATION LIMITED
Mr. Ajit Singh – Mob.
Territory Manager (Gas) Haryana 2 E-mail: [email protected]
BHARAT PETROLEUM CORPORATION LIMITED
Mr. Rafeeque N M, (BPCL, HQ)-M
Chief Manager, Engineering Services, E-mail: [email protected]
6.0 ACKNOWLEDGEMENT & CONFIRMATION
6.1 Bidder shall acknowledge against the Tender on BPCL’s website https://bpcltenders.eproc.in/ and confirm
his intention to bid or reason(s) of not participating in the tendering or in case of regret / negative
acknowledgement.
A. BIDDING DOCUMENT CLARIFICATION AND AMENDMENT
7.0 CONTENTS OF BIDDING DOCUMENT
7.1 The Bidding Document shall be read in conjunction with any amendment issued in accordance with
Clause 9.0 below.
Volume I Commercial Volume
Section-I : Invitation for Bid [IFB]
Section-II : Instructions to Bidders [ITB]
Section-III : General Conditions of Contract [GCC]
Section-IV : Special Conditions of Contract [SCC]
Section-V : Forms & Formats
Volume II to II – Technical Volume
Technical Specifications, Scope of Work and Drawings etc.
7.2 Although all the details presented in this Bidding Document have been compiled with reasonable care,
however, the Bidder is expected to examine the Bidding Document, including all instructions, forms,
terms, specifications and drawings in the Bidding Document and Bidder to ensure that the information
provided is adequate, clearly understood and it includes all documents as per Master Index.
7.3 Bidding documents once issued / downloaded are non-transferable.
8.0 CLARIFICATION OF BIDDING DOCUMENTS
8.1 Bidder shall examine the Bidding Document thoroughly in all respect and if any conflict, discrepancy,
error or omission is observed, Bidder may request clarification within the cutoff date as specified in IFB
or prior to the Bid Closing Date. Such clarification requests shall be directed to the address given in
8.2 Any failure by Bidder to comply with the aforesaid requirement shall not excuse the Bidder, after
subsequent award of Contract, from performing the work in accordance with the Contract.
8.3 Response to queries / clarifications raised will be sent as expeditiously as possible to all who have been
issued the Bidding Documents. The response shall not form part of the Bidding Document unless issued
as an Addendum / Amendment. The queries raised (without identifying the sources of the query) and
the responses will be uploaded on website.
8.4 Bidders are expected to resolve all their clarifications/queries to the Bidding Document and submit their
bid in total compliance to Bidding Document without any deviation / stipulation / clarification.
9.0 AMENDMENT OF BIDDING DOCUMENTS
9.1 BPCL may, for any reason whether at his own initiative or in response to the clarification requested by
the prospective bidder(s), issue amendment in the form of Addendum during the bidding period and
subsequent to receiving the bids. Any addendum thus issued shall be part of the Bidding Documents
and Bidder shall submit ‘Original’ Addendum / Compliance letter duly signed and stamped in token of
his acceptance.
9.2 For Addendum issued during the bidding period, Bidder shall consider the impact in his bid. For
Addendum issued subsequent to receiving the bids, Bidder shall follow the instructions issued along
with addendum with regard to submission of impact on quoted price / revised price, if any.
9.3 The Owner, if consider necessary, may extend the date of submissions of Bid in order to allow the
Bidders a reasonable time to furnish their most competitive bid taking into account the amendment
issued thereof.
10.0 CONFIDENTIALITY OF BIDDING DOCUMENT
10.1 Bidders shall treat the bidding documents and contents therein as strictly confidential.
10.2 The Bidding Document is and shall remain the exclusive property of BPCL without any right to Bidder
to use them for any purpose except for the purpose of Bidding.
B. PREPARATION OF BIDS
11.0 LANGUAGE OF BID
11.1 The Bid and all correspondence, drawing(s), document(s), certificate(s) etc. related to the bid exchanged
by bidder and BPCL shall be written in English Language. For supported documents and printed
literature submitted in any another language, an equivalent English translation shall also be submitted.
Responsibility for correctness in translation shall lie with the Bidder. In case of any conflict, for the
purpose of interpretation of the bid, the English translation shall govern.
12.0 DOCUMENTS COMPRISING THE BID
12.1 The e-bid must be complete in all respects, leaving no scope of ambiguity. Bidder is fully responsible
for the bid submitted and no relief or consideration can be given for errors and omissions.
12.2 The bid shall be submitted by uploading relevant document in respective covers provided in the e-
tendering website.
• EMD/ BID SECURITY
• DOCUMENTATION AGAINST BIDDER QUALIFICATION CRITERIA
• TECHNO-COMMERCIAL / UNPRICED BID
• PRICE BID - : Bidder shall quote (plus (+) (increase), minus (-) (decrease) or zero (0) (at par) in
percentage on total offered price under- Price bid form only. No scanned copy of quoted Price (in
percentage (%)) to be submitted.
12.3 Documentation against Bid Evaluation Criteria shall contain the following documents and to be uploaded
in e-tendering BPCL website:
• Work order / PO / Agreement of similar works executed / completed by the bidder mentioning the value
and the scope of work as documentary evidence.
• Completion/ Execution Certificate of similar works from the client / end user / any documentary
evidence to establish successful completion of similar works.
• Audited Annual Financial Statement [Balance Sheet and Profit & Loss Account Statement along with
its annexures and Independent auditor report] of immediately preceding three financial years as per IFB.
12.4 Techno-Commercial / Un-priced bid shall contain the following documents and to be uploaded in
tendering website:
a) Covering Letter' on Bidder's 'Letterhead' clearly specifying the enclosed contents.
b) Copy of summary sheet of Schedule of Works (SOW) mentioning QUOTED/ NOT QUOTED for
c) Power of Attorney /copy of Board Resolution, in favor of the authorized signatory of the Bid on stamp
d) Copy of Partnership Deed in case of partnership firm or Memorandum & Article of Association in case
of limited company.
e) Duly attested documents in accordance with the "BID EVALUATION CRITERIA [BEC]" establishing
the qualification (Certification from Statutory Auditor OR Third Party Inspection Agency
(TPIA) as defined in tender document) as per attached format F-15.
f) 'Checklist for submission of bid, in 'Form F-1'.
g) 'Bid Form', as per 'Form F-2'
h) Declaration of liquidation, court receivership or similar proceeding as per ‘Form-3’
i) Bidder’s financial Capabilities as per Form F-4
j) Declaration by Bidder as per Form F-5
k) 'No Deviation Confirmation', as per 'Form F-6'
l) ‘Bidder's General Information', as per 'Form F-7'
m) 'Agreed Terms and Conditions', as per 'Form F-8'
n) Declaration by Black Listing / Holiday Listing as Per 'Form F-9'
o) Bank Mandate Form as Per 'Form F-10'
p) Undertaking for Non-Engagement of Child Labor as Per 'Form F-11'
q) Bidder's Queries as per 'Form F-12'
r) Indemnity Bond as per 'Form F-13'
s) Land Border as per ‘Form F-14’
t) VERIFICATION OF BIDDER’S EVALUATION CRITERIA (BEC) related documents -
Certification from Statutory Auditor OR Third Party Inspection Agency (TPIA) as defined in
tender document as per ‘Form F-15’
u) PP-LC Policy – as per ‘Form F-16’
v) Integrity Pact as per ‘Form F-17’
w) EMD / Bid Security – Exemption, duly Certified by Chartered Accountant confirming Eligibility for
benefits for PPP as per ‘Form-18’
x) PROFORMA OF BANK GUARANTEE - Earnest Money / Security Deposit Towards Performance as
y) Commercial & Technical with acceptance
z) Original Documents as per Clause No. 10.0 of IFB, to be submitted to BHARAT PETROLEUM
CORPORATION LIMITED Office, at Maker Tower, Mumbai, within Seven (7) calendar days from
the date of Un-priced Bid Opening.
aa) Cancelled Cheque of bidders.
bb) Reply To Pre Bid Queries / Corrigendum – IF APPLICABLE
cc) Any other information/details required as per Bidding Document.
Note: All the pages of the Bid must be signed by the "Authorized Signatory" of the Bidder.
12.5 Price Bid shall consist of Schedule of Works duly filled in percentage %. No stipulation, deviation, terms &
conditions, presumption, basis etc. shall be stipulated in Price Part of the bid. Any condition if stipulated
shall be treated as null and void and shall render the bid liable for rejection .
12.6 EMD / Bid Security:
Bid EMD / Bid Security, in the form of Crossed Demand Draft (DD) / Bank Guarantee (as per preformat
provided in GCC) of requisite amount in favor of “Bharat Petroleum Corporation Limited ” payable at
Mumbai, as stipulated in IFB, shall be submitted in following manner :-
Original Bid Security: Not later than Seven (7) calendar days from the date of Bid Opening Copy of Original
Bid Security: To be uploaded in E-Tendering Portal in EMD Envelope.
In case of exemption of EMD as per clause no. 9.0 of IFB & 15.0 of ITB, the scanned copy of the requisite
documents such as MSE, would be required to submit Chartered Accountant (CA) certificate along with
MSE-Certificate to avail the benefits under Public Procurement Policy as per MSMED Act 2006/ Public
Procurement Policy Order 2012. The CA certificate should be dated after the date of floating of tender and
shall be specific to the tender for which bid is being submitted. Format of the CA certificate is attached as
However, original of the same should be sent to Bharat Petroleum Corporation Limited office, Maker Tower
F-wing, Mumbai within Seven (7) calendar days from the date of Bid Opening along with other original
12.7 It is mandatory that all documents verified / attested by Chartered Accountant (CA) should have
Unique Document Identification Number (UDIN) generated on the portal of ‘The Institute of
Chartered Accountants of India’ (https://udin.icai.org/)’.
12.8 In case of NSIC Bidder, a valid NSIC (National Small Industries Corporation) certificate to be submitted
by bidder duly certified by listed Third Party Inspection Agency (TPIA) OR Chartered Accountant (CA).
12.9 Bidder shall submit the following documents in ORIGINAL within Seven (7) calendar days from the date
of Bid Opening, providing copy of the same have been uploaded on E- Tendering Website:
i) Original EMD / MSE / NSIC certificate along with certification as stated above
ii) Original Power of Attorney.
iii) Original signed and stamped Integrity Pact
iv) Original Declaration of liquidation, court receivership or similar proceeding as per ‘Form-3’ The
Address For Submission Of Original Documents Is As Follows:
Bharat Petroleum Corporation Limited
GAS BU, 12th Floor, Maker Tower, F- Wing, Cuff
Parade, Mumbai-
13.0 BID PRICES & BIDDING CURRENCY:
13.1 The unit rates defined in “Schedule of Works” are rates declared by Owner i.e., M/s Bharat Petroleum
Corporation Limited (BPCL) for percentage bidding purpose & shall remain firm, fixed and valid until
completion of the contract and will not be subject to any variation.
13.2 Prices indicated in SOW are in INR (Indian Rupees Only).
13.3 The unit rates indicated in the Schedule of Works are inclusive of all applicable taxes and duties including
BOCW tax, freight, Insurance including Transit Insurance, overheads, provision of safety gadgets to their
personnel, transportation, conveyance, trainings, recruitments, communication charges, liaison work, cost
for providing tools & tackles, equipment, machineries, spares, etc. excluding GST. However total prices
mentioned in the SOW is inclusive of GST.
13.4 Goods & Service Tax (GST) shall be paid against documentary evidence. Bidder should have valid GST
registration number of states for claiming GST.
13.5 Bidder should mention QUOTED/ NOT QUOTED in Summary Sheet attached in Section VI along with
Schedule of Works with declared rates.
13.6 Unless otherwise permitted in the Bidding Document, the bid shall be for the complete scope of work for
13.7 Further, Bidder shall also mention the “Harmonized System of Nomenclature (HSN) Code / Service
Accounting Codes (SAC) at the designated place in summary sheet of SOW.
13.8 It will be the duty of BIDDER / CONTRACTOR to duly observe and comply with all laws, rules, regulations,
orders and formalities applicable to GST, and other taxes & duties etc. on the manufacture, sale and / or
supply of any material to the BPCL The BIDDER /CONTRACTOR shall keep the BPCL indemnified from
and against any and all claims, demands, prosecutions, penalties, damages, demurrages and / or other levies
whatsoever made or levied by any Court, Tribunal or the Customs or other Authorities with respect to any
alleged breach, evasion or infraction of such duties, taxes, charges or levies or any breach or infraction of
such laws, rules, regulations, orders or formalities concerning the same and from the consequence thereof.
13.9 No Mobilization Advance and No secured advance will be paid.
13.10 TAXES & DUTIES
I. Reference of taxes subsumed in GST (Excise Duty, Sales Tax, VAT, Service Tax, octopi, entry tax etc.),
wherever appearing in the tender document/ GCC, shall appropriately be read as GST as per applicability.
Accordingly, GST registration certificate shall be submitted by bidder in place of Service Tax registration.
Invoice (Covetable, if applicable)’ or ‘Covetable bills (if applicable)’ wherever appearing in the tender shall
be read as ‘Invoice as per GST Act/ Law’.
14.0 BID VALIDITY
14.1 Bid shall remain valid for a minimum period of 6 (Six) months from final due date of submission of Bid.
During the above period, bidders shall not be entitled to revoke or cancel their Bid or to vary the Bid given
or any term thereof without written consent of the BPCL In case, Bidders are revoking or cancelling their
Bid or varying any terms in regard thereof without the written consent of BPCL, BPCL shall reject their
bids. Such Bidder also may be put on Holiday list.
14.2 BPCL may request the Bidders for extension of the period of validity of bid. If the Bidder agrees to the
extension request, validity of bid shall not be permitted to modify the bid because of extension, unless
specifically invited to do so.
15.0 EMD/ BID SECURITY
15.1 Bidder shall furnish, as part of its Bid, EMD for an amount as indicated in the IFB. The Bids not accompanied
with EMD or EMD not as per Pro-forma given in the Bidding Document shall be considered as non-
responsive and such Bids shall be liable for rejected. BPCL shall not pay any interest on EMD furnished.
15.2 Details of EMD shall be entered before uploading of bid and copy of EMD shall be uploaded in the respective
cover/envelope/ section provided in the e-tendering website for a value specified in IFB.
15.3 Following categories of bidders shall be exempted from paying Earnest Money Deposit (EMD):
i. Units registered with National Small Industries Corporation (NSIC).
ii. Units falling under Micro & Small Enterprises (MSEs) category as defined under the MSMED Act
The above are subject to the fulfilling of under mentioned conditions
a) Units should be registered with National Small Scale Industrial Corporation Limited (NSIC) or with any
of the Authorities specified under the Public Procurement Policy for MSE’s (DIC / KVIC / KVIB / Coir
Board / NSIC / Directorate of Handicrafts and Handloom or any other body specified by Ministry of
b) Registration Certificate is valid for a period at least up to validity of the bid offer i.e. six months
from the schedule date of bid submission.
15.4 Bid securities of unsuccessful bidders will be returned upon award of Contract. However, EMD of the
successful Bidder will be returned upon the Bidder's executing the Contract and furnishing the Security
15.5 The EMD may be forfeited:
I. If a Bidder withdraws its bid during the period of Bid Validity or does any breach of tendering terms and
II. If a bidder modifies his bid on his own
III. If a bidder after opening of price bid increases the price, though within the validity period and even
though the offer remains lowest
IV. In case of a successful Bidder, if the Bidder fails, within the specified period:
a) To sign the Contract.
b) To furnish the Security Deposit.
16.0 PRE-BID QUERIES
16.1 The purpose of the pre-bid queries will be to clarify issues and to answer questions on any matter pertaining
to the Tender conditions that may be raised by bidders who have been issued the Bidding Document.
16.2 The bidder is requested to submit any queries / clarification / information pertaining to Bidding Document
in writing delivered by hand or by fax / e-mail as per Form F-12 enclosed in the Bidding Document so as to
reach BPCL not later than the date specified in the Notice Inviting Tender. Queries / Clarifications /
Information sought in any other manner shall not be responded to. The editable soft copies of the queries may
also be e-mailed at the address [email protected]/ [email protected] to enable
Bharat Petroleum Corporation Limited to prepare replies to the queries against each query in same format
16.3 Bharat Petroleum Corporation Limited responses to Bidder’s queries / clarifications raised will be furnished
as expeditiously as possible to all those who have downloaded the Bidding Document and shall be e-mailed
to all other bidders who have downloaded the Bidding Document.
Any modification of the Bidding Document, which may become necessary as a result of the pre-bid queries
shall be intimated to all bidders through the issue of an Addendum / Amendment.’
17.0 FORMAT AND SIGNING OF BID
17.1 The bidder shall upload the Techno-commercial bid duly filled, signed and stamped by the authorized signatory
under the form provided in the e-tendering website.
17.2 All pages of bid shall be stamped and initialed by person(s) signing the bid.
17.3 The bid shall contain no interlineations, erasures or overwriting. In case any corrections are required, the
original writings shall be neatly cut / penned through and re-written nearby. No overwriting or erasure of
original writings by use of “white fluid” or otherwise is permitted. In case any erasure using “white correcting
fluid is found, the offer shall be liable to be rejected. All corrections / cuttings / alterations shall be signed in
full by the Bidder with date.
18.0 BID REJECTION CRITERIA / COMPLIANCE TO BID REQUIREMENT
18.1 Bharat Petroleum Corporation Limited expect Bidder’s compliance to requirement of Bidding Document
without any deviation and submit substantially responsive bid.
18.2 Bids not compliance to requirement of Bidding Document shall not be accepted and Bharat Petroleum
Corporation Limited may not seek any clarification / correspondence from bidders in case sufficient
acceptable bids are received. Therefore, bidders are requested to submit their bids complete in all respects.
18.3 Bidders shall ensure that their bids are complete in all respects and conform to terms, conditions and Bid
Evaluation criteria of Tender. Bids not complying with BHARAT PETROLEUM CORPORATION
LIMITED requirement and not submitted along with “Signed & Stamped” “Check List of Bids” as per
Form – 1, as confirmation of the same by Bidder, may be rejected without seeking any clarifications.
18.4 In any case, no exception or deviation shall be accepted to the following critical stipulations of Bidding
Document and bids containing deviations / exceptions to these shall be considered to be non-responsive and
are liable to be rejected:
• EMD/ BID SECURITY as per clause No. 9.0 & 10.0 of IFB
• BEC (Bid Evaluation Criteria) as per IFB
• Defect Liability Period
• Schedule of Works
• Completion schedule / Time Schedule
• Security Deposit / Performance Bank Guarantee
• Mobilization Advance
• Price Reduction Schedule
• Termination and suspension
• Force Majeure
• Scope of Work / Scope of Supply
• Liquidated Damages for Delay
• Integrity Pact
• Any other rejection criteria specified elsewhere in the Bidding Document.
18.5 The deviation on other clauses, if unavoidable, should be furnished as per Form-6 attached. Exception /
Deviations submitted in any other form and mentioned elsewhere in their Bid shall not be considered. If any
exception / deviation are acceptable to BPCL, the same shall be issued to all bidders through an amendment.
All other deviations / exceptions, not incorporated in amendment, shall be withdrawn by bidders failing which
offer of such bidders shall not be acceptable. If a bidder takes any further deviations other than those agreed,
while submitting the revised price bid / price implication (if any), his bid shall be rejected outright without
any reference. In case any deviations is found in the revised price bid / price implication, the bidder is also
liable to be placed on holiday for future tenders.
BPCL has initiated payments to Suppliers and Contractors electronically, and to facilitate the payments
electronically through 'e-banking'. The bidder should give the details of his bank account as per the bank
mandate form F-10.
20.0 CHECK LIST FOR SUBMISSION OF BID
20.1 To assist Bidder in ensuring the completeness of bid, a checklist for submission of various documents / details
in un-priced commercial part of bid, has been enclosed.
20.2 Bidder is required to fill the checklist and submit along with the bid for ready reference. All documents shall
be submitted under various sections as per this Check List.
C. BID SUBMISSION
21.0 SUBMISSION OF BID
21.1 For submission of Bid, due date and time for submissions of bids have been mentioned in the IFB. Bids cannot
be uploaded by bidders on the website beyond the Bid Due Date and time.
21.2 Bids shall be submitted through e-tender mode in the manner specified elsewhere in tender document. No,
Manual/ Hard Copy (Original) offer shall be acceptable.
22.0 DATE, TIME & PLACE OF SUBMISSION
22.1 Bid must be submitted by the bidder through e-tendering on or before bid due date and time mentioned in the
IFB or any extension thereof as duly notified at https://bpcltenders.eproc.in/ (However, Bidders are requested
not to ask any extension in due date for submission of Bids in view of tight project schedule.)
22.2 Bidders are advised in their own interest to carefully go through various help links provided at BPCL E
Tendering website so as to ensure that bids are uploaded in E-Tendering website well before the closing date
and time of bid submission.
22.3 In the event of failure in bidder’s connectivity with BPCL website during the last few hours on account of
problem on bidders account, they are likely to miss the deadline for bid submission. Due date extension
request due to this reason will not be entertained. In view of the same, bidders are advised to upload their bid
23.1 E-tendering system of BPCL shall close immediately after the due date & time for submission of bid and no
bids can be submitted thereafter.
23.2 Unsolicited Bids or Bids received to address other than one specifically stipulated in the tender document will
not be considered for evaluation/opening/award if not received to the specified destination within stipulated
24.0 MODIFICATION AND WITHDRAWAL OF BIDS
24.1 The Bidder may modify or withdraw its Bid after the Bid's submission but prior to the due date prescribed for
submission of Bids by selecting the detaching option available in the e-tender portal.
24.2 No bid shall be allowed to be withdrawn in the interval between the deadline for submission of bids and the
expiration of the period of bid validity specified by the Bidder. Withdrawal of a bid during this interval shall
result in the liable for rejection of Bid offer and suspension of Bidder for specified time to bid in another
25.0 PURCHASER’S RIGHT TO ACCEPT ANY BID AND TO REJECT ANY OR ALL BIDS
BPCL reserves the right to accept or reject any Bid, and to annul the Bidding process and reject all Bids, at
any time prior to award of Contract, without thereby incurring any liability to the affected Bidder or
Bidders or any obligations to inform the affected Bidder or Bidders of the ground for BPCL action. However,
Bidder if so desire may seek the reason (in writing) for rejection of their Bid to which BPCL shall respond
D. E-BID OPENING AND EVALUATION
26.0 OPENING OF BIDS
26.1 The un-priced Bids shall be opened online through e-tender portal, at the specified date and time given in
the RFQ document or extended otherwise. The Bidders who have submitted their Bid will be able to view
online the name & status of all the Bidders at their respective windows, after Bid opening by BPCL
27.0 CLARIFICATIONS OF BIDS
27.1 Bharat Petroleum Corporation Limited if necessary, will obtain clarifications on the submitted Bid offer, by
requesting for such information / clarification from any or all Bidders in response to their submitted Bid
documents, in writing. All responses shall be in writing, and no change in the price or substance of the bid
shall be permitted unless specifically sought by Bharat Petroleum Corporation Limited.
28.0 CONFIDENTIALITY
28.1 Information relating to the examination, clarification, evaluation and comparison of Bids, and recommendations
for the award of a Contract, shall not be disclosed to Bidder(s) or any other persons not officially concerned
with such process.
29.0 CONTACTING THE OWNER / CONSULTANT
29.1 From the time of Bid opening to the time of award of Contract, if any Bidder wishes to contact the Owner /
Consultant on any matter related to the Bid, it should do so in writing. Information relating to the examination,
clarification, evaluation & recommendation for award shall not be disclosed.
29.2 Any effort by the Bidder to influence the Owner / Consultant in the 'Bid Evaluation', 'Bid Comparison', or
'Contract Award' decisions may result in the rejection of the Bidder's Bid.
30.0 EVALUATION OF TECHNO-COMMERCIAL BIDS
30.1 Prior to price opening of bids Bharat Petroleum Corporation Limited will determine whether each bid
• Is accompanied by required EMD /Bid Security (as applicable as per Clause No. – 9.0 if IFB)
• Fulfils the Bid Evaluation Criteria (BEC) stated in IFB.
• Totally compliance to the requirement of the Bidding document.
• provides any clarifications and / or requirement pursuant to clause 27.0 above
30.2 Bidder shall submit all the details asked for with their Bid. However, Bharat Petroleum Corporation Limited
may give opportunity to the Bidders to submit missing details or clarifications within the stipulated time. In
case these are not submitted within stipulated time, offer of the Bidder will be evaluated based on available
details. The same shall be considered, if found adequate or else shall be rejected.
30.3 BPCL reserve the right to use in-house information for assessment of capability of Bidder and their
performance on jobs completed / in progress for evaluation purpose.
30.4 Pro-forma of Integrity Pact (IP) shall be returned by the Bidder along with the un-priced bid documents, duly
signed by the same signatory who is authorized to sign the bid documents. All the pages of the Integrity Pact
shall be duly signed. Bidder’s failure to return the IP duly signed along with the bid documents shall result in
the bid not being considered for further evaluation. Preforms of Integrity Pact is attached in tender document
30.5 Bidders may raise dispute / complaints, if any, with the nominated Independent External Monitors as
mentioned in the Integrity Pact Document.
30.6 Directives issued by Govt. of India from time to time shall be given due consideration during bid
31.0 OPENING OF PRICE BID
31.1 Price part of only those bidders, whose bids are considered techno-commercially acceptable, shall be opened
online. Bidders selected for opening of their price bids shall be informed about the date of price bid opening.
The considered techno-commercially acceptable Bidder will be able to view online the price sheets of other
techno-commercially acceptable bidders at their respective windows, after priced bid opening.
32.0 CORRECTION OF ERRORS
32.1 Bids determined to be substantially responsive will be checked by the Owner for any arithmetic errors (if
any). Errors will be corrected by the Owner as follows:
(i) When there is a difference between the evaluated rates in figures and words with respect to BPCL portal
generated price bid, the evaluated rate which corresponds to the amount (by multiplying the quantity and
evaluated rate) shall be taken as correct.
(ii) When the evaluated rate of the Bidder in figures and words tallies but the total amount is incorrect, the
evaluated rate shall be taken as correct and not the total amount and the total amount shall be recalculated/
corrected accordingly.
(iii) When it is not possible to ascertain the correct rate, in the manner prescribed above, the evaluated rate as
derived based on percentage (%) quoted by the Bidder, and the same evaluated derived rate shall be
adopted and the amount worked out, for comparison purposes.
32.2 In accordance with the above procedure for the correction of errors. If the Bidder does not accept the
corrected amount of bid, otherwise bid offer shall be liable for rejection and such bidder shall be suspended
for specified time to participate in other tender
33.0 EVALUATION OF PRICE BIDS
33.1 The Estimated item wise rates shall be published in price bid form for each Schedule of Works (SOW) line
item with quantity and the bidders are required to quote only the percentage (Plus (+) (increase), minus (-) (
decrease) or zero (0) (at par)) up to two decimal places. Bidders shall quote the percentage variation on total
estimated value published. This percentage variation as quoted by the bidder will apply uniformly to all the
items of Schedule of Works (SOW).
33.2 The evaluation shall be carried out on ‘lowest L1 cost basis’ including applicable GST, for complete scope
33.3 In case of tie (more than one bidder quote the same excess (+) / at par / less (-) on the offered total price) for
a particular part, reverse auction (RA) shall be conducted. The lowest evaluated offer considering the
maximum discount on the overall offered price will be declared as the start price for RA.
33.4 BPCL reserves the right to negotiate the rates with L1 bidder before finalizing the award.
BPCL NOT ENTITLED FOR INPUT CREDIT OF GST (CGST & /UTGST OR IGST) IN CASE
OF PRESENT TENDER.
In case the bidder is covered under Composition Scheme under GST laws, then bidder should quote
the price inclusive of the GST (CGST & SGST/UTGST or IGST). Further, such bidder should
mention “Cover under composition system” in column for GST (CGST & SGST/UTGST or IGST)
In case any chess on GST is applicable, same shall also be considered in evaluation.
No tax input credit on account of Goods and Service Tax (GST), shall be considered for the purpose
Conditional discount, if offered, shall not be considered for evaluation.
33.6 BIDS NOT CONFORMING TO TECHNICAL SPECIFICATIONS / REQUIREMENTS SHALL BE
34.0 PUBLIC PROCUREMENT POLICY FOR MICRO AND SMALL ENTERPRISES
NOT APPLICABLE FOR THIS TENDER.
35.0 ANTI-PROFITEERING CLAUSE
As per Clause 171 of GST Act it is Mandatory to pass on the benefit due to reduction in rate of tax or from
input tax credit to the consumer by way of commensurate reduction in prices. The Supplier of Goods /
Services may note the above and quote their prices accordingly. Bidder shall submit an undertaking to this
effect as per the format enclosed.
36.0 PROVISION REGARDING POLICY TO PROVIDE PURCHASE PREFERENCE
(LINKED WITH LOCAL CONTENT) (PP-LC)
(POLICY AMENDED AS DEFINED IN GAZETTE NOTIFICATION NO. FB/20013/2 / 2017-FP-
PNG DATED 23.02.2022 OF MINISTRY OF PETROLEUM & NATURAL GAS)
Refer Amended PP-LC Guideline at Annexure-I to ITB)
37.0 UNSOLICITED POST TENDER MODIFICATION
37.1 Bidders are advised to quote (plus (+) (increase), minus (-) (decrease) or zero (0) (at par)) as per terms and
conditions of the Bidding Document and not to stipulate deviations / exceptions. Once quoted, the bidder
shall not make any subsequent price changes, whether resulting or arising out of any technical / commercial
clarifications and details sought on any deviations, exceptions or stipulations mentioned in the bid unless
any amendment to Bidding Document is issued by BPCL Similarly, no revision in quoted price shall be
allowed and deviations stipulated by him are not accepted by Owner and are required to be withdrawn by
him/ Bidder in favor of stipulation of the Bidding Document. Any unsolicited proposed price change is likely
to render the bid liable for rejection.
37.2 In the event of any sub-Moto price increase sought by a bidder subsequent to the bid due date and which is
not as a result of any change in scope of work or terms and conditions, the bid of such a bidder shall be
37.3 After opening of price bid, if the bidder increases the price, though within the validity period and even
though the offer remains lowest, the bid should be rejected. In such event, Bid offer shall not be considered
for future enquiries for such actions.
37.4 Suo-moto Price reduction after price bid opening are to be ignored for evaluation. However, if the same
bidder happens to be the lowest based on original price bids, the benefit of such reduction may be availed of
while placing order.
37.5 Canvassing in any form will make the bid liable for rejection.
F. AWARD OF CONTRACT
38.0 AWARD OF CONTRACT
38.1 Subject to various clauses of ITB, the Owner will place the order on the successful bidders whose bid have
been determined to be substantially responsive and have been selected for award on GRAND TOTAL WISE
LOWEST L1 COST BASIS.
39.0 DOCUMENT VERIFICATION
39.1 Document verification with originals shall be carried out only for the successful bidders (s) after opening of
price bids. The technical qualification of the bidders shall be based on the document submitted by bidders
in the bid offer / TQ/CQ. Recommendations for award of contract shall be made only after verification of
documents with originals of the successful bidder (s).
39.2 As the documents are being submitted by the bidders in bid offer / TQ/CQ, the responsibility of authenticity
of documents shall be with bidders.
39.3 In case it is observed that any bidder has submitted forged documents, necessary action for holidays listing
of the bidder in line with Owner’s holiday listing guidelines shall be carried.
39.4 Statutory documents shall also be verified from online portal.
39.5 The bidders shall be required to present their original documents to tender inviting authority within a period
of Seven (07) days from date of opening of Price bids.
39.6 Please note that in event of failure of the bidder to get the original documents verified within the stipulated
time, Owner reserves the right to cancel his bid and the bidder shall be liable for necessary action for holidays
listing in line with Owner’s holiday listing guidelines.
40.0 RIGHT TO ACCEPT OR REJECT ANY BID
40.1 BPCL reserves the right to accept or reject any bid and to annul the bidding process and reject all bids at any
time prior to award of contract, without thereby incurring any liability to the affected bidder or bidders or
without any obligation to inform the affected bidder or bidders of the grounds or the reasons for BPCL’s
41.0 NOTIFICATION OF AWARD / LETTER OF ACCEPTANCE
41.1 Bidder, whose bid is accepted by BPCL, shall be issued “Letter of Acceptance (LOA)” prior to expiry of
bid validity. Bidder shall confirm acceptance by returning a signed copy of the Letter of Acceptance
(LOA) within Three (03) days, otherwise it is understood that Letter of Acceptance (LOA) is deemed
acceptable to Bidder.
41.2 Bharat Petroleum Corporation LIMITED shall not be obliged to furnish any information / clarification /
explanation to the unsuccessful Bidders as regards non-acceptance of their bids, BPCL shall correspond only
with the successful Bidder".
42.0 CONTRACT AGREEMENT AND SIGNING OF AGREEMENT
42.1 The Contractor shall execute a formal contract with BPCL within specified period from the date of issue of
Detailed Letter of Acceptance on a non-judicial stamp paper and of appropriate value. The cost of nonjudicial
stamp paper shall be borne by the Contractor.
42.2 Contract documents for agreement shall be prepared after the acceptance of bid. Until the final contract
documents are prepared and executed, this Bidding Document together with the annexed documents,
modifications, deletions agreed upon by BPCL and bidder’s acceptance thereof shall constitute a binding
contract between the successful Bidder and BPCL based on terms contained in the aforesaid documents and
the finally submitted and accepted prices.
42.3 The contract shall be signed directly between Owner and Contractor.
42.4 The Contract document shall consist of the following:
i) Contract Agreement on Non Judicial Stamp Paper
ii) Detailed Letter of Award / Acceptance along with enclosures
iii) Original Bidding Document.
iv) Amendment / Corrigendum to original Bidding Document issued, if any.
v) Letter of Intent (LOI)
vi) Integrity Pact
42.5 For all works of value 2 (Two) Lakhs and more, a formal agreement shall be signed between BPCL and
Contractor in the format given in GCC, on non-judicial stamp paper of appropriate value. Cost of stamp
paper shall be borne by the Contractor. Payments for such jobs shall be made by BPCL only after signing
agreement by authorized representatives of BPCL and the Contractor. One original plus 2 (Two) copies of
the contract documents shall be signed by the contractor and other copies shall be stamped. Original
agreement on stamp paper shall be retained by BPCL and one signed copy shall be given to Consultant and
the Contractor.
43.0 MODIFICATION OF INSTRUCTIONS TO TENDER
43.1 Instructions to Tenderers of GCC stand modified to the extent as specified in this Instructions to Bidders.
44.0 CONTRACT PERFORMANCE GUARANTEE / SECURITY DEPOSIT
44.1 After Notification of Award of works by BPCL, the successful bidder shall furnish a performance guarantee
/ security deposit. The Security Deposit may be furnished in the form of Accountant Payee Demand Draft
payable to BPCL or Bank Guarantee in the prescribed format. The BG shall be from any Indian Scheduled
Bank or an International Bank of repute having a branch in India or a corresponding banking relationship
with an Indian Scheduled Bank.
45.0 CARTEL FORMATION
45.1 In case any Bidder is found to be involved in cartel formation, his bid will not be considered for evaluation
/ placement of order. Such bidder will also be debarred from bidding in future.
46.0 FRAUDULENT PRACTICES
46.1 BPCL requires that Bidders / Vendors / Contractors observe the highest standard of ethics during the award
/ execution of Contract. “Fraudulent Practices” means a misrepresentation of facts in order to influence the
award of a Contract to the detriment of BPCL, and includes collusive practice among bidders (prior to or
after bid submission) designed to establish bid prices at artificial non-competitive levels and to deprive
BPCL of the benefits of free and open competition.
46.2 BPCL will reject a bid for award if it determines that the bidder recommended for award has engaged in
fraudulent practices in competing for the Contract in question.
46.3 Bidder is required to furnish the complete and correct information / documents required for evaluation of
their bids. If the information / documents forming basis of evaluation is found to be false / forged, the same
shall be considered adequate ground for rejection of bids.
46.4 In case, information / document furnished by the Bidder / Vendor / Contractor forming basis of evaluation
of his bid is found to be false / forged after the award of the contract. BPCL shall have full right to terminate
the contract and get the remaining job executed at the risk & cost of such Bidder / Vendor / Contractor
without any prejudice to other rights available to BPCL under the contract such as forfeiture of CPBG /
Security Deposit, withholding of payment etc.
46.5 In case, this issue of submission of false document comes to the notice after execution of work, BPCL shall
have full right to forfeit any amount due to the Bidder / Vendor / Contractor along with forfeiture of CPBG
/ Security Deposit furnished by the Bidder / Vendor / Contractor.
46.6 Further, such Bidder / Vendor / Contractor shall be put on Blacklist / Holiday / Negative List of BPCL
debarring them from future business with BPCL for a time period, as per the prevailing policy of BPCL
47.0 INTEGRITY PACT
The bidder(s) are required to execute the “Integrity Pact” attached in the Bid Document. In case a bidder
does not sign the Integrity Pact, his bid shall be liable for rejection.
48.0 PROVISIONS FOR STARTUPS
[NOT APPLICABLE FOR THIS TENDER]
49.0 IEM DETAILS - Integrity Pact Program –
Details of Independent External Monitors:-
Shri. Ramabhadran Shri. Jagadip Narayan Singh Shri. Anupam
Ramanujam Kulshreshtha
ADDRESS ADDRESS ADDRESS
44/24, 3rd trust Cross Street Address : C- 54, Bharatendu B-3/3, ‘Yarrows
Mandavelipakkam, Harischandra Marg, Anand Vihar, Apartments’, Plot C-58/5,
Chennai, 600028 New Delhi- 110092 Sector
Tamil Nadu Noida, UP -201309
Mob. No. 09495511954 Mob. No : 9978405930 Mob. No.
GENERAL CONDITIONS OF CONTRACT (GCC)
THE GCC DATED 22.01.2020 OF
BHARAT PETROLEUM CORPORATION LIMITED (BPCL)
ALL THE TERMS & CONDITIONS IN THE ENCLOSED GCC SHALL BE
APPLICABLE FOR THIS TENDER.
SECTION/ DETAILS
I DEFINITION OF TERMS
II GENERAL INFORMATION ABOUT SITE
2.1 LOCATION OF SITE & ACCESSIBILITY
2.2 SCOPE OF WORK
2.3 LAND FOR CONTRACTOR’S FIELD, GODOWN AND WORKSHOP
2.4 SAFETY STANDARDS FOR TEMPORARY BUILDINGS
III GENERAL INSTRUCTION FOR THE TENDERER
3 SUBMISSION OF TENDER
5 PURCHASE PREFERENCE
6a EARNEST MONEY
6b CONVERSION OF EMD TO SECURITY DEPOSIT
7a BID VALIDITY
7b LANGUAGE OF BID
8 ADDENDA / CORRIGENDA
9 RIGHT OF OWNER TO ACCEPT OR REJECT TENDER
10a INTEGRITY PACT (IP)
10b HOLIDAY LISTING
10c FOREIGN BIDDERS
11 COLLECTION OF DATA TENDERER’S RESPONSIBILITY & TIME SCHEDULE
12 RETIRED GOVERNMENT OR COMPANY OFFICER
13 SIGNING OF THE CONTRACT
14a FIELD MANAGEMENT
14b CONSULTANCY CONTRACTS
IV INTERPRETATION OF CONTRACT DOCUMENTS
15 INTERPRETATION OF CONTRACT DOCUMENT
16 SPECIAL CONDITIONS OF CONTRACT
17 CONTRACTOR TO OBTAIN HIS OWN INFORMATION
18 PERFORMANCE SECURITY DEPOSIT/RETENTION MONEY
19 TIME OF PERFORMANCE
20 FORCE MAJEURE
21 EXTENSION OF TIME
22 LIQUIDATED DAMAGES FOR DELAY
SUM PAYABLE BY WAY OF COMPENSATION TO BE CONSIDERED AS
23 REASONABLE COMPENSATION
WITHOUT REFERENCE TO ACTUAL LOSS
24 TERMINATION / OFFLOADING
25 FORFEITURE OF SECURITY DEPOSIT
26 ACTION WHEN WHOLE OF SECURITY DEPOSIT IS FORFEITED
CONTRACTOR REMAINS LIABLE TO PAY COMPENSATION IF ACTION NOT TAKEN
27 UNDER CLAUSE
28 NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORK
29 CHANGES IN CONSTITUTION
30 IF THE CONTRACTOR DIES
31 EMPLOYEES OF THE OWNER NOT INDIVIDUALLY LIABLE
32 OWNER NOT BOUND BY PERSONAL REPRESENTATIONS
33 CONTRACTOR’S OFFICE AT SITE
34 CONTRACTOR’S SUBORDINATE STAFF AND THEIR CONDUCTS
35 SUB-LETTING OF WORK
36 POWER OF ENTRY
37 CONTRACTOR’S RESPONSIBILITY WITH OTHER AGENCIES
38 OTHER AGENTS AT SITE
40 RIGHTS OF VARIOUS INTERESTS
41 RIGHT OF OWNER TO DETERMINE / TERMINATE CONTRACT
42 TERMINATION FOR CONVENIENCE
43 PATENTS AND ROYALTIES
45 OPERATION OF CONTRACT
V PERFORMANCE OF WORK
46 EXECUTION OF WORKS
47 COORDINATION AND INSPECTION OF WORK
48 WORK IN MONSOON AND DEWATERING
49 WORK ON SUNDAYS AND HOLIDAYS
50 GENERAL CONDITIONS FOR CONSTRUCTION AND ERECTION WORK
51 DRAWINGS TO BE SUPPLIED BY THE OWNER
52 DRAWINGS TO BE SUPPLIED BY THE CONTRACTOR
53 SETTING OUT WORKS
54 RESPONSIBILITY FOR LEVEL AND ALIGNMENT
55 MATERIALS TO BE SUPPLIED BY CONTRACTOR
56 MATERIALS SUPPLIED BY OWNER
57 CONDITIONS FOR ISSUE OF MATERIALS
58 MATERIALS PROCURED WITH ASSISTANCE OF OWNER
59 MATERIALS OBTAINED FROM DISMANTLING
60 ARTICLES OF VALUE FOUND
61 DISCREPANCIES BETWEEN INSTRUCTIONS
62 ALTERATIONS IN SPECIFICATIONS AND DESIGNS AND EXTRA WORK
63 VARIATION IN CONTRACT VALUE
64 ACTION WHERE NO SPECIFICATIONS ISSUED
65 ABNORMAL RATES
66 INSPECTION OF WORK
67 ASSISTANCE TO THE ENGINEERS
68 TESTS FOR QUALITY OF WORKS
70 ACTION AND COMPENSATION IN CASE OF BAD WORK
71 SUSPENSION OF WORKS
72 OWNER MAY DO PART OF WORK
73 POSSESSION PRIOR TO COMPLETION
74.1,2 PERIOD OF LIABILITY FROM THE DATE OF COMPLETION OF WORK
74.3 CARE OF WORKS
74.4 EFFECTS PRIOR TO TAKING OVER
VI BILLS / MEASUREMENT / PAYMENT
75 SCHEDULE OF RATES AND PAYMENTS
76 PROCEDURE FOR MEASUREMENT / BILLING OF WORK IN PROGRESS
77 LUMPSUMS IN TENDER
78 RUNNING ACCOUNT PAYMENTS TO BE REGARDED AS ADVANCES
80 PAYMENT OF CONTRACTOR’S BILL
81 CONCLUSION OF CONTRACT
82 MODE OF PAYMENT
83 COMPLETION CERTIFICATE
84 FINAL DECISION AND FINAL CERTIFICATE
85 CERTIFICATE FOR PAYMENTS AND EVIDENCE OF COMPLETION
VII TAXES / DUTIES / INSURANCE
86 TAXES & DUTIES
88 DAMAGE TO PROPERTY
VIII LABOUR LAWS AND OTHER REGULATIONS
90 IMPLEMENTATION OF APPRENTICES ACT,
91 CONTRACTOR TO INDEMNIFY THE OWNER
92a HEALTH AND SANITARY ARRANGEMENTS FOR WORKERS
92b MEDICAL FITNESS CERTIFACATION
93 SAFETY REGULATIONS
95 JURISDICTION
96 ORDER OF PRECEDENCE FOR WORKS/SERVICES CONTRACTS
97 LIMITATION OF LIABILITY
POLICE VERIFICATION OF CONTRACT STAFF AND TRANSPORT CREW AT
100 BUILDING AND OTHER CONSTRUCTION WORKERS CESS
IX MEMORANDUM OF AGREEMENT
PROFORMA OF BANK GUARANTEE
TAX RESIDENCY CERTIFICATE
ACKNOWLEDGEMENT
GENERAL CONDITIONS OF CONTRACT
DEFINITION OF TERMS
In the contract documents as herein defined where the context so admits, the following words and expressions will
have following meanings:
1) “The Owner/Company/BPCL” means the Bharat Petroleum Corporation Limited , incorporated in India
having its registered office at 4 & 6, Currimbhoy Road, Ballard Estate, Mumbai - 400 038 or their successors
2) “The Contractor” means the person or the persons, firm or Company whose tender has been accepted by the
Owner and includes the Contractor’s legal representative, his successor and permitted assigns.
3) The “Managing Director” shall mean the Chairman and Managing Director of the Bharat Petroleum
Corporation Limited or his successor in office designated by the Owner.
4) The “Engineer-in-Charge” shall mean the person designated as such by the Owner and shall include those
who are expressly authorized by the Owner to act for and on his behalf for operation of this contract.
5) The “Work” shall mean the works to be executed in accordance with the contract or part thereof as the case
may be and shall include extra, additional, altered or substituted works as required for purpose of the contract.
6) The “Permanent Work” means and includes works which will be incorporated in and form a part of the work
to be handed over to the Owner by the Contractor on completion of the contract.
7) The “Construction Equipment” means all appliances, Tools/Tackles and equipment of whatsoever nature for
the use in or for the execution, completion, operation or maintenance of the work unless intended to form part
of the Permanent work.
8) The “Site” means the areas on which the permanent works are to be executed or carried out and any other
places provided by the Owner for purpose of the contract.
9) The “Contract Document” means collectively the Tender Document. Designs. Drawings or Specifications,
agreed variations, if any, and such other document constituting the tender and acceptance thereof.
10) The “Consultant” means the consulting engineers Nominated/appointed by the Owner for this Project / job.
11) The “Sub-Contractor” means any person or firm or Company (other than the Contractor) to whom any part of
the work has been entrusted by the Contractor, with the written consent of the Engineer-in-Charge, and the
legal personal representatives, successors and permitted assigns of such person, firm or company.
12) The “Contract” shall mean the Agreement between the Owner and the Contractor for the execution of the
works including therein all contract documents.
13) The “Specification” shall mean the various technical specifications attached and referred to in the tender
documents. It shall also include the latest editions, including all addenda/corrigenda, of relevant Indian
Standard Specification, specifications of the other country published before entering into Contract.
14) The “Drawings” shall include maps, plans and tracings or prints thereof with any modifications approved in
writing by the Engineer-in-Charge and such other drawings as may, from time to time, furnished or approved
in writing by the Engineer-in-Charge.
15) The “Tender” means the tender submitted by the Contractor for acceptance by the Owner.
16) The “Alteration Order” means an order given in writing by the Engineer-in-Charge to effect additions to or
deletion from and alterations in the works.
17) The “Completion Certificate” shall mean the certificate to be issued by the Engineer-in-Charge to the
contractor when the works have been completed to his satisfaction.
18) The “Final Certificate” in relation to a work means the certificate issued by the Engineer-in-Charge after the
period of liability is over for releasing the retention money/PBG.
19) The “Period of Liability” in relation to a work means the specified period during which the Contractor stands
responsible for rectifying all defects that may appear in the works.
GENERAL INFORMATION ABOUT SITE
2.1 LOCATION OF SITE & ACCESSIBILITY:
The site location is described in the Special Conditions of Contract. The intending tenderer should inspect
the site and make himself familiar with site conditions and available facilities.
Entry into the BPCL areas is restricted depending on location/site. Only pass holders as also vehicles
with special permits are permitted in such restricted areas. Inside the premises access to various work
spots is also further regulated by permits issued for each area. Non-availability of access roads or permits
for entry of vehicles/equipment to any specific area shall in no case be the cause to condone any delay
in execution of works or be the cause for any claims or extra compensations.
2.2 SCOPE OF WORK
The scope of work is defined in the Special Conditions of Contract and specifications. The Contractor
shall provide all necessary materials, equipment’s / Tools and Tackles / Supervision / labor etc. for the
execution and maintenance of the work till completion unless otherwise mentioned in these tender
documents. All materials that go with the work shall be approved by Engineer-in-Charge prior to
procurement and use.
2.3 LAND FOR CONTRACTOR’S FIELD, GODOWN AND WORKSHOP:
The tenderer should visit the site and acquaint himself with site conditions, availability of water,
electricity, approach roads, construction materials as per specifications, shelter for his staff, etc. since
these are to be provided/arranged by the tenderer (unless otherwise specified) at his cost.
The owner will, at his discretion and convenience based on availability for the duration of the execution
of the work, make available, land for construction of contractor’s field office, go-downs, workshop and
fabrication yard required for the execution of the contract. The contractor shall at his own cost construct
all these temporary buildings and provide suitable water supply and sanitary arrangement approved by
the Engineer-in-Charge.
On completion of the works undertaken by the Contractor, he shall remove all temporary works/ shed
erected by him and have the site cleaned as directed by Engineer-in-Charge if the contractor shall fail to
comply with these requirements, the Engineer-in-charge may at the expenses of the Contractor remove
such surplus and rubbish material, dispose of the same as he deems fit and get the site cleared as
aforesaid; and the contractor shall forthwith pay the amount of all expenses so incurred and shall have
no claim in respect of any such surplus materials disposed of as aforesaid. But the Owner reserves the
right to ask the Contractor any time during the pendency of the contract to vacate the l and by giving
seven day notice on security reasons or on material interest otherwise.
2.4 SAFETY STANDARDS FOR TEMPORARY BUILDINGS
All temporary buildings, sheds, workshops, field stations etc. shall be constructed in conformation with
the safety and security regulations of the owner as regards location and type of structure.
GENERAL INSTRUCTION FOR THE TENDERER
3 SUBMISSION OF TENDER:
3.1 The quotation should be submitted only in the manner and the form prescribed in the Request for
Quotation (RFQ)/Tender enquiry.
3.2 Addenda/Corrigenda to this tender document if issued must be signed and submitted along with the
tender document. The tenderer should consider the Addenda/Corrigenda and should price the work
based on revised quantities when amendments for quantities are issued in addenda.
3.3 Tenders should always be placed in double sealed covers, super scribing Tender No Tender for
(name of job), Bharat Petroleum Corporation Limited , due for opening on
The full name, postal address and telegraphic address of the tenderer shall be written on the bottom left
hand corner of the sealed cover. (This will not be applicable in the case of e-tenders) Tenders received
in open condition (priced bid) are liable to be rejected.
3.4 Instructions for two part bidding
i) The bid should be submitted in two parts viz.
a. Techno-commercial bid.
ii) Techno-commercial bid shall have the following information/details
a. Technical deviation if any.
b. Commercial deviation if any like extra taxes, duties etc.
c. Copy of price bid with prices blanked off.
d. Any other relevant information.
iii) Price Bid shall have only prices as per schedule of Rates.
iv) Techno-commercial bid and price bid shall be enclosed in two separate envelopes with the subject job,
type of bid, bidders name super-scribed on top. Both these envelopes shall be sealed in a common
envelope and submitted as specified above and in covering letter. (This will not be applicable in the
case of e-tenders)
4.1 The tenders, as submitted shall include all documents/details asked for by BPCL in the RFQ/Tender
4.2 All pages to be initialed:
Wherever signed tender documents are submitted, all signatures in the documents shall be dated, as well
as all the pages of the documents shall be initialed at the lower right hand corner and signed wherever
required in the tender papers by the tenderer or by a person holding power of attorney authorizing him to
sign on behalf of the tenderer before submission of tender. Tenders without signatures as stated above
are liable to be rejected.
4.3 Rates to be in Figures and Words:
The tenderer should quote the rates in English both in figures as well as in words. Offers received without
the rates in figures and in words are liable for rejection. In case of discrepancy exists between the rate
quoted in figures and in words, the rates quoted in words will prevail.
4.4 Corrections and Erasures:
All corrections and alteration in the entries of tender papers will be signed in full by the tenderer with date.
No erasures or over-writings are permissible.
In case of priced bids containing overwriting/cuttings/erasures in the quoted rates and in case these are not
attested by the signatory of the bid, such priced bids are liable to be rejected without giving any further
4.5 Signature of Tenderer:
The tender shall contain the name, residence and place of business of person or persons making the
tender and shall be signed by the tenderer with his usual signature with company stamp. Partnership
firms shall furnish the full names of all partners in the tender. It should be signed in the partnership name
by all the partners or by duly authorized representative followed by the name and designation of the
person signing with company stamp.
Tender by Company or Corporation registered under the relevant companies act, shall be signed by the
authorized representative and a power of attorney in that behalf shall accompany the tender. Transfer of
tender documents issued to one intending tenderer to another is not permissible.
5 PURCHASE PREFERENCE:
Owner reserves its right to allow Public Sector Enterprises (Central/State), purchase preference as
admissible/applicable from time to time under the existing Govt. policy. Purchase preference to a PSE
shall be decided based on the price quoted by PSE as compared to L1 Vendor at the time of evaluation of
Owner reserves its right to allow Micro and Small Enterprises (MSEs), MSEs owned by Women
Entrepreneurs and MSEs owned by Scheduled Caste (SC) or the Scheduled tribe (ST) entrepreneurs,
purchase preference as admissible/applicable from time to time under the existing Govt. policy. Purchase
preference to a MSE, a MSE owned by women entrepreneurs and a MSE owned by SC/ST entrepreneurs
shall be decided based on the price quoted by the said MSEs as compared to L1 Vendor at the time of
evaluation of the price bid.
6 (a) EARNEST MONEY:
The tenderer must submit/ deposit earnest money, if specified in the RFQ/Tender enquiry, failing which
the tender is liable to be rejected. Earnest Money Deposit shall be submitted in the form of crossed Demand
Draft in favor of “Bharat Petroleum Corporation Ltd.” / Electronic Funds Transfer to BPCL Bank Account
/ Bank Guarantee executed by any Scheduled Bank approved by Reserve Bank of India (as per Proforma
provided in Annexure). Earnest Money Deposit (EMD) shall be valid for a period of 6 (Six) months from
the due date of opening of Techno-commercial Bids and shall be submitted from any Indian Scheduled
Commercial Bank / Indian Branch of Foreign Bank. EMD submitted by foreign vendors shall be in USD /
In case of limited tender, Earnest Money deposit (EMD) is not applicable for registered contractors of
NOTE: Exemption of Bidding Document fee and EMD will be applicable for Micro and Small Enterprises
(MSEs) registered with District Industries Centre’s (DIC) or Khadi and Village Industries Commission or
Khadi and Village Industries Board or Coir Board or National Small Industries Corporation (NSIC) or
Directorate of Handicraft and Handloom or MSEs having Udyog Aadhaar Memorandum or any other body
specified by Ministry of Micro, Small and Medium Enterprises. Such bidder shall submit Self attested copy
of the certificate, valid up to validity of the offer, indicating that their registration includes the items/works
under tender. The registration certificate should remain valid during the period of the contract that may be
entered into such successful bidder. Such tenderers should ensure validity of the Registration Certificate
for the purpose.
NOTE: No interest shall be paid by the Owner on the earnest money deposit by the tenderer. The earnest
money of the unsuccessful tenderer will be refunded after the completion of BQC evaluation / Technical
Evaluation / Priced Bid Evaluation as applicable.
(b) CONVERSION OF EMD TO SECURITY DEPOSIT:
The earnest money deposit (EMD) of the contractor whose tender may be accepted, if paid in forms other
than Bank Guarantee, can be converted to security deposit for due performance of the contract if the
contractor so desires. The “performance security deposit/retention money” vide clause 18 shall also be
applicable limiting to a maximum of 10% of the contract value.
7 (a) BID VALIDITY:
Tender submitted by tenderers shall remain valid for acceptance for a period of four months from the
date of opening of the tender (Technical Bid in the case of two bid). The tenderer shall not be entitled
during the said period of four months, without the consent in writing of the Owner, to revoke, or cancel
his tender or vary the tender given or any term thereof. In case of tenderer revoking or canceling his
tender, varying any terms in regard thereof without the consent of Owner in writing, appropriate penal
action will be taken by BPCL as deemed fit including putting the tenderer/contractor on ‘Holiday
listing’/’Delisting’ barring the tenderer/contractor from participating in future tenders for an appropriate
period from the date of revocation/cancellation/varying the terms. Further in the case of contractors who
are not registered with BPCL, the earnest money deposited by him will be forfeited. Once the quotation
is accepted the rates quoted shall be firm till the entire work is completed.
(b) LANGUAGE OF BID:
The Bid, all correspondence and documents relating to the bid, between Bidder and BPCL, shall be written
in English language only. Any supporting document furnished by Bidder may be written in other language
provided that this literature is accompanied by an authenticated English translation in which case, for
purpose of interpretation of the Bid, the English translation shall govern.
8 ADDENDA / CORRIGENDA:
Addenda/ Corrigenda to the tender documents may be issued prior to the date of opening of the tenders
to clarify documents or to effect modification in the design or tender terms. All addenda/corrigenda
issued shall become part of tender Document.
9 RIGHT OF OWNER TO ACCEPT OR REJECT TENDER:
9.1 The right to accept the tender will rest with the Owner. The Owner, however, does not bind itself to accept
the lowest tender, and reserves to itself the authority to reject any or all the tenders received without
assigning any reason whatsoever.
9.2 The whole work may be split up between two or more contractors or accepted in part and not entirely if
considered expedient.
9.3 Tenders in which any of the particulars and prescribed information’s are missing or are incomplete in any
respect and/or the prescribed conditions are not fulfilled are liable to be rejected.
9.4 Canvassing in connection with tenders is strictly prohibited and tenders submitted by the tenderer who
resort to canvassing will be liable to rejection.
9.5 Tender containing uncalled remarks or any additional conditions are liable to be rejected.
10 (a) INTEGRITY PACT (IP):
Vendors are requested to sign & return our pre-signed IP document, if applicable. This document is
essential & binding. Vendor's failure to return the IP document duly signed along with Bid Document
may result in the bid not being considered for further evaluation.
(b) HOLIDAY LISTING:
The vendors / contractors are expected to adopt the ethics of highest standards and a very
high degree of integrity, safety and quality consciousness, commitment and sincerity towards
the work undertaken and dealing with BPCL in such matters. Also, while participating in the
tender and performing the contracts, Contractors are required to meet certain performance
criteria and adherence to the terms and conditions of the tender / contract. BPCL shall have
the right to remove from the list of approved suppliers / contractors or to ban business
dealings, if any agency has been found to have committed misconduct or fraud or poor
performance or anything unethical not expected from a reputed agency. The guidelines and
procedures for Holiday Listing as adopted by BPCL and available separately in BPCL website
shall be applicable in the context of all tenders floated and consequently, all Orders /
Contracts / Purchase Orders placed, by BPCL. It can be accessed. Using the following link:
http://bharatpetroleum.in/pdf/holidaylistingpolicyfinal.pdf.
(c) FOREIGN BIDDERS:
It is mandatory for the foreign bidder to furnish the documents for the compliance to requirement of PAN
No. , Tax Residency Certificate and Form No.10F (applicable for foreign bidder in case of services in
India is required as per scope of bidding document) as per Income Tax Act in case his receipts are subject
to tax deduction at source in India:
PAN as per the Indian Income Tax requirements shall be submitted, failing which the
Supplier/Contractor/Consultant shall be responsible for any additional tax deduction at source as per the
provisions of the Indian Income Tax Act/Rules and the same shall be deducted from the payment made to
supplier/contractor/consultant.
(ii) Tax Residency Certificate (TRC)
TRC containing prescribed particulars as per the Annexure from the Government of foreign country in
order to claim the benefits of DTAA as per the Indian Income Tax requirements shall be submitted, failing
which the relief under DTAA will not be available and consequently the actual rate of withholding tax
will be applicable and deducted from the payment made to supplier/contractor/consultant (i.e., non-
resident taxpayer). The TRC shall be duly verified by the Government of the country of which the assesse
claims to be a resident for the purposes of tax.
In additional to TRC, in order to claim the benefits of DTAA, bidder shall also submit additional
information in form no. 10F as per Annexure. Form 10F has to be signed & verified by the assesse himself.
The above shall be furnished before release of any payment or within one month of the release of Order,
whichever is earlier. In case of failure to submit the above information, any additional tax liability on
Owner, will be deducted from the payment due to the contractor.
11 COLLECTION OF DATA TENDERER’S RESPONSIBILITY & TIME SCHEDULE:
The tenderer shall visit the site and acquaint himself fully of the site and no claims whatsoever will be
entertained on the plea of ignorance or difficulties involved in execution of work or carriage of materials.
The time period allowed for carrying out the job shall be as shown in tender document. Request for revision
for time schedule after tenders are opened will not be received for consideration.
12 RETIRED GOVERNMENTS OR COMPANY OFFICER:
No Engineer of Gazettes rank or other Gazettes Officer, employed in Engineering or Administrative
duties in an Engineering Department of the States/Central Government or of the Owner is allowed to
work as a Contractor for a period of two years after his retirement from Government service or from the
employment of the Owner without the previous permission of the Owner. The contract, if awarded, is
liable to be cancelled if either the contractor or any of his employees is found at any time to be such a
person, who had not obtained the permission of the State/ Central Government, or of the Owner as
aforesaid before submission of tender, or engagement in the Contractor’s service as the case may be.
13 SIGNING OF THE CONTRACT:
The successful tenderer shall be required to execute an agreement in the proforma attached with tender
enquiry within a period of one month of the receipt by him of the notification of acceptance of tender.
The payment will not be processed till the time the agreement is executed.
14 (a) FIELD MANAGEMENT:
The field management will be the responsibility of the Engineer-in-Charge, who will be nominated by the
Owner. The Engineer-in-Charge may also authorize his representatives to perform his duties and
Coordination of Work - The Engineer-in-Charge shall coordinate the work of various agencies engaged
at site to ensure minimum disruption of work carried out by different agencies. It shall be the
responsibility of the contractor to plan and execute strictly in accordance with the site instructions to
avoid hindrance to the works being executed by other agencies.
14 (b) CONSULTANCY CONTRACTS:
This General Conditions of Contract (GCC) will be binding for Consultancy jobs only to the extent of its
applicability to the context of consultancy jobs.
INTERPRETATION OF CONTRACT DOCUMENTS
15 INTERPRETATION OF CONTRACT DOCUMENT:
15.1 Except if and to the extent otherwise provided by the Contract, the provisions of the General Conditions
of Contract and special conditions shall prevail over those of any other documents forming part of the
contract. Several documents forming the contract are to be taken as mutually explanatory. Should there
be any discrepancy, inconsistency, error or omission in the contract or any of the matter may be referred
to Engineer-in-Charge, who shall give his decisions and issue to the Contractor instructions directing in
what manner the work is to be carried out. The decision of the Engineer-in-Charge shall be final and
conclusive and the contractor shall carry out work in accordance with this decision.
15.2 Works shown upon the drawing but not mentioned in the specifications or described in the specification
without being shown on the drawings shall nevertheless be held to be included in the same manner as if
they had been specifically shown upon the drawings and described in the specifications.
15.3 Headings and marginal notes to the clauses of these General Conditions of Contract or to specifications or to
any other tender document are solely for the purpose of giving a concise indication and not a summary of the content thereof, and
they shall never be deemed to be part thereof or be used in the interpretation or construction thereof of the Contract.
16.4 Singular and Plural:
In these contract documents unless otherwise stated specifically, the singular shall include the plural and
vice-versa wherever the context so requires. Words indicating persons shall include relevant
incorporated companies/ registered as associations/ body of individual/ firm or partnership
16 SPECIAL CONDITIONS OF CONTRACT:
16.1 Special Conditions of contract shall be read in conjunction with the General Conditions of Contracts,
specification of work, Drawings and any other documents forming part of this contract wherever the
context so requires.
16.2 Notwithstanding the sub-division of the documents into these separate sections and volumes every part
of each shall be deemed to be supplementary to and complementary of every other part and shall be read
with and into the contract so far as it may be practicable to do so.
16.3 Where any portion of the General Conditions of Contract is repugnant to or at variance with any
provisions of the Special Conditions of Contract then, unless a different intention appears the provisions
of the Special Conditions of Contract shall be deemed to over-ride the provision of the General
Conditions of Contract and shall to the extent of such repugnance or variations, prevail.
16.4 Wherever it is mentioned in the specifications that the Contractor shall perform certain work or provide
certain facilities, it is understood that the contractor shall do so at his own cost.
16.5 The materials, designs and workmanship shall satisfy the relevant Indian Standards, the Job
specifications contained herein and codes referred to. Where the job specifications stipulate requirements
in addition to those contained in the standard codes and specifications, these additional requirements
shall also be satisfied.
17 CONTRACTOR TO OBTAIN HIS OWN INFORMATION:
The contractor in fixing rate shall for all purposes whatsoever be deemed to have himself independently
obtained all necessary information for the purpose of preparing his tender. The contractor shall be
deemed to have examined the Contract Documents, to have generally obtained his own information in
all matters whatsoever that might affect the carrying out the works at the scheduled rates and to have
satisfied himself to the sufficiency to his tender. Any error description of quantity or omission there from
shall not vitiate the contract or release the Contractor from executing the work comprised in the contract
according to drawing and specifications at the scheduled rates. He is deemed to have known the scope,
nature and magnitude of the works and the requirements of materials and labour involved etc. and as to
what all works he has to complete in accordance with the contract documents whatever be the defects,
omissions or errors that may be found in the Contract Documents. The Contractor shall be deemed to
have visited surrounding to have satisfied himself to the nature of all existing structures, if any, and also
as to the nature and the conditions of the Railways, roads, bridges and culverts means of transport and
communications, whether by land, water or air, and as to possible interruptions thereto and the access to
and regress from the site, to have made enquiries, examined and satisfied himself as to the sites for
obtaining sand, stones, bricks and other materials, the sites for disposal of surplus materials the available
accommodation as to whatever required, depots and such other building as may be necessary for
executing and completing the works, to have made local independent enquiries as to the sub-soil water
and variations thereof, storms, prevailing winds, climate conditions and all other similar matters
affecting these works. He is deemed to have acquainted himself as to his liability for payment of
Government taxes, customs duty and other charges.
Any neglect or failure on the part of the Contractor in obtaining necessary and reliable information upon
the foregoing or any other matters affecting the contract shall not relieve him from any risk or liabilities
or the entire responsibility from completion of the works at the scheduled rates and time in strict
accordance with the contract documents.
No verbal agreement or inference from conversation with any officer or employee of the owner either
before or after the execution of the contract agreement shall in any way affect or modify any of the terms
or obligations herein contained.
18 PERFORMANCE SECURITY DEPOSIT/RETENTION MONEY:
18.1 To ensure performance of the contract and due discharge of the contractual obligations, the successful
contractor will have to provide security deposit of 10% of the basic value of contract unless otherwise
specified in the Special Conditions of Contract. Amount received/retained towards this clause will be
considered as security deposit.
This Security deposit may be furnished in the form of an Account payee Demand Draft payable to BPCL
or Bank Guarantee in the prescribed format. The contractor shall have the option to adjust any Earnest
Money Deposit- (EMD) if paid by demand draft towards security deposit if he so desires or otherwise if
submitted by way of bank guarantee the validity of the same to be extended suitably as advised by BPCL.
In the case of security deposit submitted in the form of Bank guarantee, the Bank Guarantee shall be
valid and remain in force till the contractual completion period (expiry of the defect liability period-
refer clause-74, if applicable) and with a claim period of six months thereafter. The Bank Guarantee
shall be in the form prescribed.
In case the successful contractor is not furnishing the performance security deposit as referred above on
award of the job, the same shall be deducted from each running account bills at the rate of 10% of bill
value till overall security deposit of 10% as mentioned above is collected.
The security deposit will be retained till the successful completion of the work and thereafter till the
expiry of the defect liability period (refer clause-74), if applicable. This retention money/Bank guarantee
held shall be released after the expiry of the defect liability period provided that any defects appearing
during that period are corrected by the contractor and subject to Clause 18.2 below.
In the case of value/rate/quantity contracts, the security deposit shall be based on individual release orders
issued. In case of LSTK (Lump Sum Turnkey Contracts) / EPC: PBG @ 10% within 15 days of
notification of award. In case of Annual Rate Contracts (ARCs): Submission of PBG @ 10% of Total
Contract Value (TCV) or submission of initial security deposit @ 2.5% of TCV within 15 days of
notification of award. In cases where only 2.5% of TCV has been submitted, 7.5% of individual release
order shall be subsequently deducted from RA bills.
Vendors/contractors shall be asked to submit the SD within 15 days from the date of notification of award
and in the event of delay in submission of SD, the contract can be terminated. However, if termination of
contract is not in the interest of the work/ BPCL, an additional time up to 30 days can be allowed for
submission of SD depending on merits of each case, beyond which the contract may be terminated with
subsequent actions following termination as per tender/procedure.
18.2 If the contractor/ sub-contractor or their employees shall break, deface or destroy any property belonging
to the Owner or other agency during the execution of the contract, the same shall be made good by the
Contractor at his own expenses and in default thereof, the Engineer-in-Charge may cause the same to be made good
by other agencies and recover expenses from the contractor (for which the certificate of the Engineer-in-Charge shall be final).
These expenses can be recovered from the security deposit/retention money if recovery from other sources is not possible.
18.3 All compensation or other sums of money payable by the contractor to the Owner under terms of this contract may be deducted
from his security deposit/retention money or from any sums which may be or may become due to the contractor by the Owner on
any account whatsoever and in the event of his security deposit/retention money being reduced by reasons of any such deductions.
The contractor shall within ten days thereafter make good any sum or sums, which may have been deducted from his security
Deposit/retention money. No interest shall be payable by the Owner from sum deposited as security deposit/retention money.
18.4 The security deposit shall be held by the Owner, as security for the due performance of the Contractor’s obligations under the
contract, provided that nothing herein stated shall make it incumbent upon the Owner to utilize the security deposit/retention
money in preference to any other remedy which the Owner may have, nor shall be construed as confining the claims of the Owner
against the contractor to the quantum of the Security Deposit/retention money.
18.5 The Bank guarantee if submitted shall be from any Indian scheduled bank or an international bank of
repute having a branch in India or a corresponding banking relationship with an Indian scheduled bank.
The security deposit/retention money shall be in Indian Rupee in the case of domestic bidders and in US
Dollars/EUROS in the case of foreign bidders.
18.6 Process for submitting Bank Guarantee / PBG under SFMS (Structured Financial Messaging System) mode
Contractors shall insist their Bank on issuance of SFMS Bank Guarantee for faster payments. Contractors
BPCL Bank Account No. & IFSC Code (Details given below) to their Bank as beneficiary at the time of
application for Bank Guarantee in favor of BPCL. Issuing Bank shall issue the Bank Guarantee & send
SFMS message to BPCL Bank confirming the authenticity of Bank Guarantee who in turn shall send the
confirmation to BPCL.
Name of Bank: State Bank of India
Branch CAG Branch, Mumbai
IFSC Code: SBIN0009995
SFMS BG will help in faster verification of BGs and prompt release of payments to contractors.
19 TIME OF PERFORMANCE:
19.1 The work covered by this contract shall be commenced as detailed in the purchase order or as per the
instructions of the Engineer in charge and be completed in stages on or before the dates as mentioned in
the time schedule of completion of work. The contractor should bear in mind that time is the essence of
this agreement unless such time be extended pursuant to the provision of clause No. 21. Request for
revision of Completion time after tenders are opened will not receive consideration.
19.2 Time Schedule of Completion: The general time schedule of completion is given in the tender document.
Contractor should prepare a detailed monthly and weekly execution programme, jointly with the
Engineer-in-Charge within two weeks of receipt of Letter of Intent or acceptance of tender. The work
shall be executed strictly as per the time schedule given in this document. The period of completion
given includes the time required for testing, rectifications, if any, retesting and completion in all respects
to the entire satisfaction of the Engineer-in-Charge.
20 FORCE MAJEURE
Circumstances leading to force majeure
(a) Act of terrorism;
(b) Riot, war, invasion, act of foreign enemies, hostilities (whether war be declared or not), civil
war, rebellion, revolution, insurrection of military or usurped power;
(c) Ionizing radiation or contamination, radio activity from any nuclear fuel or from any nuclear
waste from the combustion of nuclear fuel, radioactive toxic explosive or other hazardous
properties of any explosive assembly or nuclear component;
(d) epidemics, earthquakes, flood, fire, hurricanes, typhoons or other physical natural disaster, but
excluding weather conditions regardless of severity; and
(e) freight embargoes, strikes at national or state-wide level or industrial disputes at a national or
state-wide level in any country where Works are performed, and which affect an essential
portion of the Works but excluding any industrial dispute which is specific to the performance
of the Works or the Contract.
For the avoidance of doubt, inclement weather, third party breach, delay in supply of materials
(other than due to a nationwide transporters’ strike) or commercial hardship shall not constitute a
Force Majeure event.
• Notification of Force Majeure
Contractor shall notify within [10(ten)] days of becoming aware of or the date it ought to have
become aware of the occurrence of an event of Force Majeure giving full particulars of the event
of Force Majeure and the reasons for the event of Force Majeure preventing the Affected Party
from, or delaying the Affected Party in performing its obligations under the Contract.
• Right of either party to terminate
If an event of Force Majeure occurs and its effect continues for a period of 180 (one hundred
eighty days) or more in a continuous period of 365 (three hundred sixty five) days after notice
has been given under this clause, either Party may terminate the Contract by issuing a written
notice of 30 (thirty) days to the other Party.
• Payment in case of termination due to Force Majeure
The Contract Price attributable to the Works performed as at the date of the commencement of
the relevant event of Force Majeure.
The Contractor has no entitlement and Owner has no liability for:
a) Any costs, losses, expenses, damages or the payment of any part of the
Contract Price during an event of Force Majeure; and
b) Any delay costs in any way incurred by the Contractor due to an event of
Force Majeure. Time extension for such cases will be worked out
21 EXTENSION OF TIME:
If the contractor shall desire an extension of the time for completion of the work on the grounds
of his having been unavoidably hindered in its execution or on any other grounds, he shall
apply in writing to the Engineer-in-Charge within two weeks of the date of hindrance on
account of which he desires such extension as aforesaid, and the Engineer-in-Charge shall if in
his opinion (which shall be final), reasonable grounds have been shown thereof, authorize such
extension of time as may in his opinion be necessary or proper.
In the event of extension of Time of the contract, if granted, the contractor shall be required to
suitably extend the period of Bank Guarantee if submitted, towards security Deposit/retention
money suitably.
22. LIQUIDATED DAMAGES FOR DELAY:
22.1 Time is the essence of the contract. In case the contractor fails to complete the whole work
within the stipulated period, he shall be liable to pay liquidated damages of 0.5% of the basic
value of contract per week and or part thereof of the delay subject to a maximum of 5% of the
value of the contract. The parties agree that this is a genuine pre- estimate of the loss/damage
which will be suffered by the owner on account of delay on the part of the contractor and the
said amount will be payable on demand without there being any proof of the actual loss or
damages having been caused by such delay/breach. The owner shall be at liberty to adjust or
deduct the said amount of liquidated damages from any amount due to the contractor including
Security Deposit. In case where the concluded contract value is different from the original
contract value due to the change orders/variation in executed quantities/extension of time, etc.,
the concluded contract value should be considered for recovery of Liquidated Damages for late
delivery/delayed completion.
22.2 The owner shall be at liberty to deduct or retain from any amount payable to the contractor
periodically, the proportionate or full amount of liquidated damages as the case may be for the
delay periodically caused by the contractor.
23 SUM PAYABLE BY WAY OF COMPENSATION TO BE CONSIDERED AS
REASONABLE COMPENSATION WITHOUT REFERENCE TO ACTUAL LOSS:
All sums payable by way of compensation under any of the conditions shall be considered as
reasonable compensation without reference to the actual loss or damage, which shall have been
sustained by the Owner.
24 TERMINATION/OFFLOADING:
24.1 The contractor fully understands that timely completion of the work as per the schedule is of
paramount necessity as otherwise it would lead to adversely affecting the schedules of other
works/project with resultant financial and other losses to the Company/owner. In view of this,
the contractor unconditionally agrees and binds himself to be liable for all the consequences
for non-completion of the work within the stipulated time.
24.2 In case a situation is brought about by the contractor warranting termination/off-loading of
the whole or any part of the work for any reason whatsoever, the Company/owner shall have
the liberty and right to entrust/engage/award the work so terminated/off loaded at the risk and
cost of the contractor to any other agency/contractor by adopting any mode of inviting
tenders, i.e. open/limited/single party/negotiation basis etc. in order to ensure completion of
the work as per the schedule or at the quickest possible time.
25. FORFEITURE OF SECURITY DEPOSIT:
Whenever any claim against the Contractor for the payment of a sum of money arises out of or
under the contract, the Owner shall be entitled to recover such sum by appropriating in part or
whole, security deposit of the contractor, forming whole or part of such security being
insufficient or if no security has been taken from the Contractor then the balance or the total
sum recoverable, as the case may be, shall be deducted from any sum then due or which at any
time thereafter may become due to the Contractor. The contractor shall pay to the owner on
demand any balance remaining due.
26 ACTION WHEN WHOLE OF SECURITY DEPOSIT IS FORFEITED:
In any case in which, under any clause or clauses of this contract, the contractor shall have
forfeited the whole of his security deposit (whether paid in one sum or deducted by installment)
or have committed a breach of any of the terms contained in this contract, the owner shall have
power to adopt any of the following courses as he may deem best suited to his interest:
a) To rescind the contract (of which rescission notice in writing to the contractor under the hand
of the owner shall be conclusive evidence) in which case the security deposit of the contractor
shall stand forfeited and be absolutely at the disposal of the Owner.
b) To employ labor paid by the owner and to supply materials to carry out the work any part of
the work, debiting contractor with the labor cost of tools and plants and equipment charges, the
cost of the materials for which a certificate of the Engineer-in-Charge shall be final and
conclusive against the Contractor and 10% of costs as above to cover all departmental charges
and crediting him with the value of the work done in all respects in the manner and at the same
rates as if it had been carried out by the Contractor under the term of his contract. The certificate
of Engineer-in-Charge as to the value of the work done shall be Final and conclusive against
the contractor.
c) To measure up the work of the contractor and to take such part thereof as shall be unexecuted
out of his hand to give it to another contractor to complete in which case any expenses which
may be incurred in excess of the sum which would have been paid to the original contractor, if
the whole work had been executed by him (of the amount of which excess, the certificate in
writing of the Engineer-in-Charge shall be final and conclusive) shall be borne and paid by the
original contractor and may be deducted from any money due to him by the Owner under the
contract or otherwise or from his security deposit or from the proceeds of sale thereof, of a
sufficient part thereof.
In the event of any of the above course being adopted by the Owner, the contractor shall have
no claim to compensation for any loss sustained by him by reason of his having purchased or
procured any materials or entered into any agreements or made any advances on account of or
with a view to the execution of the work of the performance of the contract. In case the
Contractor shall not be entitled to recover or be paid any sum for any work actually performed
under this contract unless the Engineer-in- Charge will certify in writing the performance of
such work and the value payable in respect thereof and he shall only be entitled to be paid the
value so certified.
27 CONTRACTOR REMAINS LIABLE TO PAY COMPENSATION IF ACTION NOT TAKEN
UNDER CLAUSE 26:
In any case in which any of the powers conferred upon the owner by clause 26 thereof shall have become
exercisable and the same had not been exercised, the non-exercise thereof shall not constitute a waiver
of any of the conditions hereof and such powers shall notwithstanding be exercised in the event of any
further case of default by the contractor for which any clause of hereof he is declared liable to pay
compensation amounting to the whole of his security deposit and the liability of the contractor for past
and future compensation shall remain unaffected. In the event of the Owner putting in force the power
under sub-clause (a), (b) or (c) vested in him under the proceeding clause he may, if he so desires takes
possession of all or any tools and plants materials and stores in or upon the works or the site thereof
belonging to the contractor or procured by him and intended to be used for the execution of the work or
any part thereof paying or allowing for the same in account at the contract rates or in case of these not
being applicable at current market rates to be certified by the Engineer-in-Charge whose certificate
thereof shall be final otherwise the Engineer-in-Charge may give notice in writing to the contractor or
his clerk of the works, supervisor or other authorized agent, requiring him to remove such tools, plant,
materials or stores from the premises (within a time to be specified in such notice) and in the event of
the contractor failing to comply with any such requisition, the Engineer-in-Charge may remove them at
the contractors expense or sell them by auction or private sale on account of the contractor and at his
risk in, all respects without any further notice as to the date, time or place of sale and the certificate of
the Engineer-in-Charge as to the expense of any such removal and the amount of proceeds and any
expenses of any such sale shall be final and conclusive against the contractor.
28 NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORK:
If at any time from the commencement of the work the owner shall for any reasons whatsoever, not
require the whole or part thereof as specified in the tender to be carried out, the Engineer-in-Charge shall
give notice in writing of the fact to the contractor, who shall have no claim to any payment or
compensation whatsoever on account of any profit or advantage which he might have derived from the
execution of the work in full, but which he did not derive in consequence of the full amount of the work
not having been carried out, neither shall he have any claim for compensation by reason of any alterations
having been made in the original specifications, drawings, designs and instructions which shall involve
any curtailment of the work as originally contemplated.
29 CHANGES IN CONSTITUTION:
Where the contractor is a partnership firm, the prior approval, in writing, of the Owner shall be obtained
before any change is made in the constitution of the firm, where the contractor is an individual or a Hindu
undivided family business concern, such approval as aforesaid shall likewise be obtained before sub-
contractor enters into any agreement with other parties, where under the reconstituted firm would have
the right to carry out the work hereby undertaken by the contractor. In either case if prior approval as
aforesaid is not obtained, the contract shall be deemed to have been allotted in contravention of clauses
35 hereof and the same action may be taken and, the same consequence shall ensure as provided in the
30 IF THE CONTRACTOR DIES:
Without prejudice to any of the rights or remedies under his contract, if the contractor dies, the
Owner shall have the option of terminating the contract without compensation to the contractor.
31 EMPLOYEES OF THE OWNER NOT INDIVIDUALLY LIABLE:
No director or official or employee of the Owner shall in any way be personally bound or liable
for the acts or obligations of the Owner under the contract or answerable for any default or
omission in the observance or performance of any of the acts, matters or things which are herein
32 OWNER NOT BOUND BY PERSONAL REPRESENTATIONS:
The contractor shall not be entitled to any increase on the item rates of the contract or any other
right or claim whatsoever by reason of representation, explanation or statement or alleged
representation, promise or guarantees given or alleged to have been given to him by any person.
33 CONTRACTOR’S OFFICE AT SITE:
The contractor shall provide and maintain an office at the site, if space provided by the owner,
for the accommodation of his agent and staff and such office shall be open at all reasonable
hours to receive instruction, notices, or other communications.
34 CONTRACTOR’S SUBORDINATE STAFF AND THEIR CONDUCTS:
34.1 The contractor, on or after award of the work shall name and depute a qualified personnel
having sufficient
Experience in carrying out work of similar nature to whom the equipment’s materials, if any,
shall be issued and instructions for works given. The contractor shall also provide to the
satisfaction of the Engineer-in Charge sufficient and qualified staff to supervise the execution
of the-works, competent sub-agents, supervisor and leading hands including those specially
qualified by previous experience to supervise the type of works comprised in the contract in
such manner as will ensure work of the best quality, expeditious working. Whenever in the
opinion of the Engineer-in-Charge, additional properly qualified supervision staff is
considered necessary, they shall be employed by the contractor without additional charges on
account thereof. The Contractor shall ensure to the satisfaction of the Engineer-in- Charge that
sub-contractors, if any shall provide competent and efficient supervision over the work
entrusted to them.
34.2 If and whenever any of the Contractor’s or sub-contractor’s agents, sub-agents, assistants
supervisor or other employees shall in the opinion of Engineer-in-Charge be guilty of any
misconduct or be incompetent or insufficiently qualified or negligent in the performance of
their duties or that in the opinion of the owner or Engineer-in-Charge, it is undesirable for
administrative or any other reason for such person or persons to be employed in the works, the
contractor, if so directed by the Engineer-in- Charge, shall at once remove such person or
persons from employment thereon. Any person or persons so removed from the works shall
not again be employed in connection with the works without the written permission of the
Engineer-in Charge. Any person so removed from the works shall be immediately replaced at
the expense of the contractor by a qualified and competent substitute. Should the contractor
be requested to repatriate any person removed from the works he shall do so and shall bear all
costs in connection here with.
34.3 The contractor shall be responsible for the proper behavior of all the staff, supervisor,
workmen and others and shall exercise a proper degree of control over them and in particular,
and without prejudice to the said generality, the contractor shall be bound to prohibit and
prevent any employees from trespassing or acting in any way detrimental or prejudicial to the
interest of the community or of the properties or occupiers of land and properties in the
neighborhood and in the event of such employee so trespassing, the contractor shall be
responsible therefore and relieve the Owner of all consequent claims or actions for damages
or injury or any other grounds whatsoever. The decision of the Engineer-in-Charge upon any
matter arising under this clause shall be final. Contractor shall ensure that none of their
employees are ever engaged in any anti-national activities.
34.4 All contractor’s personnel entering upon the Owner’s premises shall be properly identified by
badges issued by owner which must be worn all times on Owner’s premises.
35 SUB-LETTING OF WORK:
Subletting of contracts shall not be generally permitted. However owner may permit subletting
of work on specific cases subject to the following:-
i) No part of the contract nor any share of interest there shall in any manner or degree be
transferred assigned sublet by the contractor directly or indirectly to any firm or
corporation whosoever except as provided for in the succeeding sub-clause, without the
consent in writing of the Owner.
ii) Sub-Contractors for Temporary Works Etc.:- The Owner may give written consent to sub-
contract for execution of any part of the works at the site, being entered into by the
contractor provided each individual sub-contract is submitted to the Engineer-in-Charge
before being entered into and is approved by him.
iii) List of Sub-Contractors to be supplied: - At the commencement of every month the
contractor shall furnish to the Engineer-in-Charge list of all sub-contractors or firms
engaged by the contractor and working at the site during the previous month with
particulars of the general nature of the sub-contract or works.
iv) Contractor’s Liability Not Limited By Sub-Contractors:- Notwithstanding any sub-letting
with such approval as aforesaid and notwithstanding that the Engineer-in-Charge shall
have received copies of any sub-contracts, the contractor shall be and shall remain solely
responsible for the quality and proper and expeditious execution of the works and the
performance of all the conditions of the contract in all respects as if such sub-letting or
subcontracting had not taken place and as if such work had been done directly by the
v) Owner may Terminate Sub-Contracts:- If any sub-contractor engaged upon the works at
the site executes any work which in the opinion of the Engineer-in-Charge is not in
accordance with the Contract documents, the owner may by written notice to the contractor
request him to terminate such sub-contract and the contractor upon the receipt of such
notice shall terminate such sub contract and the latter shall forthwith leave the works,
failing which the owner shall have right to remove such sub-contractors from the Site. vi)
No Remedy For Action Taken Under This Clause:- No action taken by the owner under
the clause shall relieves the contractor of any of his liabilities under the contract or give
rise to any right to compensation, extension of time or otherwise failing which, the owner
shall have right to remove such sub-contractors from the Site.
36 POWER OF ENTRY:
If the contractor shall not commence the work in the manner previously described in the contract
document or if he shall, at any time in the opinion of the Engineer-in-Charge.
i. Fail to carry out the works in conformity with the contract documents, or
ii. Fail to carry out the works in accordance with the time schedule, or
iii. Substantially suspend work or the works for a period of Fourteen days without
authority from the Engineer-in-Charge, or
iv. Fail to carryout and execute the works to the satisfactions of the Engineer-in-
v. Fail to supply sufficient or suitable constructional equipment’s, temporary works, labor
materials or things, or
vi. Commit or suffer or permit any other breach of any of the provisions of the contract on his
part to be performed or observed or persist in any of the above mentioned breaches of the
contract for the fourteen days, after notice in writing shall have been given to the Contractor
by the Engineer-in-Charge requiring such breach to be remedied, or
vii. Abandon the works, or
viii. During the continuance of the contract, become bankrupt, make any arrangement or
composition with his creditors, or permit any execution to be levied or go into liquidation
whether compulsory or voluntary not being merely a voluntary liquidation for the purpose of
amalgamation or reconstruction.
Then in any such case, the Owner shall have the power to enter upon the works and take
possession thereof and of the materials, temporary works, constructional equipment, and stock
thereon, and to revoke the contractor’s license to use the same, and to complete the works, by
his agents, other contractor or workmen, or to re-let the same upon any terms and to such other
person firm or corporation as the Owner in his absolute discretion may think proper to employ
and for the purpose aforesaid to use or authorize the use of any materials, temporary works
constructional equipment, and stock as aforesaid without making payment or allowances to
the contractor for the said materials other than such as may be certified in writing by the
Engineer-in-Charge to be reasonable, and without making any payment or allowance to the
contractor for the use of the temporary said works, constructional equipment’s and stock or
being liable for any loss of damage thereto, and if the Owner shall by reason of his taking
possession of the works or of the works being completed by other contractors (due account
being taken of any such extra work or works which may be omitted) then the amount of such
excess as certified by the Engineer-in- Charge shall be deducted from any money which may
be due for work done by the contractor under the contract and not paid for. Any deficiency
shall forthwith be made good and paid to the Owner by the contractor and the Owner shall
have power to sell in such manner and for such price as he may think fit all or any of the
constructional equipment, materials etc. belonging to and to recoup and retain the said
deficiency or any part thereof out of the proceeds of the sale.
37 CONTRACTORS RESPONSIBILITY WITH OTHER AGENCIES:
Without repugnance to any other condition, it shall be the responsibility of the contractor
executing the work of civil construction, to work in close co-operation and co-ordinate the
works with other contractors or their authorized representatives and the contractor will put up
a joint scheme, showing the arrangements, with other contractors / agencies for carrying his
portion of work to the Engineer-in-Charge, and get the approval. The contractor before finally
submitting the schemes to the Engineer-in-Charge shall have the written agreement of the other
agencies. The Engineer-in-Charge before communicating his approval of the scheme, with any
required modifications shall get the final agreement of all the agencies, which shall be binding.
No claim shall be entertained on account of the above. The contractor shall conform in all
respects with the provisions of any statutory regulations, ordinances or by laws of any local or
duly constituted authorities or public bodies which may be applicable from time to time to the
works or any temporary works. The contractor shall keep the Owner Indemnified against all
penalties and liabilities of every kind arising out of non-adherence to such statutes ordinances,
laws, rules, regulations, etc.
38 OTHER AGENTS AT SITE:
The contractor shall have to execute the work in such place and condition where other agencies
might also be engaged for other works such as site grading, filling and leveling, electrical and
mechanical engineering works etc. No claim shall be entertained to works being executed in
the above circumstances.
Any notice hereunder may be served on the contractor or his duly authorized representative at
the job site or may be served by registered mail direct to the address furnished by the
Contractor. Proof of issue of any such notice could be conclusive of the contractor having been
duly informed of all contents therein.
40 RIGHTS OF VARIOUS INTERESTS:
i) The Owner reserves the right to distribute the work between more than one contractors. The
contractor shall co- operate and afford other contractors reasonable opportunity for access to
the works for the carriage and storage of materials and execution of their works.
ii) Whenever the work being done by any department of the Owner or by other contractors
employed by the Owner is contingent upon work covered by the contract, the respective rights
of the various interests involved shall be determined by the Engineer-in-Charge to secure the
completion of the various portions of the work in general harmony.
41 RIGHT OF OWNER TO DETERMINE / TERMINATE CONTRACT
i) Owner shall, at any time be entitled to determine and terminate the contract, if in the opinion
of the Owner the cessation of the work becomes necessary owing to paucity of funds or for any
other cause whatsoever, in which case, the cost of approved materials at the site at current
market rates as verified and approved by Engineer-in- Charge and of the value of the work
done to date by the contractor shall be paid for in full at the rates specified in the contract. A
notice in writing from the Owner to the contractor of such determination and termination and
the reason thereof, shall be the conclusive proof of the fact that the contract has been so
determined and terminated by the Owner.
ii) Should the contract be determined under sub-clause (i) of this clause and the contractor claims
payments to compensate expenditure incurred by him in the expectation of completing the
whole of the work, the Owner shall consider and admit such claim as are deemed fair and
reasonable and are supported by vouchers to the satisfaction of the Engineer-in-Charge. The
Owner’s decision on the necessity and propriety of any such expenditure shall be final and
conclusive and binding on the contractor.
42 TERMINATION FOR CONVENIENCE :
BPCL shall, in addition to any other right enabling it to terminate the contract, have the right to
terminate the contract at any time by giving prior written notice of at least 14 days to the
contractor. Such termination shall be without prejudice to the rights of the parties that have
accrued on or before the date of termination of the contract.
If the contract is terminated under this provision, the contractor is entitled to be compensated as
a. the contract price attributable to the works performed as at the date of termination and
b. the reasonable costs incurred by the contractor for termination of subcontractors or the
repatriation of the contractors’ and subcontractors’ employees less the aggregate of all
previous payments allocated to the works.
Any sums due to BPCL from the contractor accruing prior to the date of termination will be
deducted from the amount to be paid to the contractor under the contract.
If, as a result of any such deductions, there is a negative amount payable to the contractor, then
the contractor must pay an amount equal to such negative sum to BPCL within 15 days of BPCL
intimating the contractor.
43 PATENTS AND ROYALTIES:
43.1 The contractor, if licensed under any patent covering equipment, machinery, materials or
compositions of matter to be used or supplied or methods and process to be practiced or
employed in the performance of this contract, agrees to pay all royalties and license fees which
may be due with respect thereto. If any equipment, machinery, materials or composition
matters, to be used or supplied or methods and process to be practiced or employed in the
performance of this contract, is covered by a patent under which contractor is not licensed then
the contractor before supplying or using the equipment, machinery, materials, compositions
method or processes shall obtain such licenses, and pay such royalties and license fees as may
be necessary for performance of the contract. In the event, the contractor fails to pay any such
royalties or obtain any such license, any suit for infringement of such patents which is brought
against the contractor or the Owner as a result of such failure will be defended by the contractor
at his own expenses and the contractor will pay any damages and costs awarded in such suit.
The contractor shall promptly notify the owner if the contractor has acquired knowledge of
any patent under which a suit for infringement could be reasonably brought because of the use
by the Owner of any equipment, machinery, materials, and process methods to be supplied
hereunder. The contractor agrees to and does hereby grant to Owner, together with the right to
extend the same to any of the subsidiaries of the Owner as irrevocable, royalty- free license to
use in any country, any invention made by the contractor or his employee in or as a result of
the performance of the work under the contract.
The Owner shall indemnify and save harmless the contractor from any loss on account of claims
on contractor for the contributory infringement of patent rights arising out and based upon the
claim that the use by the Owner of the process included in the design prepared by the Owner
and used in the operation of the plant infringes on any patent right with respect to any sub-
contract entered into by contractor pursuant to the provisions of sub-contractor an undertaking
to provide the Owner with the same patent protection that contractor is required to provide
under The provisions of this clause.
43.2 All drawings, blue prints, tracings, reproducible, models, plans, specification and copies
thereof, furnished by the Owner as well as drawings, tracings, reproducible, plans
specifications, design, calculations etc. prepared by the contractor for the purpose of execution
of works covered in or connected with this contract shall be the property of Owner and shall
not be used for any other work but are to be delivered to the Owner at the completion of the
43.3 Where so desired by Engineer-in-Charge, the contractor agrees to respect the secrecy of any
document, drawings etc. issued to him for the execution of this contract, and restrict access to
such documents, drawing etc. to the minimum and further, the contractor agrees to execute an
individual SECRECY agreement from each or any person employed by contractor having
access to such documents, drawings and to any other agency or individual, without the written
approval by Engineer-in-Charge.
44.1 If, at any time, there should be evidence or any lien or claim for which the Owner might have
become liable and which is chargeable to the contractor, the Owner shall have the right to
retain out of any payment then due or thereafter to become due an amount sufficient to
completely indemnify the owner against such lien or claim and if such lien or claim be valid
the Owner may pay and discharge the same and deduct the amount so paid from any money
which may be or may become due and payable to the Contractor. If any lien or claim remain
unsettled after all payments are made, the contractor shall refund or pay to the Owner all
moneys that the latter may be compelled to pay in discharging such lien or claim including all
costs and reasonable expenses.
44.2 Contractor will not disclose details of the work to any person or persons except those engaged
in its performance, and only to the extent required for the particular portion of the work being
Contractor will not give any items concerning details of the work to the press or a news
disseminating agency without prior written approval from Engineer-in-Charge. Contractor
shall not take any pictures on site without written approval of Engineer-in-Charge
45 OPERATION OF CONTRACT:
45.1 Law Governing:
Regardless of the place of contracting, place of performance or otherwise, this Agreement, and
all amendments, modifications, alterations, or supplements, thereto shall be governed by the
laws of India and respective state laws for the nature, validity and interpretation thereof.
45.2 Non-Waiver of Default:
Any failure by the Owner or Contractor at any time, or from time to time, to enforce or require
the strict keeping and performance of any of the terms or conditions of this agreement, or to
exercise a right hereunder, shall not constitute a waiver of such terms, conditions or rights, and
shall not affect or impair same, or the right of the Owner or the Contractor, as the case may be
at any time to avail itself of same.
PERFORMANCE OF WORK
46 EXECUTION OF WORKS:
46.1 All the works shall be executed in strict conformity with the provisions of the contract
documents and with such explanatory detailed drawings, specifications, and instructions as
may be furnished from time to time to the contractor by the Engineer-in-Charge whether
mentioned in the contract or not. The contractor shall be responsible for ensuring that works
throughout are executed in the most substantial, proper and workman like manner with the
quality of material and workmanship in strict accordance with the specifications following all
safety requirements and as stipulated in work permits as per the directions and to the entire
satisfaction of the Engineer-in- Charge.
46.2 Wherever it is mentioned in the specifications that the Contractor shall perform certain work
or provide certain facilities/materials, it is understood that the contractor shall do, so at his cost
unless otherwise specified.
46.3 The materials, design and workmanship shall satisfy the relevant Indian Standards, the Job
specification contained herein and codes referred to. Where the job specification stipulate
requirements in addition to those contained in the standards codes and specifications, these
additional requirements shall also be satisfied.
47 COORDINATION AND INSPECTION OF WORK:
The coordination and inspection of the day-to-day work under the contract shall be the
responsibility of the Engineering- in-Charge. The written instructions regarding any particular
job will be normally be passed by the Engineer-in-Charge or his authorized representative. A
work order book / logbook will be maintained by the Contractor for each job in which the
aforesaid written instructions will be entered. These will be signed by the contractor or his
authorized representative by way of acknowledgment within 12 hours. The non-maintaining of
the order book or non-signing by the contractor shall not preclude the contractor from
complying with the instructions.
48 WORK IN MONSOON AND DEWATERING:
48.1 The completion of the work may entail working in the monsoon also. The contractor must
maintain a minimum labor force as may be required for the job and plan and execute the
construction and erection according to the prescribed schedule. No extra rate will be
considered for such work in monsoon.
48.2 During monsoon and other period, it shall be the responsibility of the contractor to keep the
construction work site free from water at his own cost.
49 WORK ON SUNDAYS AND HOLIDAYS:
For carrying out work on Sundays and Holidays if needed, the contractor will approach the
Engineer-in-Charge or his representative at least two days in advance and obtain permission in
writing. No special compensation on this account will be payable.
50 GENERAL CONDITIONS FOR CONSTRUCTION AND ERECTION WORK:
50.1 Place of Work:
The work has to be executed at specified premises as per the tender. Contractor should apprise
himself of all the conditions prevailing in such location and the restrictions placed on
movement of personnel and equipment, types of equipment and tools permitted, working
methods allowed etc. in the light of security and safety regulations operative in the area.
The safety regulations to be complied with, by the contractor will also be provided along with
the tender. No idle time wages or compensation for temporary stoppage of work or restrictions
would be paid, and the rate quoted for the various items of work should cover the cost of all
such contingencies and eventualities. Substantial structures and utilities exist both above
ground and underground, adjacent to the work site. (The construction activity gets restrained
by the existence of such structures and utilities). Special care is necessary in transportation,
storage, working on equipment’s and other construction activities to protect the existing
features and prevent damage to any facility. Necessary protective structures barricades etc.
have to be erected at various places as directed by Engineer-in Charge. No extra payment of
such protective works will be made unless specially provided in the tender.
50.2 The working time or the time of work is 48 hours per week normally. Overtime work is
permitted in cases of need and the Owner will not compensate the same. Shift working at 2 or
3 shifts per day may become necessary and the contractor should take this aspect into
consideration for formulating his rates for quotation. No extra claims will be entertained by
the Owner on this account.
50.3 The contractor must arrange for the placement of workers in such a way that the delayed
completing of the work or any part thereof for any reasons whatsoever will not affect their
proper employment. The Owner will not entertain any claim for idle time payment whatsoever.
50.4 The contractor shall submit to the Owner reports at regular intervals regarding the state and
progress of work. The details and preforms of the report will mutually be agreed after the
award of contract.
51 DRAWINGS TO BE SUPPLIED BY THE OWNER:
51.1 Where drawings are attached with tender, these shall be for the general guidance of the
contractor to enable him to visualize the type of work contemplated and scope of work
involved. The contractor will be deemed to have studied the drawings and formed an idea
about the work involved.
51.2 Detailed working drawings on the basis of which actual execution of the work is to proceed
will be furnished from time to time during the progress of the work. The contractor shall be
deemed to have gone through the drawings supplied to him thoroughly and carefully and in
conjunction with all other connected drawings and bring to the notice of the Engineer-in-
Charge, discrepancies, if any, therein before actually carrying out the work.
51.3 Copies of all detailed working drawings relating to the works shall be kept at the contractor’s
office of the site and shall be made available to the Engineer-in-Charge at any time during the
contract. The drawings and other documents issued by the Owner shall be returned to the
Owner on completion of the works. Reference is also invited to clause 43.2 and 43.3 above
regarding drawings and other documents.
52 DRAWINGS TO BE SUPPLIED BY THE CONTRACTOR:
52.1 Where drawings/data are to be furnished by the contractor, they shall be as enumerated in the
special conditions of contract, and shall be furnished within the specified time.
52.2 Where approval of drawings before manufacture / construction / fabrication has been
specified, it shall be contractor’s responsibility to have these drawings prepared as per the
directions of Engineer-in-Charge and got approved before proceeding with manufacture
construction / fabrication, as the case may be. Any changes that may have become necessary
in these drawings during the execution of the work shall have to be carried out by the
contractor to the satisfaction of Engineer-in-Charge at no extra cost. All final drawings shall
bear the certification stamps duly signed by both the contractor and the Engineer-in-Charge.
52.3 A period of 3 weeks from the date of receipt shall be required normally for approval of
drawings by the Engineer-in- Charge.
53 SETTING OUT WORKS:
53.1 The Engineer-in-Charge shall furnish the contractor with only the four corners of the work site
and a level bench mark and the contractor shall set out the works and shall provide efficient
staff for the purpose and shall be solely responsible for the accuracy of such setting out.
53.2 The contractor shall provide, fix and be responsible for the maintenance of all stacks,
templates, level marks, profiles and other similar things and shall take all necessary precaution
to prevent their removal or disturbance and shall be responsible for the consequence of such
removal or disturbance should the same take place and for their efficient and timely
reinstatement. The contractor shall also be responsible for the maintenance of all existing
survey marks, boundary marks, distance marks and center line marks, either existing or
supplied and fixed by the contractor. The, work shall be set out to the satisfaction of the
Engineer-in-Charge. The approval thereof or joining in setting out the work shall not relieve
the contractor of any of his responsibilities.
53.3 Before beginning the works, the contractor shall at his own cost, provide all necessary
reference and level posts, pegs, bamboos, flags, ranging rods, strings and other materials for
proper layout of the work in accordance with the scheme, for bearing marks acceptable to the
Engineer-in-Charge. The center, longitudinal or face lines and cross lines shall be marked by
means of small masonry pillars. Each pillar shall have distinct marks at the center to enable
theodolite to be set over it. No work shall be started until all these points are checked and
approved by the Engineer-in-Charge in writing but such approval shall not relieve the
contractor of any of his responsibilities. The contractor shall also provide all labormaterial and
other facilities, as necessary, for the proper checking of layout and inspection of the points
during construction.
53.4 Pillars bearing geodetic marks located at the site of work under construction should be
protected and fenced by the contractor.
53.5 On completion of works, the contractor must submit the geodetic documents according to
which the work was carried out.
54 RESPONSIBILITY FOR LEVEL AND ALIGNMENT:
The contractor shall be entirely and exclusively responsible for the horizontal and vertical
alignment, the levels and correctness of every part of the work and shall rectify effectually any
errors or imperfections therein. Such rectifications shall be carried out by the contractor, at his
own cost, when instructions are issued to that effect by the Engineer-in-Charge.
55 MATERIALS TO BE SUPPLIED BY CONTRACTOR:
55.1 The contractor shall procure and provide the whole of the materials required for construction
including tools, tackles, construction plant and equipment for the completion and maintenance
of the works except the materials which will be issued by Owner and shall make his own
arrangement for procuring such materials and for the transport thereof. The materials procured
by the contractor shall be BPCL approved/specified quality.
55.2 All materials procured should meet the specifications given in the tender document. The
Engineer-in-Charge may, at his discretion, ask for samples and test certificates for any batch
of any material procured. Before procuring, the contractor should get the approval of Engineer-
in-Charge for any material to be used for the works.
55.3 Manufacturer’s certificate shall be submitted for all materials supplied by the contractor. If,
however, in the opinion of the Engineer-in-Charge any tests are required to be conducted on
the materials supplied by the contractor, these will be arranged by the contractor promptly at
56 MATERIALS SUPPLIED BY OWNER:
56.1 If the specifications of the work provides for the use of any materials of special description to
be supplied from the Owner’s stores, price for such material to be charged therefore as herein
after mentioned being so far as practicable for the convenience of the contractor but not so as
in any way to control the meaning or effect of the contract. The contractor shall be bound to
purchase and shall be supplied such materials as are from time to time required to be used by
him for the purpose of the contract only. The sums due from the contractor for the value of the
actual materials supplied by the Owner will be recovered from the running account bill on the
basis of the actual consumption of materials in the work covered and for which the running
account bill has been prepared. After the completion of the works, however, the contractor has
to account for the full quantity of materials supplied to him as per relevant clauses in this
56.2 The value of the materials as may be supplied to the contractor by the Owner will be debited
to the contractor’s account at the rates shown in the schedule of chargeable materials and if
they are not entered in the schedule, they will be debited at cost price, which for the purpose
of the contract shall include the cost of carriage and all other expenses whatsoever such as
normal storage supervision charges which shall have been incurred in obtaining the same at
the Owner’s stores. All materials so supplied to the contractor shall remain the absolute
property of the Owner and shall not be removed on any account from the site of the work, and
shall be at all times open for inspection to the Engineer-in-Charge. Any such materials
remaining unused at the time of completion or termination of the contract shall be returned to
the Owner’s stores or at a place as directed by the Engineer-in- Charge in perfectly good
condition, at contractor’s cost.
57 CONDITIONS FOR ISSUE OF MATERIALS:
i) Materials specified to be issued by the Owner will be supplied to the contractor by the Owner
from his stores/location. It shall be the responsibility of the contractor to take delivery of the
materials and arrange for its loading, transport and unloading at the site of work at his own
cost. The materials shall be issued between the working hours and as per the rules of the
Owner framed from time to time.
ii) The contractor shall bear all incidental charges for the storage and safe custody of materials
at site after these have been issued to him.
iii) Materials specified to be issued by the Owner shall be issued in standard sizes as obtained
from the manufacturer.
iv) The contractor shall construct suitable go down at the site of work for storing the materials
safe against damage by rain, dampness, fire, theft etc. He shall also employ necessary watch
and ward establishment for the purpose.
v) It shall be duty of the contractor to inspect the material supplied to him at the time of taking
delivery and satisfy himself that they are in good condition. After the materials have been
delivered by the Owner, it shall be the responsibility of the contractor to keep them in good
condition and if the materials are damaged or lost, at any time, they shall be repaired and/
or replaced by him at his own cost, according to the directions of the Engineer-in-Charge.
vi) The Owner shall not be liable for delay in supply or non-supply of any materials which the
Owner has undertaken to supply where such failure or delay is due to natural calamities, act
of enemies, transport and procurement difficulties and any circumstances beyond the control
of the Owner. In no case, the contractor shall be entitled to claim any compensation or loss
suffered by him on this account.
vii) It shall be the responsibility of the contractor to arrange in time all materials required for
the works other than those to be supplied by the Owner. If, however, in the opinion of the
Engineer-in-Charge the execution of the work is likely to be delayed due to the contractor’s
inability to make arrangements for supply of materials which normally he has to arrange
for, the Engineer-in-Charge shall have the right, at his own discretion, to Issue such
materials If available with the Owner or procure the materials from the market or elsewhere
and the contractor will be bound to take such materials at the rates decided by the Engineer-
in-Charge. This, however, does not in any way absolve the contractor from responsibility of
making arrangements for the supply of such materials in part or in full, should such a
situation occur, nor shall this, constitute a reason for the delay in the execution of the work.
viii) None of the materials supplied to the contractor will be utilized by the contractor for
manufacturing item, which can be obtained from standard manufacturer in finished form.
ix) The contractor shall, if desired by the Engineer-in-Charge, be required to execute an
indemnity bond for safe custody and accounting of all materials issued by the Owner.
x) The contractor shall furnish to the Engineer-in-Charge sufficiently in advance a statement
showing his requirements of the quantities of the materials to be supplied by the Owner and
the time when the same will be required by him for the works, so as to enable the Engineer-
in-Charge to make necessary arrangement for procurement and supply of the material.
xi) A daily account of the materials issued by the Owner shall be maintained by the contractor
indicating the daily receipt, consumption and balance in hand. This account shall be
maintained in a manner prescribed by the Engineer-in-Charge along with all connected
papers viz. requisition, issues etc. and shall be always available for inspection in the
contractor’s office at site.
xii) The contractor should see that only the required quantities of materials are got issued. The
contractor shall not be entitled to cartage and incidental charges for returning the surplus
materials, if any, to the stores/location where from they were issued or to the place as
directed by the Engineer-in-Charge.
xiii) Materials/ Equipment supplied by Owner shall not be utilized for any other purpose(s) than
58 MATERIALS PROCURED WITH ASSISTANCE OF OWNER:
Notwithstanding anything contained to the contrary in any or all the clause of this document
where any materials for the execution of the contract are procured with the assistance of Owner
either by issue from Owner’s stock or purchase made under orders or permits or licenses issued
by Government, the contractor shall hold the said materials as trustee for the Owner and use
such materials economically and solely for the purpose of the contract and not dispose them
off without the permission of the owner and return, if required by the Engineer-in-Charge, all
surplus or unserviceable materials that may be left with him after the completion of the contract
or at its termination for any reason, whatsoever on his being paid or credited such prices as the
Engineer in-Charge shall determine having due regard to the condition of the materials. The
price allowed to the contractor however, shall not exceed the amount charged to him excluding
the storage charges if any. The decision of the Engineer-in- Charge shall be final and conclusive
in such matters. In the event of breach of the aforesaid condition, the contractor shall in terms
of the licenses or permits, and/or for criminal breach of trust, be liable to compensate the Owner
a double rate or high rate, in the event of those materials at that time having higher rate or not
being available in the market, then any other rate to be determined by the Engineer-in-Charge
and his decision shall be final and conclusive.
59 MATERIALS OBTAINED FROM DISMANTLING:
If the contractor in the course of execution of the work is called upon to dismantle any part for
reasons other than those stipulated in clauses 66 & 70 hereunder, the materials obtained in the
work of dismantling etc. will be considered as the Owner’s property and will be disposed of to
the best advantage of the Owner.
60 ARTICLES OF VALUE FOUND:
All gold, silver and other materials, of any description and all precious stones, coins, treasure
relies, antiquities and other similar things which shall be found in, under or upon the site, shall
be property of the Owner and the contractor shall duly preserve the same to the satisfaction of
the Engineer-in-Charge and shall from time to time deliver the same to such person or person
indicated by the Owner.
61 DISCREPANCIES BETWEEN INSTRUCTIONS:
Should any discrepancy occur between the various instructions furnished to the contractor, his
agents or staff or any doubt, arise as to the meaning of any such instructions or should there be
any misunderstanding between the contractor’s staff and the Engineer-in-Charge’s staff, the
contractor shall refer the matter immediately in writing to the Engineer-in-Charge whose
decision thereon shall be final and conclusive and no claim for losses alleged to have been
caused by such discrepancies between instructions, or doubts, or misunderstanding shall in any
event be admissible.
62 ALTERATIONS IN SPECIFICATIONS AND DESIGNS AND EXTRA WORK:
A) The Engineer-in-Charge shall have power to make any alterations in, omissions from,
additions to of substitutions for, the schedule of rates, the original specifications, drawings,
designs and instructions that may appear to him to be necessary or advisable during the
progress of the work and the contractor shall be bound to carry out such altered / extra / new
items of work in accordance with any instructions which may be given to him in writing
signed by the Engineer-in-Charge and such alterations, omissions, additions or substitutions
shall not invalidate the contract and any altered additional or substituted work which the
contractor may be directed to do in the manner above specified as part of the work shall be
carried out by the contractor on the same conditions in all respect on which he agree to do
the main work. The time for completion of work may be extended for the part of the
particular job at the discretions of the Engineer-in-Charge, for only such alteration, additions
or substitutions of the work, as he may consider as just and reasonable. The rates for such
additional, altered or substituted work under this clause shall be worked out in accordance
with the following provisions:
a) If the rates for the additional, altered or substituted work are specified in the contract for
the work, the contractor is bound to carry out the additional, altered or substituted work at
the same rates as are specified in the contract.
b) If the rates for the additional, altered or substituted work are not specifically provided in
the contract for the work, the rates will be derived from the rates for similar class of works
as specified in the contract for the work. The opinion of the Engineer-in-Charge as to
whether the rates can be reasonably so derived from items in the contracts will be final and
binding on the contractor.
c) If the rates for the altered, additional or substituted work cannot be determined in the
manner specified in sub clause (a) and (b) above, then the contractor shall inform the
Engineer-in-Charge of the rate which is his intention to charge for such class of work
supported by analysis of the rate or rates claimed, and the Engineer-in-Charge shall
determine the rates on the basis of the prevailing market rates of materials, labor cost at
schedule of labor plus 10% to cover contractor’s supervision, overheads and profit and pay
the contractor accordingly. The opinion of the Engineer-in-Charge as to the current market
rates of materials and the quantum of labor involved per unit of measurement will be final
and binding on the contractor.
d) Provisions, contained in sub-clause (a) to (c) above shall not, however, apply:
Where the value of alterations / additions / deletions or substitutions exceeds beyond plus
or minus 25% of the estimated contract value (i.e. quoted item rates of contractor shall
hold good for variations etc. within plus or minus 25% of estimated contract value)
B) In the event and as a result of such alternatives / additions / substitutions / deletion, the scope
of contract work exceed the value stipulated in the contract by more than the limits given in
clause (d) above, the Contractor shall claim revision of the rates supported by the proper
analysis in respect of such items for quantities in excess of the above limits, notwithstanding
the fact that the rates for such items exist in the tender for the main work or can be derived
in accordance with the provision of sub-clause (b) of Clause 62 A, and the Engineer-in-
Charge may revise their rates having regard to the prevailing market rates, and the contractor
shall be paid in accordance with the rates so fixed. But, under no circumstances the
contractor shall suspend / stop / slowdown the work on the plea of non-settlement of rates
of items falling under this clause.
63 VARIATION IN CONTRACT VALUE :
Compensation for Reduction in Contract value due to change in quantity:
Up to & inclusive of (-) 25% of Total Contract Value (TCV): No cost compensation.
Beyond (-) 25% of TCV: Cost compensation @ 10% of reduction in the contract value from
(-) 25% of TCV (i.e. 75% of
Discount to be obtained for Increase in contract value due to change in quantity:
Up to & inclusive of (+) 50% of TCV: No discount.
Beyond (+) 50% of TCV: Reduction @ 10% of increase in the contract value beyond (+) 50%
64 ACTION WHERE NO SPECIFICATIONS ISSUED:
In case of any class of work for which there is no such specification given by the Owner in the
tender documents, such work shall be carried out in accordance with Indian Standard
Specifications and if the Indian Standard Specifications do not cover the same the work should
be carried out as per standard Engineering Practice subject to the approval of the Engineer-in-
65 ABNORMAL RATES:
The contractor is expected to quote rate for each item after analysis of cost involved for the
completion of item/work, considering all specifications and conditions of contract. This will
avoid loss of profit or gain, in case of curtailment or change of specification for any item. In
case it is noticed that the rates for any item, quoted by the tenderer are unusually high or
unusually low, it will be sufficient cause for the rejection of the tender unless the Owner is
convinced about the reasonableness of the rates on scrutiny of the analysis for such rate to be
furnished by the tenderer on demand.
66 INSPECTION OF WORK:
66.1 The Engineer-in-Charge will have full power and authority to inspect the works at any time
wherever in progress either on the Site or at the contractor’s premises / workshop where
situated premises /workshops of any person, firm or corporation where work in connect with
the contract may be in hand or where materials are being or are to be supplied, and the
contractor shall afford or procure for the Engineer-in-Charge every facility and assistance to
carry out such Inspection. The contractor shall at all time during the usual working hours and
at all other time for which reasonable notice of the intention of the Engineer in-Charge or his
representative to visit the works have been given to the contractor, either himself be present
to receive order and instructions or post a responsible agent duly accredited in writing for the
purpose. Orders given to the contractor’s agent shall be considered to have the same force as
if they had been given to the contractor himself. The contractor shall give not less than seven
days, notice in writing to the Engineer-in-Charge before covering up or placing any work
beyond reach of inspection and measurement any work in order that the same may be inspected
and measured. In the event of breach of above the same shall be uncovered at contractor’s
expense carrying out such measurement or inspection.
66.2 No materials shall be dispatched by the contractor before obtaining the approval of Engineer-
in-Charge in writing. The contractor is to provide at all times during the progress of the work
and the maintenance period, proper means of access with ladders, gangways, etc. and the
necessary attendance to move and adopt as directed for inspection or measurement of the
works by the Engine in-Charge.
67 ASSISTANCE TO THE ENGINEERS:
The contractor shall make available to the Engineer-in-Charge, free of cost necessary instruments
and assistance in checking of setting out of works and taking measurement of work.
68 TESTS FOR QUALITY OF WORKS:
68.1 All workmanship shall be of the respective kinds described in the contract documents and in
accordance with the instructions of the Engineer-in-Charge and shall be subjected from time
to time to such test at contractor’s cost as the Engineer-in-Charge may direct at place of
manufacture or fabrication or on the site or at all or any such places. The contractor shall
provide assistance, instruments, labor and materials as are normally required for examining,
measuring and testing any workmanship as may be selected and required the Engineer-in-
68.2 All the tests necessary in connection with the execution of the work as decided by Engineer-
in-Charge shall be carried out at the field testing laboratory of the Owner by paying the charges
as decided by the Owner from time to time. In case of non-availability of test facility with the
Owner, the required test shall be carried out at the cost of contractor at government or any
other testing laboratory as directed by Engineer-in-Charge.
68.3 If any tests are required to be carried out in connection with the work or materials
workmanship not supplied by the contractor, such tests shall be carried out by the contractor
as per the instructions of Engineer-in-Charge and cost of such tests shall be reimbursed by the
The contractor shall furnish to the Engineer-in-Charge for approval when requested or if
required by the specifications, adequate samples of all materials and finishes to be used in the
work. Such samples shall be submitted before the work is commenced and in ample time to
permit tests and examinations thereof. All materials furnished and finishing applied in actual
work shall be fully identical to the approval samples.
70 ACTION AND COMPENSATION IN CASE OF BAD WORK:
If it shall appear to the Engineer-in-Charge that any work has been executed with unsound,
imperfect or unskilled workmanship or with materials of any inferior description, or that any
materials or articles provided by the contractor for the execution of the work are unsound or of
a quality inferior to that contracted for, or otherwise not in accordance with the contract, the
contractor shall on demand in writing from the Engineer-in-Charge or his authorized
representative, specifying the work, materials or articles complained of, notwithstanding that
the same have been inadvertently passed, certified and paid for forthwith shall rectify or remove
and reconstruct the works specified and provide other proper and suitable materials or articles
at his own charge and cost, and in the event of failure to do so within a period to be specified
by the Engineer-in-Charge in his demand aforesaid, the contractor shall be liable to pay
compensation at the rate of one percentage of the estimated cost of the whole work, for every
week limited to a maximum of 10 per cent of the estimated cost of the whole work, while his
failure to do so shall continue and in the case of any such failure the Engineer-in-Charge may
on expiry of notice period rectify or remove and re-execute the work or remove and replace
with others, the materials or articles complained of as the case may be at the risk and expenses
of the contractors in all respects. The decision of the Engineer-in-Charge as to any question
arising under this clause shall be final and conclusive.
71 SUSPENSION OF WORKS:
The contractor shall, if ordered in writing by the Engineer-in-Charge or his representative,
temporarily suspend the works or any part thereof for such period and such time as so ordered
and shall not, after receiving such written order, proceed with the work therein ordered to be
suspended, until he shall have received a written order to proceed therewith. The contractor
shall not be entitled to claim/ compensation for any loss or damage sustained by him by reason
of temporary suspension of the works aforesaid. An extension of time for completion,
corresponding with the delay caused by any such suspension of the works as aforesaid will be
granted to the contractor, should he apply for the same, provided that suspension was not
consequent to any default or failure on the part of the contractor.
72 OWNER MAY DO PART OF WORK:
Upon failure of the contractor to comply with any instructions given in accordance with the
provisions of the contract, the owner has the alternative right, instead of assuming charge for
entire work to place additional labor force, tools, equipment’s and materials on such parts of
the work, as the owner may designate or also engage another contractor to carry out the work.
In such cases, the owner shall deduct from the amount which otherwise might become due to
the contractor, the cost of such work and materials with ten percent added to cover all
departmental charges and should the total amount thereof exceed the amount due to the
contractor, the contractor shall pay the difference to the owner.
73 POSSESSION PRIOR TO COMPLETION:
The Engineer-in-Charge shall have the right to take possession of or use any completed or
partially completed work or part of the work. Such possessions or use shall not be deemed to
be an acceptance of any work completed in accordance with the contract agreement. If such
prior possession or use by the Engineer-in-Charge delays the progress of work, suitable
adjustment in the time of completion will made and contract agreement shall be deemed to be
modified accordingly.
74 PERIOD OF LIABILITY FROM THE DATE OF COMPLETION OF WORK:
74.1 The contractor shall guarantee the installation/site work for a period of 12 (twelve) Months
from the date of completion of work, unless otherwise specified. Any damage that may lie
undiscovered at the time of issue of completion certificate, connected in any way with the
equipment or materials supplied by him or in the workmanship shall be rectified or replaced
by the contractor at his own expense as deemed necessary by the Engineer-in-Charge or in
default, the Engineer-in-Charge may cause the same made good by other workmen and deduct
expenses (for which the certificate of Engineer-in-Charge shall be final) from any sums that
may be then or at any time thereafter, become due to the contractor or from his security deposit.
In case the defect arises within the abovementioned Defect Liability Period (DLP) and the
same is repaired/replaced, the DLP for the repaired/replaced job/item will be extended suitably
so as to cover the original DLP. However, in no case, such extension will exceed 24 months
from date of start of initial DLP.
74.2 If the contractor feels that any variation in work or in quality of materials or proportions would
be beneficial or necessary to fulfill the guarantee called for, he shall bring this to the notice of
the Engineer-in-Charge in writing. The work will not be considered as complete and taken
over by the Owner until all the temporary works etc., constructed by the contractor is removed
and work site cleaned to the satisfaction of Engineer-in-Charge.
74.3 Care of Works:
From the commencement to completion of works, the contractor shall take full responsibility
for the care of all works including all temporary works, and in case any damage, loss or injury
happens to the works or to any part thereof or to any temporary work, from any cause
whatsoever, he shall at own cost repair and make good the same, so that at completion, the
work shall be in good order and in conformity in every respect with the requirements of the
contract and the Engineer-in-Charge’s instructions.
74.4 Effects prior to taking over:
If at any time, before the work is taken over, the Engineer-in-Charge shall
a) Decide that any work done or materials used by the contractor or any sub-contractor is
defective or not in accordance with the contract or that the works or any portion thereof are
defective or do not fulfill the requirements of contract (all such matters being herein after
called ‘Defects’ in this clause) and As soon as reasonably practicable, notice given to the
contractor in writing of the said decisions specifying particulars of the defects alleged to
exist or to have occurred, then the contractor shall at his own expenses and with all speed
make good the defects so specified.
b) In the case contractor shall fail to do so, the Owner may take, at the cost of the contractor,
such steps as may in all circumstances, be reasonable to make good such defects. The
expenditure, so incurred by the Owner shall be recovered from the amount due to the
contractor. The decision of the Engineer-in-Charge with regard to the amount be recovered
from the contractor will be final and binding on the contractor. As soon as the works have
been completed in accordance with the contract (except in minor respects that do not affect
their use for the purpose for which they are intended and except for maintenance thereof
provided in clause 74.1) and have passed the tests on completion, the Engineer-in-Charge
shall issue a certificate (hereinafter called completion certificate) in which he shall certify
the date on which the work have been so completed and have passed the said tests and the
Owner shall be deemed to have taken over the works on the date so certified. If the works
have been divided into various groups in the contract, the Owner shall be entitled to take
over any group or groups before the other or others and thereupon the Engineer-in-Charge
shall issue a completion certificate which will however, be for such group or groups as
taken over only.
74.5 Defects after taking over:
In order that the contractor could obtain a completion certificate, he shall make good with all
possible speed, any defect arising from the defective materials supplied by the Contractor or
workmanship or any act of omission of the contract that may have been noticed or developed
after the works or group of the works has been taken over. The period allowed for carrying out
such work will be normally one month. If any defect be not remedied within a reasonable time,
the Owner may proceed to do the work at the contractor’s risk and expense and deduct from
the final bill such amount as may be decided by the Owner. If by reason of any default on the
part of the contractor a completion certificate has not been issued in respect of every portion of
the work within one month after the date fixed by the contract for the completion of the works,
the Owner shall be at his liberty to use the works or any portion thereof in respect of which a
completion certificate has been issued provided that the works or the portion thereof so used
as aforesaid shall be afforded reasonable opportunity for completing these works for the issue
of completion certificate.
74.6 The Security Deposit/retention money deducted / furnished as per clause 18 of GCC shall be
retained for the period of liability as given in clause 74.1 above. This Retention amount or
Bank Guarantee furnished against Security Deposit/retention money shall be released only on
expiry of the period of liability and also based on the certification of the Engineer-in-charge
that no defect/damage has been reported / observed during the stipulated period of liability for
74.7 Performance of contractor shall be evaluated on each job by Engineer-in-Charge and recorded.
Review of performance will be carried out at appropriate intervals by BPCL.
BILLS / MEASUREMENT / PAYMENT
75 SCHEDULE OF RATES AND PAYMENTS:
i) Contractor’s Remuneration
The price to be paid by the Owner to contractor for the whole of the work to be done and the
performance of all the obligations undertaken by the contractor under the contract documents
shall be ascertained by the application of the respective item rates (the inclusive nature of which
is more particularly defined by way of application but not of limitation, with the succeeding
sub-clause of this clause) and payment to be made accordingly for the work actually executed
and approved by the Engineer-in-Charge. The sum so ascertained shall (excepting only as and
to the extent expressly provided herein) constitute the sole and inclusive remuneration of the
contractor under the contract and no further payment whatsoever shall be or become due or
payable to the contractor under the contract.
ii) Schedule of rates to be inclusive:
The prices/rates quoted by the contractor shall remain firm till the issue of final completion
certificate and shall not be subject to escalation. Schedule of rates shall be deemed to include
and cover all costs, expense and liabilities of every description and all risk of every kind to be
taken in executing, completing and handing over the work to the Owner by the Contractor. The
Contractor shall be deemed to have known the nature, scope, magnitude and the extent of the
works and materials required, though the contract document may not fully and precisely furnish
them. He shall make such provision in the item rates as he may consider necessary to cover the
cost of such items of work and materials as may be reasonable and necessary to complete the
works. The opinion of the Engineer-in- Charge as to the items of work which are necessary and
reasonable for completion of work shall be final and binding on the contractor, although the
same may not be shown on or described specially in contract documents.
Generality of this present provision shall not be deemed to cut down or limit in any way because
in certain cases it may and in other cases it may not be expressly stated that the contractor shall
do or perform a work or supply articles or perform services at his own cost or without addition
of payment or without extra charges or words to the same effect or that it may be stated or not
stated that the same are included in and covered by the schedule of rates.
iii) Schedule of Rates to Cover Constructional Equipment’s, Materials,
Without in any way limiting the provisions of the preceding sub-clause the schedule of rates
shall be deemed to include and cover the cost of all constructional equipment, temporary work
(except as provided for herein), pumps, materials, labor the insurance, fuel, stores and
appliances to be supplied by the contractor and other matters in connection with each item in
the schedule of rates and the execution of the works or any portion thereof, finished, complete
in every respect and maintained as shown or described in the contract documents or may be
ordered in writing during the continuance of this contract.
iv) Schedule of Rates to cover Royalties, Rents and
The Schedule of Rates shall be deemed to include and cover the cost of all royalties and fees
for the articles and processes, protected by letters, or otherwise incorporated in or used in
connection with the works, also all royalties, rents and other payments in connection with
obtaining materials of whatsoever kind for the works and shall include an indemnity to the
Owner which the contractor hereby gives against all actions, proceedings, claims damages,
costs and expenses arising from the incorporation in or use on the works of a such articles,
processes or materials, Octroi or other municipal or local Board charges levied on materials,
equipment or machineries to be brought to site for use on work shall be borne by the contractor.
v) Schedule of Rates to Cover Taxes and Duties:
No claim or exemption or reduction of customs duties, GST, quarry or any port dues, transport
charges, stamp duties or Central or States Government or Local Body or Municipal Taxes or
duties, taxes or charges (from or of any other body), whatsoever, will be granted or obtained,
all of which expenses shall be deemed to be included in and covered by the Schedule of Rates.
Contractor shall also obtain and pay for all permits, or other privileges necessary to complete
vi) Schedule of Rates to cover Risk
The schedule of Rates shall be deemed to include and cover the risk of all possibilities of delay
and interference with the contractors conduct of work which occur from any cause including
orders of owner in the exercises of his powers and on account of extension of time granted due
to various reasons and for all other possible or probable cause of delay.
vii) Schedule of Rates cannot be altered:
For work under unit rate basis, no alteration will be allowed in the schedule of Rates by reason
of work or any part of them being modified, altered, extended, diminished or omitted. The
schedule of Rates are fully inclusive rates
Which have been fixed by the contractor and agreed to the Owner and cannot be altered.
For lump sum contract, the payment will be made according to the work actually carried out
for which purpose an item wise or workwise, Schedule of rates shall be furnished, suitable for
evaluating the value of work done and preparing running account bills.
76 PROCEDURE FOR MEASUREMENT / BILLING OF WORK IN PROGRESS:
i) Measurements:
All measurements shall be in metric system. All the works in progress will be jointly measured
by the representative of the Engineer-in-Charge and the Contractor’s authorize agent
progressively. Such measurement will be got recorded in the measurement book by the
Engineer-in-Charge or his authorized representative and signed in token of accepted by the
contractor or his authorized representative.
For the purpose of taking joint measurement the contractor’s representative shall be bound to
be present whenever required by the Engineer-in-Charge. If, however, he absents for any reason
whatsoever the measurement will be taken by the Engineer-in-Charge or his representative and
this will be deemed to be correct and binding on the contractor.
The contractor will submit a bill to the Engineer-in-Charge of the work giving abstract and
detailed measurements for the various items executed during a month, before the expiry of the
1st week of the succeeding month. The Engineer-in-Charge shall take or cause to be taken the
requisite measurements for the purpose of having the same verified and the claim, as far as
admissible, adjusted, if possible, before the expiry of 10 days from presentation of the bill.
iii) Dispute in Mode of Measurements:
In case of any dispute as to the mode of measurement not covered by the contract to be adopted
for any item of work, mode of measurement as per latest Indian Standard Specifications shall be
77 LUMPSUMS IN TENDER:
For the items in tender where it includes lump sum in respect of Schedule of work, the
contractor shall be entitled to payment in respect of the items at the same rates as are payable
under this contract for such items, or if part of the work in question is not In the opinion of the
Engineer-in-Charge capable of measurement of determination, the owner may at his discretion
pay the lump sum amount entered In the tender or a percentage thereof and the certificate In
writing of the Engineer-in-Charge shall be final and conclusive against the contractor with
regards to any sum or sums payable to him under the provisions of the clause.
78 RUNNING ACCOUNT PAYMENTS TO BE REGARDED AS ADVANCES:
All running account payments shall be regarded as payment by way of advance against the final
payment only and not as payments for work actually done and completed and shall not preclude
the requiring of bad, unsound and imperfect, or unskilled work to be removed and taken away
and reconstructed or re-erected or be considered as an admission of the due performance of the
contract, or any part thereof in this respect, or of the accruing of any claim by the contractor,
nor shall it conclude, determine or affect in any way the powers of the Owner under these
conditions or any of them as to the final settlement and the adjustments of the accounts or
otherwise, or in any other way vary or affect the contract.
The final bill shall be submitted by the contractor within one month of the date of physical
completion of the work, and settled immediately but not later than 60 days otherwise the
Engineer-in charge’s certificate of the measurement and of total amount payable for the work
accordingly shall be final and binding on all parties. The final bill shall be presented by the
contractor along with ‘No claim certificate’ in a format acceptable to the owner or such other
documents as directed by the owner.
Should the contractor consider that he is entitled to any extra payment for extra job carried out
whatsoever in respect of the works, he shall forthwith give notice in writing to the Engineer-
in-Charge that he claims extra payment for the extra work. Such notice shall be given to the
Engineer-in-Charge within one week from the ordering of any extra work or happening of any
event, upon which the contractor bases such claims, and such notice shall contain full
particulars of the nature of such claim with full details and amount claimed. Failure on part of
the contractor to put forward any claim with the necessary particulars as above within the time
above specified shall be an absolute waiver thereof. No omission by the owner to reject any
such claim and no delay in dealing therewith shall be waiver by the owner of any rights in
respect thereof.
80 PAYMENT OF CONTRACTOR’S BILL:
Generally no payment shall be made for works estimated to cost less than Rs.50, 000/- till the
whole of the work shall have been completed. But in case of works estimate to cost more than
Rs 50,000/- the contractor on submitting the bill thereof be entitled to receive a monthly
payment proportion to the part thereof approved and passed by the Engineer-in-Charge, whose
certificate of such approval and passing of the sum so payable shall be final and conclusive
against the contractor. This payment will be made after making necessary deductions as
stipulated elsewhere in the contract document for materials, security deposit or any moneys
due to the Owner etc. 75% payment of the Running Account bill (RA bill) shall be released
within 15 calendar days of receipt of RA bill duly certified by Engineer-in-charge (EIC) and
the balance payment shall be released within 30 days of receipt of RA bill by EIC after detailed
81 CONCLUSION OF CONTRACT:
In a situation where the L1 bidder is not lowest for some specific line items and the L1/L2 parity
is likely to be affected during the execution of the contract, due to variation in quantities of
individual line items in contract based on site conditions, then the final payment could be
restricted to ensure that the overall total payment of the executed work does not exceed the
overall amount that would have been payable to the then L1 as per the latter’s quoted rates.
82 MODE OF PAYMENT:
Payment will be made to the contractor normally through NEFT mode.
83 COMPLETION CERTIFICATE:
83.1 Application for Completion Certificate:
When the contractor fulfills his obligation under clause 74.4, he shall be eligible to apply for
completion certificate. The contractor may apply for separate completion certificate respect of
each such portion of the work by submitting the completion documents along with such
application for completion certificate.
The Engineer-in-Charge shall normally issue to the contractor the completion certificate within
one month after receiving an application therefore from the contractor after verifying from the
completion documents and satisfying himself that the work has been completed in accordance
with and as set out in the construction and erection drawings and the contract documents.
The contractor, after obtaining the completion certificate is eligible to present the final bill for
the work executed by him under the terms of contract.
83.2 Completion Certificate:
The contractor shall be furnished with a certificate by the Engineer-in-Charge of such
completion, but no certificate shall be given nor shall the work be deemed to have been
executed until all scaffolding surplus materials and rubbish is cleared off the site completely or
until the work shall have been measured by the Engineer-in-Charge whose measurement shall
be binding and conclusive. The work will not be considered complete and taken over by the
Owner, until all the temporary works, labor and staff colonies etc. constructed are removed and
the work site cleaned of all debris etc., as described in clause in 83.3 below and to the
satisfaction of the Engineer-in-Charge.
If the contractor shall fail to comply with the requirements of this clause on or before the date
fixed for the completion of the work, the Engineer-in-Charge may at the expenses of the
contractor remove such scaffolding, surplus materials and rubbish and dispose of the same as
he thinks fit and clean off such dirt as aforesaid, and the contractor shall forthwith pay the
amount of all expenses so incurred and shall have no claim in respect of any such scaffolding
or surplus materials as aforesaid except for any sum actually realized by the sale thereof.
83.3 Clearing the site:
Cart away all debris generated from the work and dispose it off without giving rise to any
complaints from local, municipal or government authorities. Metal scraps or any other scrap
including wooden packing materials shall be disposed as instructed by the Engineer-in-Charge
a) All unused scrap steel bar/ structural steel sections/pipe materials etc., (Free issue by
owner) shall be the property of the owner and the same shall be returned by the contractor
category-wise at their own cost to Owner’s store. The weighment slip issued by the
Warehouse (in original) is required to be attached along with the final bill/ material
reconciliation statement. In case, the material is supplied by the contractor, as per their
scope of work, the scrap material generated out of the same should be taken out at their
own cost before the settlement of the final bill.
b) Insulation material (either issued by owner to the contractor or supplied by contractor)
shall be kept in the area allocated by owner. During the insulation activities, the contractor
should keep the work area clean on day-to-day basis. On completion of insulation job, all
debris/packing should be taken out to the designated location or as directed by the
Engineer in charge for disposal at their own cost before the settlement of the final bill.
83.4 The financial implication of above, if any, should be taken care of in the quoted rates; and no
separate claim shall be entertained on this account. The final bill of the contractor shall be
linked with the area cleaning in all respects, including removal of shuttering material, disposal
of debris/scrap etc. to the entire satisfaction of Engineer-in- Charge.
84 FINAL DECISION AND FINAL CERTIFICATE:
Upon Expiry of the period of liability and subject to the Engineer-in-Charge being satisfied that
the works have been duly maintained by the contractor during monsoon or such period as herein
before provided in clause 74 and that the contractor has in all respect duly made up any
subsidence and performed all his obligations under the contract, the Engineer-in-Charge shall
(without prejudice to the rights of the Owner to retain the provisions of relevant clause hereof)
give a certificate herein referred to as the final certificate to that effect. The contractor shall not
be considered to have fulfilled the whole of his obligations under the contract until Final
Certificate have been given by the Engineer-in-Charge notwithstanding any previous entry upon
the work and taking possession, working or using of the same or any part thereof by the owner.
85 CERTIFICATE FOR PAYMENTS AND EVIDENCE OF COMPLETION:
Except the final certificate, no other certificate or payments against a certificate or on general
account shall be taken to be an admission by the Owner of the due performance of the contract
or any part thereof or occupancy or validity of any claim by the contractor.
TAXES/DUTIES/INSURANCE
86 TAXES AND DUTIES :
The contractor agrees to and does hereby accept full and exclusive liability for the payment of
any and all taxes, duties, etc. now in force or hereafter Imposed, increased or modified, from
time to time in respect of work and materials and all contributions and taxes for unemployment
compensation, insurance and old age pensions or annuities now or hereafter imposed by any
Central or State Government authorities which are imposed with respect to or covered by the
wages, salaries, or other compensations paid to the persons employed by the contractor and the
contractor shall be responsible for the compliance with all obligations and restrictions imposed
by the Labor Law or any other law affecting employer - employee relationship and the
contractor further agrees to comply and secure the compliance by all sub-contractors, with all
applicable Central, State, Municipal and local laws and regulations and requirements of any
Central, State or Local Government agency or authority. Contractor further agrees to defend,
indemnify and hold harmless from any liability or penalty which may be Imposed by the
Central, State of Local Authority by reason of any violation by contractor or sub-contractor of
such laws, regulations or requirements and also from all claims, suits or proceeding that may
be brought against the Owner arising under, growing out of, or by reason of the work provided
for by this contract by third parties, or by Central or State Government authority or any
administrative sub-division thereof.
The vendor shall take steps viz. mention relevant GSTIN of BPCL in GST invoices and returns,
uploading invoice in GSTR 1, payment of the tax liability on the said invoices and filing of
Returns etc. and comply with all the requirements of applicable laws including GST laws for the
time being in force to enable the OWNER to avail tax credit/s including input tax credit. Any
loss or non-availability of input tax credit by the OWNER due to non-compliance of applicable
tax law including but not limited to GST laws in force or otherwise, on the part of VENDOR, an
amount equivalent to any tax liability accruing to the OWNER and/or to the extent of any loss
accrued to the OWNER due to the non-availability of input tax credit or any liability accrued to
the OWNER shall either stand cancelled or deducted from the payment due to the VENDOR or
shall be reimbursed by the VENDOR as the case may be till such default is either rectified or
made good by the VENDOR and the OWNER is satisfied that it is in a position to claim valid
input tax credit within the timelines as per applicable laws. Any cost, liability, dues, penalty,
fees, interest as the case may be which accrues to the OWNER at any point of time on account
of non-compliance of applicable tax laws or rules or regulations thereof or otherwise due to
default on the part of VENDOR shall be borne by the VENDOR. An amount equivalent to such
cost, liability, dues, penalty, fees, and interest as the case may be shall be reimbursed by the
VENDOR within 30 days. Any GST as may be applicable on such recovery of amount shall also
be borne by VENDOR and same shall be collected by the OWNER.”
Contractor shall at his own expenses carry and maintain insurance with reputable insurance
companies to the satisfaction of the Owner as follows:
i) Employees State Insurance Act:
The Contractor agrees to and does hereby accept full and exclusive liability for the
compliance with all obligations imposed by the Employees State Insurance Act,
and the contractor further agrees to defend, indemnify and hold Owner harmless from
any liability or penalty which may be imposed by the Central, State or Local Authority
by reason of any asserted violation by contractor or sub-contractor, of the Employee
State Act, 1948 and also from all claims suits or proceedings that may be brought
against the Owner arising under, growing out of or by reason of the work provided for
by this contract whether brought by employees of the contractor, by third parties or by
Central or State Government authority or any political sub-division thereof.
The contractor agrees to filing, with the Employees State Insurance Corporation, the
Declaration Forms and all forms which may be required in respect of the contractor’s
or sub-contractor’s employees whose aggregate remuneration as fixed by the
concerned authorities and who are employed in the work provided for or those covered
by ESI Act under any amendment to the Act from time to time. The contractor shall
deduct and secure the agreement of the sub-contractor to deduct the employee’s
contribution as per the first schedule of the Employee State Insurance Act from wages
and affix the Employee’s contribution Cards at Wages payment intervals. The
contractor shall remit and secure the agreement of the sub-contractor to remit to the
authorized bank, Employee’s State Insurance Corporation Account, the Employee’s
contribution as required by the Act. The contractor agrees to maintain all Cards and
records as required under the Act in respect of employees and the payments and the
contractor shall secure the agreement of the subcontractor to maintain such records.
Any expenses incurred for the contribution, making contribution or maintaining
records shall be to the contractor’s or sub-contractor’s account.
The Owner shall retain such sum as May necessary, from the total contract value until
contractor shall furnish satisfactory proof that all contributions as required by the
Employees State Insurance Act, 1948, have been paid.
ii) Workman’s Compensation and Employee’s Liability Insurance:
Insurance shall be effected for all the Contractor’s employees engaged in the performs
of this contract, if any of the work is sublet, the contractor shall require the sub-
contractor to provide workman’s compensation and employer’s liability Insurance for
the latter’s employees if such employees are not covered under the contractors
iii) Any other Insurance Required Under Law or Regulations or by Owner:
Owner shall cover Project Material and Equipment’s under and over all Marine-cum-
Erection Insurance Policy. Contractor shall carry and maintain any and all other
insurance which be required under any law or regulation from time to time. He shall
also carry and main any other insurance which may be required by the Owner.
iv) Automobile Liability Insurance:
Contractor shall take out an Automobile Liability Insurance to cover all risks to Owner
for each of his vehicles plying on works of this contract and these insurance shall be
valid for the total contract period. No extra payments will be made for this insurance.
Owner shall not be liable for any damage or loss not made good by the insurance
company, should such damage or toss result from un authorized use of the vehicle.
88 DAMAGE TO PROPERTY:
i) Contractor shall be responsible for making good, to the satisfaction of the Owner any loss of
and any damage to all structures and properties belonging to the Owner or being executed or
procured or being procured by the Owner or of other agencies within the premise all the
work of the Owner, if such loss or damage is due to fault and/or the negligence willful acts
or omission of contractor, his employees, agents, representative or \ sub-contractor
ii) The contractor shall indemnify and keep the Owner harmless of all claims for damage to
property other than Owner’s property arising under or by reason of this agreement if such
claims results from the fault and/or negligence or willful acts or omission of contractor, his
employees, agents, representatives or sub- contractors.
LABOUR LAWS AND OTHER REGULATIONS
89 LABOUR LAWS:
i) No labor below the age of eighteen years shall be employed on the work.
ii) The contractor shall not pay less than what is provided under the Minimum Wages Act for the
applicable trade or category of workman to the worker engaged by him on the work and also
ensure that any sub- contractors engaged by him also pay not below the applicable minimum
wages under the Act and hold the company, indemnified in respect of any claims that may arise in
respect or non-compliance with this requirements.
iii) The contractor shall observe all the formalities required under the provisions of the contract labor
(Regulation and abolition) Act 1970 and the rules made thereunder and as may be amended from
time to time. He shall pay the required deposit under the Act Appropriate to the number of
workmen to be employed by him or through sub-contractor and get himself registered under the
Act. He shall produce the certificate of registration granted by the Govt. authority under the Act
to the company before commencement of work. The company recognizes only the contractor and
not his sub-contractors under the provisions of the Act. The contractor will have to submit daily a
list of his employees, who will be entering the Company’s premises for the work awarded. He will
also keep his wage register available at all times as close to the work site as possible and produce
the same for inspection whenever required by designated Company officials. If the company so
desires, a deposit may be taken from the Contractor to be refunded only after the Company is
satisfied that all the workmen employed by the contractor have been fully paid for the period of
work in Company’s premises at least at rates equal to or better than wages provided for under the
Minimum Wages Act.
iv) The Contractor will comply with the provisions of the employee’s Provident Fund Act and the
Family Pension Fund Act as may be applicable and as amended from time to time. Contractor
shall obtain their own provident fund account number. Offer of the contractor who does not have
provident fund account will be liable for rejection.
v) The Contractor will comply with the provisions of the Payment of Gratuity Act 1972 as may be
applicable and as amended from time to time.
90 IMPLEMENTATION OF APPRENTICES ACT 1961:
The Contractor shall comply with provisions of the Apprentices Act 1961 and the Rules/orders
issued thereunder from time to time. If he fails to do so, his failure will be breach of the contract
and the Engineer-in-Charge may, at his discretion, cancel the contract. The contractor shall also
be liable for any pecuniary liability arising on account of any violation by him of the provision of
91 CONTRACTOR TO INDEMNIFY THE OWNER:
i) The contractor shall indemnity the owner and every member, officer and employee of the Owner,
also the Engineer-in-Charge and his staff against all actions, proceedings, claims, demands, costs,
and expenses whatsoever arising out of or in connection with the matters referred to in clause
and all actions/ proceedings, claims, demands, costs and expenses which may be made against the
Owner for or in respect of or arising out of any failure by the contractor in the performance of his
obligations under the contract documents. The Owner shall not be liable for or in respect of any
demand or compensation payable by law in respect of or in consequence of any accident or injury
to any workmen or other person in the employment of the contractor or his sub-contractor and
contractor shall indemnify and keep indemnified the Owner against all such damages and
compensations and against all claims, damage, proceedings, costs, charges and expenses
whatsoever, thereof or in relation thereto.
ii) Payment of Claims and Damages:
Should the Owner have to pay any money in respect of such claims or demands as aforesaid the
amount so paid and the costs incurred by the Owner shall be charged to and paid the Contractor
and the contractor shall not be at liberty to dispute or question the rig of the Owner to make such
payments notwithstanding the same may have been made without his consent or authority or in
law or otherwise to the country.
In every case to which by virtue of the provisions of Section 12, sub-section (I) of workmen’s
compensation Act 1923 or other applicable provisions of workmen’s Compensation Act any other
Act, the Owner is obliged to pay compensation to a workmen employed by contractor in execution
of the works, the Owner will recover from the contractor the amount of compensation so paid and
without prejudice to the rights of Owner under Section 12 sub-section (2) of the said Act. Owner
shall be at liberty to recover such amount or any part thereof by deducting it from the security
deposit or from any sum due to the contractor whether under the contract or otherwise. The Owner
shall not be bound to contest any clime made under Section 12, sub-section (I) of the said Act
except on the written request of contractor and upon his giving to the Owner full security for all
costs for which the Owner might become liable on consequence of contesting such claims.
iii) Employment Liability:
a) The contractor shall be solely and exclusively responsible for engaging or employing persons for
the execution of work. All employees engaged by the contractor shall be on his/ their payroll and
paid by him/ them. All disputes or differences between the contractor and his/ their employees
shall be settled by him/ them. Owner has absolutely no liability whatsoever concerning the
employees of the contractor. The contractor shall indemnify owner against all loss or damage or
liability arising out of or in the course of his/ their employees. The contractor shall make regular
and full payment of wages without giving any complaint by any employee of the contractor or his
sub-contractor regarding non-payment of wages/ salaries or other dues. Owner reserves the right
to make such payments directly, to such employee or sub-contractor of the contractor and recover
the amount in full from the bills of Contractor, and the contractor shall not claim any compensation
or reimbursement thereof. The Contractor shall comply with the Minimum Wages Act applicable
to the area with regard to payment of wages of his employees and also of employees of his sub-
b) The Contractor shall advise in writing to all of his employees and the employees of his sub-
contractor as follows:
It is fully understood that your appointment and/ or deployment is only in connection with the
owner and it does not give you any right of claim for employment by owner.
92 (a) HEALTH AND SANITARY ARRANGEMENTS FOR WORKERS:
In respect of all labor directly employed in the works for performance of the contractor’s par this
agreement, the contractor shall comply with or cause to be complied with all the rules and
regulations of the local sanitary and other authorities or as framed by the Owner from time to time
for the protection of health and sanitary arrangements for all workers.
(b) MEDICAL FITNESS CERTIFICATION :
Contractor shall follow guidelines for medical fitness certification of workers employed for
working at height more than 30 meters using temporary structures.
93 SAFETY REGULATIONS:
i) In respect of all labor directly or indirectly employed In the work for the performance of
contractor’s part of this agreement, the contractor shall at his own expenses arrange for all
safety provisions as per safety codes of C.P.W.D. Indian Standard Institution, the Electricity
Act, The Mines Act and any such other acts as applicable.
ii) The Contractor shall ensure that he, his sub-contractor and his, or their personnel or
representatives shall comply with all Fire / Safety regulations issued from time to time by the
Company or otherwise howsoever and should any injury resulting in death or not or loss / or
damage due to Fire to any property or a portion thereof, occurred as a result of failure to
comply with such regulations, the contractor shall be held responsible for the consequences
thereof and shall keep the company harmless and indemnified.
94 ARBITRATION:
Any dispute or difference whatsoever arising out of or in connection with this Agreement
including any question regarding its existence, validity, construction, interpretation, application,
meaning, scope, operation or effect of this contract or termination thereof shall be referred to and
finally resolved through arbitration as per the procedure mentioned herein below :
i) The dispute or difference shall, in any event, be referred only to a Sole Arbitrator
ii) The appointment and arbitration proceedings shall be conducted in accordance with SCOPE
forum of Arbitration Rules for the time being in force or as amended from time to time
iii) The Seat of arbitration shall be at _____________ (Region/HQ from where the tender has
been floated) (d) the proceedings shall be conducted in English language
iv) The cost of the proceedings shall be equally borne by the parties, unless otherwise directed by
the Sole Arbitrator.
In the event of any dispute or difference relating to the interpretation and application of the
provisions of commercial contract(s) between the Central Public Sector Enterprises (CPSEs)/Port
Trusts inter se and also between CPSEs and Government Departments/Organizations (excluding
disputes concerning Railways, Income Tax, Customs & Excise Departments*), such dispute or
difference shall be taken up by either party for its resolution through AMRCD as mentioned in
DPE OM no.4(1)/2013-DPE(GM)/FTS-1835 dated 22-05-2018.
(* The exclusion would also include disputes concerning GST, State level Sales Tax / VAT etc.
though not mentioned explicitly)
95 JURISDICTION:
The contractor shall be governed by the Laws in force in INDIA. The contractor hereby submits
to the jurisdiction of the Courts situated at Mumbai/ (Ernakulum-in the case of Kochi Refinery),
for the purpose of actions and proceedings arising out of the contract and the courts at Mumbai/
(Ernakulum-in the case of Kochi Refinery), only will have jurisdiction to hear and decide such
actions and proceedings.
96 ORDER OF PRECEDENCE FOR WORKS / SERVICES CONTRACTS:
i Contract Agreement (in GCC)
ii Detailed letter of Acceptance along with its enclosures
iii Letter of Award / Fax of Acceptance
iv Job Specifications (specific to particular job only)
vi Special Conditions of Contract (SCC)
vii Technical Specifications
viii Instructions to Bidders
ix General Conditions of Contract (GCC)
x Other Documents
Additionally, any variation or amendment / change order issued after signing of formal contract
shall take precedence over respective clauses of the formal contract and its Annexures.
97 LIMITATION OF LIABILITY
The aggregate total liability of the Contractor to Owner under the Contract shall not exceed the total
Contract Price, except that this Clause shall not limit the liability of the Contractor for following:
(a) In the event of breach of any Applicable Law;
(b) In the event of fraud, willful misconduct or illegal or unlawful acts, or gross negligence of the
Contractor or any person acting on behalf of the Contractor; or
(c) In the event of acts or omissions of the Contractor which are contrary to the most elementary
rules of diligence which a conscientious Contractor would have followed in similar
circumstances; or
(d) In the event of any claim or loss or damage arising out of infringement of Intellectual Property;
(e) For any damage to any third party, including death or injury of any third party caused by the
Contractor or any person or firm acting on behalf of the Contractor in executing the Works.
Neither Party shall be liable to the other Party for any kind of indirect nor consequential loss
or damage like, loss of use, loss of profit, loss of production or business interruption which is
connected with any claim arising under the Contract.
98 POLICE VERIFICATION OF CONTRACT STAFF AND TRANSPORT CREW AT
The Contract staff should submit the following documents for enabling them to
enter the location:
i) Police verification certificate issued by the police (PVC)
ii) Photocopy of Aadhaar Card (Original to be cross checked)
iii) Assurance certificate from the Vendor / Contractor /transporter
The contractor shall not at any time do, cause or permit any nuisance on site or do anything which
shall cause unnecessary disturbance or inconvenience to Corporation, tenants or occupiers of
other properties near the site and to the general public.
100 BUILDING AND OTHER CONSTRUCTION WORKERS CESS:
i) Bidders to note that under Building and other Construction Workers Welfare Act (Re & CS)
Act 1996, Cases is applicable to contracts executed outside Factory Area (e.g. construction
of new industrial installation, office & residential buildings etc.) as per the provisions
applicable under ‘The Building and Other Construction Workers Welfare Cases Act 1996’.
ii) The contractor must be registered with the concerned authorities under the Building and other
Construction Workers‟ (RE&CS) Act, 1996 or in case of non-registration; the contractor
should obtain registration within one month of the award of contract.
iii) The contractor shall be responsible to comply with all provisions of the Building and Other
Construction Workers‟ (RE&CS) Act, 1996, the Building and other Construction Workers‟
Welfare Cases Act, 1996, the Building and other Construction Workers‟ (RE&CS) Rules,
1998 and the Building and other Construction Workers Welfare Cases Rules,
iv) Cases, as per the prevailing rate (presently 1%), shall be deducted at source from bills of the
contactors by the Engineer-in-Charge and remitted to the “Secretary, Building and other
Construction Workers Welfare Board” of the concerned State.
v) The contactor shall be responsible to submit final assessment return of the Cess amount to
the assessing officer after adjusting the Cess deducted at source.
MEMORANDUM OF AGREEMENT
An agreement made this day of 20 between Bharat Petroleum Corporation Limited a
Company Incorporated in India and having its registered office at Ballard Estate, Mumbai, (herein after
referred to as ‘the Company’ which expression shall include its heirs, legal representatives, successors
and permitted assignees) of the one part, and
(Here in after referred to as “The Contractor” which expression shall include its heirs, legal
representatives, successors and permitted assignees) of the other part, whereby it is agreed:-
1. The Contractor shall carry out and complete the work as mentioned in the Purchase order/Contract
dated , (hereinafter referred to as “the work”) for the Company at its specified site
to its complete satisfaction in accordance with the specifications, schedule of rates and plans attached
as per Purchase order/Contract and with the instructions given from time to time, by the Company’s
authorized engineer under whose supervision the work shall be-executed. The parties hereto agree that
this agreement shall be effective from the date of the aforesaid Purchase Order/Contract.
2. Inspection of site: The Contractor has been given an opportunity before or at the time of the entrusting
of the work to him of making an inspection of the site to set at rest any doubt he may have had about
the difficulties attending his offer, and any difficulties which may be met with by him in the course of
the execution of the work shall neither relieve him from fulfilling the terms of this Agreement, nor
entitled him to claim extra payment or an extension of the period stipulated for the completion of the
work, except where it will be agreed by the Company’s authorized Engineer that such difficulties could
not have been foreseen.
3. Supply of Labor and Materials: The Contractor shall furnish all labor materials, equipment or tools
necessary for the construction of the work, except such materials, equipment or tools as will be supplied
by the Company and are detailed in Purchase order/Contract. The contractor will assume full
responsibility for the protection and safety of the work during its construction. The details and
dimensions shown on the said plans referred to in the Purchase order/Contract shall be strictly adhered
to by the contractor and no alterations shall be made therein unless previous sanction thereto has been
given in writing by the Company.
(a) The Contractor shall prepare detailed and shop drawings and any other data required.
(b) All materials supplied by the Contractor shall be of the best quality. The Contractor shall at his
own cost arrange for and/or carry out any test of materials, which the Company’s authorized
Engineer may require.
(c) The Contractor shall at the request of the Company’s authorized Engineer immediately dismiss
from the work any person employed thereon who, in the opinion of the Company’s authorized
Engineer, is unsuitable or incompetent or who, has been guilty of misconduct, and such person
shall not again be employed or allowed on the works without the permission of the Company, in
4. E. & O. E. No advantage is to be taken either by the Company or the Contractor of any clerical error
or mistake, which may occur in the specification, schedule of rates, plans, tender or any other papers
supplied to or by the contractor in connection with the work.
5. Damage on account of Incomplete work: The Contractor shall commence the work and shall complete
the work as mentioned in Purchase order/Contract failing which the Contractor shall pay or allow to
the Company to recover as liquidated damages, at the rate of minimum 0.5% per week of delay or part
there of up to a maximum of 5% of the total contract value, if Liquidated damages clause is made
applicable in the contract. Such damages may be deducted by the Company from any amount due to
the contractor; otherwise they shall be recoverable by lawful means.
6. a) Determination of the Agreement: The Company shall, at any time, be entitled to determine and
terminate the contract, if in the opinion of the company, the cessation of the work becomes necessary
owing to paucity of funds or for any other cause whatsoever. On such determination / termination, the
cost of approved materials,
brought by the contractor and lying at the site, at current market rates as verified and approved by
company’s engineer and of the value of the work done to date by the contractor shall be paid for in full
at the rate specified in the contract. A notice in writing from the company to the contractor of such
determination and termination and reasons therefore shall be the conclusive proof of the fact that the
contract has been so determined and terminated by the company.
Should the contract be determined as above and the contractor claims payment to compensate
expenditure incurred by him in the expectation of completing the work, the company shall consider
and admit such claim as are deemed fair and reasonable and are supported by the vouchers to
satisfaction of the engineer-in-charge. The company’s decision on the necessity and propriety of such
expenditure shall be final and conclusive and binding on the contractor.
The contractor shall not be entitled to get any possible loss of profit that he could have earned had the
contract been not determined / terminated under the above clauses of this article.
b) Termination/Offloading: The contractor fully understands that timely completion of the work as per the
schedule is of paramount necessity as otherwise it would lead to adversely affecting the schedules of
other works/project with resultant financial and other losses to the Company. In view of this, the
contractor unconditionally agrees and binds himself to be liable for all the consequences for non-
completion of the work within the stipulated time.
In case a situation is brought about by the contractor warranting termination/off-loading of the whole
or any part of the work for any reason whatsoever, the Company shall have the liberty and right to
entrust/engage/award the work so terminated off loaded at the risk and cost of the contractor to any
other agency/contractor by adopting any mode of inviting tenders, i.e. open/limited/single
party/negotiation basis etc. in order to ensure completion of the work as per the schedule or at the
quickest possible time.
7. Defective Work / Materials: If the work done by the Contractor or any part there of shall be found
defective in workmanship or by reason of bad or inferior materials used, then in such case he shall at
his own risk and cost without delay, demolish all such defective work and rebuild or replace the same
in a satisfactory manner. The Company may, if necessary, at the cost and risk of the Contractor,
temporarily stop all other activities by the Contractor in connection with the work until such time as
the defective work has been rebuilt or replaced at the Contractor’s cost. In case of default on the part
of the contractor to remove defectives work and rebuild or replace the same without delay and in a
manner satisfactory to the Company, the Company shall be entitled to employ another Contractor or
its own workman to carry out the removal and rebuilding or replacing at the risk and cost of the
8. Substitution of Contractor : If the Company finds it necessary to employ a person or persons for the
purposes provided in clauses 6 (b) and 7 above, then the Company may deduct and retain from out of
the sums due to the contractor all such amounts as they may require to pay or to reimburse themselves
there from in respect of the costs and expenses which they have incurred in completing the work and
or in removing defective work and rebuilding or replacing the same in a manner satisfactory to the
Company and if such amounts be more than the sums due or thereafter becoming due to the Contractor,
than the balance, shall be a debt recoverable from the Contractor by the Company. The Contractor shall
not in any manner do or cause to be done any act, matter or things whatsoever to prevent the person or
persons so employed by the Company from removing defective work and re-building or replacing the
same in a manner satisfactory to the Company and/or from, completing the work in the manner
9. Removal of Material: On the Determination of the Agreement as referred to in Clause 6, the Contractor
shall at his own risk and cost remove from site within Seven days all his materials, equipment and tools.
It is agreed that in case of such determination the company shall be entitled to purchase from the
Contractor such materials as will be approved by the Authorized Engineer of the Company at the prices
then current. If the Contractor does not remove the other materials, equipment and tools which he has
been asked to remove within the time prescribed as aforesaid, the Company may remove and sell the
same holding the proceeds less the cost of storage, removal and sale to the credit of the Contractor.
Should Company incur any loss in respect of the sale, it shall be entitled to recover same from the
10. Inspection of work: Inspection will be made periodically during the progress of the work by the
authorized Engineer of the Company and all work performed must be of acceptable quality of which
the said Engineer-in- Charge will be the sole judge.
11. Supervision: The Contractor shall during the whole time the work is in progress, employ one or more
competent and technical English speaking Supervisors acceptable to the Company’s authorized
Engineer, one of whom at least shall be in constant attendance at the site while persons are at work
there. Any directions, explanations, instructions, or notices in connection with the work given by the
Company’s authorized Engineer to these Supervisors shall be deemed to have been given to the
12. Payment: The Company, in consideration of the contractor carrying out and completing the said work
at the Company’s said site, to the satisfaction of the Company, shall pay the contractor as per the said
schedule of Rates, subject to deductions, retentions and abatements, if any to be made therefrom in
accordance with the provisions of this Agreement. During the progress of the work and provided the
work is progressing according to the time-table laid down to the contractor, the contractor shall be
entitled once a month to receive advance payment on the above mentioned sum proportionate to such
part of the work as shall have been executed during the preceding month but only after such part of the
work as has been executed has been inspected and approved by the Company’s authorized Engineer.
From such interim payments each time 10% will be withheld as Security deposit and this 10% will be
paid to the Contractor after the defect liability period, provided that any defects appearing during that
period are corrected by him.
100% payment will be made on the basis of actual executed quantities after satisfactory completion and
due certification by BPCL Engineer-in-charge. In lieu of 10% Retention money towards Security
deposit, contractor shall submit bank guarantee of equivalent amount of retention money (10% of
contract value) before submission of 1st Running Account (RA) bill valid for defects liability period
specified. Further, the Bank Guarantee shall have a claim period of six months beyond the date of
expiry, and the same shall be mentioned clearly in the Bank Guarantee.
13. Defects after Completion: Any defects which may appear within the defect liability period specified
shall, upon the directions in writing of the Company and within such reasonable time as shall be
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2198.pdf
pdf • 7.42 MB
BUDGETDOC_2198.pdf
pdf • 5.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .