Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.1 LAccepted-Finance METRO HEIGHTS 2ND FLOOR SEVOKE ROAD SILIGURI | SILIGURI | ₹43.1 L | L1 | Accepted-Finance QUOTED LOWEST |
| 2 | L2₹43.8 LRejected-Finance 21 SISIR BAHADUR SARANI KHUDIRAM PALLY SILIGURI 734001 | SILIGURI | JALPAIGURI | WEST BENGAL | 734001 | ₹43.8 L | L2 | Rejected-Finance QUOTED SECOND LOWEST |
| 3 | L3₹44.8 LRejected-Finance | ₹44.8 L | L3 | Rejected-Finance QUOTED THIRD LOWEST |
Tender Value
₹43.1 L
EMD Value
₹86,205
Closing Date
16 Mar 2026, 10:00 amClosed
EXECUTIVE ENGINEER
KURSEONG IRRIGATION DIVISION
CONSTRUCTION OF PROTECTION WALL ALONG WITH C.C. DRAIN AND C.C. ROAD AT BICH KAMAN MUNGPOO IN KURSEONG
2026_GTA_991649_21
GTA/EE/KSID/NIeT-09/2025-26
Open Tender
CIVIL WORKS
120 days
KURSEONG
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹86,205
5 Jun 2026
5 Mar 2026
18 Mar 2026
5 Mar 2026
16 Mar 2026
5 Mar 2026
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches,levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm.
Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
Supply of Stone Boulder 150 mm of N.B. variety
Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety In ground floor (a) 1:3:6 proportion
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In- Charge.
Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. (i) (1:3:6) proportion
Add 18% GST
Add 1% Cess
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
Tendernotice_2.pdf
PDF • 0.12 MB
BOQ_2501589.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid