Tender Value
₹25.6 Cr
EMD Value
₹51.1 L
Closing Date
26 Jun 2026, 3:00 pm
(1) Bhestan - Extension of NIYOL- BHET By pass line to UP Loop with provision of extension of DN Loop upto S-5 UDN. (2) Track work in connection with Surat:- Construction of New TRIP shed.
BCT-26-27-53
BCT-26-27-53
Open
15 Months
Surat, Gujarat
₹0
₹51.1 L
3 Jun 2026
3 Jun 2026
12 Jun 2026
C-USSOR 2021 items - Track related items 27582836.68 Below/P
E-NS items related to works portion 12975747.32 Below/P
F-NS items related to track portion 967403.40 Below/P
Item Breakup - A-All DSR 2021 items
Item Breakup - B-USSOR 2021 - Works related items
Preparation of foundation for 100 Embankment by clearing, grubbing, Sqm stripping top soil (average 150 mm) and stacking beyond foundation area, thereafter ploughing and pulverizing 150 - 200 mm of top of soil with tractor trolley, mixing water to achieve OMC with water sprinkler or left for natural drying, as required, and compaction with vibratory roller of suitable capacity to achieve 98% MDD for laying first layer of soil for embankment construction. Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, mechanical compaction to specified density and dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. 2) Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines.
Using Soil Class SQ3
Mechanical blanketing material by using only hard and durable stone crushed in mechanical crusher to different gradations, wet mixing of the same in designed proportion in Pug mill or wet mix plant to have uniform gradation including all incidental transportation, laying over finished formation in uniform layer(s) with motor grader, compaction with suitable vibratory roller to specified density and finishing to correct profile, complete as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest correction slips. Note: This item shall be used only when entire constituent of blanketing material is mechanically manufactured by crushing of hard and durable stone into desired gradation of designed proportion. MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY Providing portable fencing along running track where work is to be done in close vicinity of track, maintaining during execution of work and removing after completion of the work as per direction of the Engineer. Fencing shall consist of self supporting steel angles of size 50mm x 50mm x 6mm, 1.5m long provided with hooks etc. and embedded in CC 1:2:4 block of size 0.23m x 0.23m x 0.23m placed at c/c distance of 2m along track. 12mm dia rods in three horizontal layers shall be tack welded with angle posts. Note : Released material will be property of the contractor after completion of work. Cost of cement required for CC blocks shall be paid separately.
With provision of one 50mm wide Metre retro-reflective tape in horizontal direction, duly secured/tight with vertical posts. Total 97387041.83 Item- 2 Chapter 2 : Excavation for bridge sub structure S No. Item No Description of Item Unit Qty Rate Amount Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.
All kinds of soils Total 274095.48 Item- 3 Chapter 2 : Concrete related items S No. Item No Description of Item Unit Qty Rate Amount MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY
Providing and laying in position cum machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved p l a n t s ) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation & Pile cap including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as p e r specifications and direction of t h e Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
Abutment & Pier
Approach slab at formation level, cum Dirt wall/ ballast wall at formation level MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY
Providing and laying Plain Cement cum Concrete 1:3:6 with graded stone aggregate of 40mm nominal size, in foundation and floors, retaining walls of bridges including mechanical mixing, vibrating, pumping and bailing out water where ever required with all materials and labour complete but excluding the cost of cement and shuttering as per drawings and technical specifications as directed by Engineer.
P r o v id in g and casting machine cum batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix, mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants, (Cast in-Situ/Pre-cast) in bottom/top slab, side walls, toe wall and sumps haunch filling head walls, thrust bed or any other component using 20mm graded crushed stone aggregate and coarse sand of approved quality of RCC box of any size including finishing, Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability, complete as per drawings and technical specifications as directed by Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item.
Providing and applying two coats of Sqm coal tar or bitumen confirming to IS:3117- latest version on the top and sides of RCC box/slabs @ 1.70 kg/sqm after cleaning the surface with all labour and materials complete job as directed by the Engineer. Centering and shuttering including strutting, propping etc. and removal of form for :
All types of bridge sub-structures, Sqm e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY
Providing and launching in position cum machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the Precast Prestressed (Post- tensioned) Concrete Girder/Box Girders/Slabs in contactor's casting yard in the vicinity of worksite, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability, complete as per drawings, specifications and direction of the Engineer. Note: 1. Payment for Shuttering, Cement, Reinforcement, HTS cables, Sheathing, Anchorage Cones, stressing of cables, grouting of the ducts and launching of girder/slab in position shall be made extra under relevant items. However, deduction shall be made in case of slab as per relevant item. 2. For pre-cast item, loading in transport vehicle in casting yard is included and shall not be paid extra. 3. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item. Total 11653932.63 Item- 4 Chapter 2: Pile related items S No. Item No Description of Item Unit Qty Rate Amount MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY Boring, providing and installation of bored cast in-situ Reinforced Cement Concrete piles using Hydraulic piling Rig of specified diameter and length below pile cap of specified grade with Design Mix Cement Concrete, using 20mm graded crushed stone aggregate and coarse sand of approved quality, to carry a safe working load not less than specified, concreting by machine batching, machine mixing, scaffolding, using Admixture in approved proportion (as per IS:9103), placing with tremie pipe, chipping off of pile top to remove laitance concrete above cut off level etc., pumping and bailing out water complete in all respect as per approved drawing, specification and direction of the Engineer in charge. N o t e : 1. Payment for only cement, reinforcement shall be made extra. 2. Length of the pile for payment shall be measured up to the bottom of RCC pile Cap. 3. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
1500 mm diameter
Providing, fabricating and installing MT permanent casing pipe for bored piles for all diameters with specified thickness of steel plate including all labour, materials, tools & complete as per approved drawing & specifications complete in all respect as per the direction of Engineer in charge. Note: Payment shall be made as per the weight of circular plate of casing pipe only. Total 9484570.00 Item- 5 Chapter 2: Supply of cement S No. Item No Description of Item Unit Qty Rate Amount Supply and using Cement at Worksite
Ordinary Portland Cement 53 grade MT of approved brands/makes Total 7428649.78 Item- 6 Chapter 2: Steel reinforcement S No. Item No Description of Item Unit Qty Rate Amount Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.
Thermo-Mechanically Treated bars Kg of grade Fe-500D or more of approved brands/makes. Total 14234776.34 MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY Item- 7 Chapter 5 : Bridge works misc. S No. Item No Description of Item Unit Qty Rate Amount
Supply and laying of quarry dust cum including consolidation, supply of all materials, labour, lead, lift, tools, plants, crossing of tracks as per drawing and technical specification as directed by the Engineer in charge in case loose slush is encountered at site of foundation before casting the foundation or laying the filtering media.
Supply and laying of coarse sand cum including consolidation with all labour, lead, lift, tools, plants, crossing of tracks as per drawing and technical specification as directed by the Engineer in charge in case loose slush is encountered at site of foundation before casting the foundation or laying the filtering media. Providing & laying non pressure NP- 4 Class RCC pipe with collars, jointing with 1:2 cement and ordinary sand mortar including testing of joints, but excluding earthwork with all labour and material as a complete job. Cement for mortar will be paid separately. (Pipes of 600mm dia and above will be laid using crane/hydra).
900mm dia. Total 5361213.90 Item- 8 Chapter 21: Misc items S No. Item No Description of Item Unit Qty Rate Amount Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site.
JCB Backhoe Loaders 3DX Plus or Hour similar with minimum 1.10 cum bucket capacity
Hydra or similar tyre mounted Pick- Hour n-Carry crane of 12T capacity for misc. works of handling of material
Tractor with Trolley for transportation or other misc. works. MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY
Arranging labour as and when Day required by the Engineer in charge, for various works under SSE/P.Way, with contractor's T&P, equipments, hand signal flags, etc. as per specifications, special conditions and detailed scope of work as furnished in the tender and as directed by the Engineer in charge. Note: Item shall be operated with prior approval of concerned Sr. DEN / DEN in charge.
Supplying and filling 50 kg size Each empty cement polythene bags with Rly. Ballast/moorum/earth/Sand/quarry dust etc. placing the filled bags on the high banks /bridge approaches/nominated place etc. dumping and spreading at the nominated locations to profile under block period with all contractor's labour, tools, plants, loading, unloading, filling, spreading including all lead/lift etc. complete and as directed by the Engineer in charge at site including crossing of track where necessary. Total 8969894.00
Item Breakup - C-USSOR 2021 items - Track related items
Up to 40 m long rail panel Insertion of rails of all types & length in track, laid on any type & density of sleeper to the specified gauge under traffic block. Rates include fastening of rail with sleepers with standard set of fastenings and fixing of fish plates and bolts or, if required, providing gap for welding and stacking of released material without infringement within 250m as directed by Engineer-in-Charge. Note: Rail drilling and cutting to be paid separately.
For Through Rail Renewal work MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY Through Sleeper Renewal (TSR) with PSC sleepers involving removal existing sleepers of any type along with fittings from track, insertion of PSC sleepers lying along the cess / formation / slope / toe within 5 metres height with all fittings to specified spacing, gauge and squareness, one round of through packing to make track fit for 20 kmph speed, dressing of ballast to standard profile, all in accordance with the latest provisions of IRPWM and stacking of all released material neatly at specified places within an average lead of 100 m as directed by Engineer in-charge.
For location of work not involving Each deep screening Fixing of fish plates with fish bolts on a joint of all rail sections duly lubricating fish plates/bolts with contractor's grease graphite in running track condition including transportation of fish plates and fish bolts from nearest station / store / level crossing. Note: Rail cutting & drilling to be paid separately.
Fish plates of 6 bolts.
Through Fitting Renewal (TFR) on Sleeper PSC track, comprising of renewal of Grooved Rubber Pads, Liners and ERCs without damaging PSC sleepers. Scope includes removal of all fittings, cleaning of rail seat, rail flange at liner seats, and eye of Inserts with wire brushes and applying Grease Graphite Grade "O" (IS:408) to eye of insert and central leg of ERC with contractor's grease of Railway's specification, fixing all fittings in correct position and sealing liner edges with grease all complete including collection and stacking of released materials at nominated locations within SSE Jurisdiction as directed by Engineer-in-Charge. Note: All the fittings will be supplied at SSE/Stores/Depot. MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY
Lubrication of ERCs and its liner ERC contact area by removal of ERCs and Metal / GFN liners in rail panel, cleaning of rust / scale of ERC, Metal / GFN liners & SGCI insert by using wire brush, scrapper / sand emery paper etc supply and application of graphite grease, as prescribed by Railway for under side of liners & corresponding area of rail foot & SGCI insert with ERCs and re-fixing the same as per procedure prescribed in latest edition of IRPWM with contractors grease and all other tools & plants complete and as directed. Note: Each ERC in this item shall constitute 1 ERC and its Liner Contact area. Cutting / cropping of rail of 60Kg - 90 UTS, manually and perfectly vertical with contractor's labour, hacksaw blade and tools & plants - Note: 1.Manual cutting should be used only in emergencies with prior permission of sectional ADEN where machine cutting can not be arranged in time. 2. Cutting of Rails with blade and forcing to part by using other means to break the rails is prohibited. 3.Rails should be cut right through hacksaw blades only.
In-situ situation Drilling of hole of different diameter and chamfering, in rail of any section and any UTS manually only in emergencies with contractor's labours, tools & plants, consumables etc.
Hole of dia. 26.5mm and above
Hole of dia. below 26.5mm Gas cutting of rail of various sections with contractor's tools & plants, as directed by engineer in- charge :
Rail section of 52Kg and above Total 8363474.34 Item- 2 Chapter 7 : Turnouts and Renewals S No. Item No Description of Item Unit Qty Rate Amount Assembling all types of Switches on staging, clear of infringements, to correct gauge and alignment as per standard drawings with all types of rail sections over PSC sleepers at specified locations, duly leading rails, special sleepers, switches with a maximum lead of 500m, all lift & crossing of track as required including cutting, drilling, fixing of all components, fittings etc. with housing of tongue rails as per requirement of signaling including lubrication of fittings/fastenings, complete in all respect. Note: Required P.Way fittings shall be supplied at SSE/P.Way stores. MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY
1 in 12 Turnouts Assembling on temporary staging and insertion of all types of turnouts including diamond crossings and derailing switches on prepared ballast bed during traffic block, manually or by contractor's cranes, at specified location with 52Kg / 60Kg rail section on PSC sleepers with Railways rails/sleepers available anywhere within 500m as per standard drawing, duly leading sleepers, rails, switches, crossings, fastenings etc. including rail cutting, drilling, fixing of all components, fittings etc. with housing of tongue rails as per requirement of signaling including crossing of track, filling and spreading of ballast in crib and shoulder as required, linking of turnout with existing track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed including lubrication of fittings/fastenings, complete in all respect and as directed by Engineer in-charge. Note: Required P.Way fittings shall be supplied at the SSE/P.Way stores.
1 in 12 Turnouts
Derailing Switch Laying and linking all types of turnouts, diamond crossings and Derailing switches with 52Kg / 60Kg rail section on PSC sleepers on ballast bed, prepared after dismantling & removal of existing turnout/normal line during TTR/yard remodeling under traffic block, as per standard drawing, duly leading sleepers, rails, switches, crossings, fastenings including rail cutting, drilling, fixing of all components, fittings with housing of tongue rails as per requirement of signaling, preparing ballast bed, filling and spreading of ballast as required, linking of turnout with track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed including lubrication of fittings/fastening, complete as directed by Engineer in-charge. Note: Payment for dismantling & removal of existing turnout/normal line, transportation/stacking of released material and preparing of ballast bed is not included in this item and shall be paid under relevant item.
1 in 12 Turnouts
Derailing Switch MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY Assembling on temporary staging and insertion of all types of switches including TWS on prepared ballast bed during traffic block, manually or by contractor's cranes, at specified location with 52Kg / 60Kg rail section on PSC s l e e p e r s with Railways rails/sleepers available within
duly leading sleepers, rails, switches, fastenings etc. including rail cutting, drilling, fixing of all components, fittings etc. with housing of tongue rails as per requirement of signaling etc. including preparation for operation of traffic block, including crossing of track, filling and spreading of ballast in crib and shoulder as required, linking with existing track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed lubrication of fittings/fastenings, complete as directed by Engineer in-charge. Note: Required P.Way fittings shall be supplied at the SSE/P.Way stores.
1 in 12 Turnouts Lifting for increase in ballast cushion of existing points & crossing layouts up to 75mm or part thereof including approach and exit sleepers including one round of through packing, correcting the disturbed sleeper spacing, tightening of fittings, boxing of ballast and ramping out on either side at slope not steeper than 1 in 1000 or as directed. Note: Item will be paid only when lifting is 50mm or more.
1 in 12 Points & Crossing
Derailing Switch Lifting the newly inserted BG 60 Kg. / 52 Kg. turnouts/ trap switches to required level to provide full ballast cushion as per approved drawings after initial laying with Railway's stone ballast in convenient stages including one round of through packing after completion of final stage of lift, levelling, aligning, gauging and boxing to standard profile to make it fit for 20 kmph with all lead and lifts, complete in all respect and as directed by the Engineer-in-charge. Note: 1. The item shall be used only when UNIMAT is not available for the work before the turnout is opened for operation. 2. Leading and dumping of ballast will be paid separately under relevant item.
For 1 in 12 Points & Crossing
For Derailing Switch MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY Casual renewal of PSC sleepers on points and crossings, derailing switches and diamonds portion of any layout including packing under new sleepers. All the released materials shall be stacked at specified location in a countable manner within the lead of 250m & all lift, clear of infringements, crossing of track, if any complete, as directed with contractor's vehicles, consumables, stores, labour etc. complete, as directed by Engineer in-charge. Note: Approach and Exit sleepers shall be paid as normal sleepers under relevant item.
Sleepers up to 2.85 m length
Sleepers of length more than 2.85 Each m and up to 4.20 m
Sleepers of more than 4.20 m Each length Renewal of CMS Crossing of all rail sections with CMS crossing or with WCMS crossing complete with fastenings including replacement of worn-out rubber pads, liners and ERC, as required. All the released materials shall be stacked at specified location in a countable manner within the lead of 500m & all lift, clear of infringements, crossing of track, if any complete, as directed. with contractor's vehicles, consumables, stores, labour etc. complete, as directed by engineer in-charge. Note: Rail cutting and drilling shall be paid separately under relevant item.
1 in 12 Turnout Renewal of Switch Rails (Tongue rails, Stock rails and fittings) of all rail sections, under line block conditions ensuring proper housing & changing of stretcher bars and fittings as required. Work also includes drilling of hole, if any, and leading of rails laying anywhere in station yard to site of work. Released switch rails shall be stacked at indicated place in a countable manner within the lead of 250m & all lift, clear of infringements, crossing of track, if any complete, as directed. with contractor's vehicles, consumables, stores, labour etc. complete, as directed by engineer in-charge. N o t e : 1).One set means Two Tongue rails and Two Stock rails (2) One tongue & stock rail shall be considered as 1/2 set. (3) One tongue rail or one Stock rail shall be considered as 1/4 Set.
1 in 12 Switch Assembly MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY Lifting for increase in ballast cushion of existing points & crossing layouts up to 75mm or part thereof including approach and exit sleepers including one round of through packing, correcting the disturbed sleeper spacing, tightening of fittings, boxing of ballast and ramping out on either side at slope not steeper than 1 in 1000 or as directed. Note: Item will be paid only when lifting is 50mm or more. 16 073012(073017) Extra over item nos. 073011 to Each 12.00 2931.89 35182.68 073015 for additional lift beyond 75mm for every 50mm or part thereof up to 225mm for each set [RATE = 15%] Total 3372137.64 Item- 3 CHAPTER - 8 : Deep Screening and Ballast Related Activities. S No. Item No Description of Item Unit Qty Rate Amount Manual deep screening of Plain track/ turnouts as per procedure prescribed in IRPWM, June 2020 or latest, on PSC sleepers of any density and throwing away screened muck arising out of screening on toe of bank or on cess, if low or on spoil banks above top of cutting (including throwing and leveling, if required beyond minimum 5m from the edge of cutting which are up to 3m deep or alternatively carting it up to 50m for disposing it off beyond cutting or platforms) as per direction of Engineer in-charge, including cutting cess for effective drainage on both sides, one round of kutcha packing with screened ballast and further attending to track parameter to make track fit for 20 kmph speed complete in all respect. Note : Payment shall be made for length along main line only for turnouts.
Depth of 250 mm below bottom of TRM sleeper - For Plain Track :
Boxing and profiling of ballast as TRM per procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. Total 5867999.00 Item- 4 Chapter - 12 : Activities at Construction Sites S No. Item No Description of Item Unit Qty Rate Amount MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY
Construction of Sanded Dead End Each as per RDSO's Drawing no. RT-347 (with all amendments) with brick- work using country bricks or CC bricks in mud mortar and filling with river coarse sand, surrounding rails and filling around. Note: Cost of brick and sand is not included in the rate. Total 11719.00 Item- 5 CHAPTER - 13 : Maintenance Activities S No. Item No Description of Item Unit Qty Rate Amount Through packing of track, as per procedure prescribed in latest edition of Indian Railways Permanent Way Manual
For PSC sleeper Track with Sleeper TRM Density of 1540 Sleepers/Km or more Picking up of slacks in track of all sleeper density, duly opening up ballast, gauging, alignment, correcting longitudinal & cross levels, packing, boxing of ballast and dressing the same under traffic conditions as per procedure prescribed in latest edition of IRPWM and as directed by Engineer in-charge. Note: In-charge section Engineer should identify locations requiring packing and obtain prior approval of DEN/XEN before execution of the work when there is no Zonal Track Maintenance agency deployed in the section.
For PSC Sleeper Fixing Joggled Fish Plates with bolt / clamp (supplied by Railway from nearest SSE Store) in running track conditions at welds on rail, as directed by engineer in-charge (drilling of holes in rail, if required, shall be paid separately).
With 2 bolts Maintenance of track on main line & loops, Points & crossings etc. including special attention to section for carrying out various maintenance works listed in Indian Railways P.Way Manual / Bridge Manual for safe running of goods and passenger trains with contractor's tools / labours etc. complete, as directed by Engineer in-charge. Note: Contractor shall arrange one gang at any point of time comprising of minimum specified labours with sufficient experience in P.Way working. MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY
One mobile Gang comprising of 15 Gang physically fit labours plus 1 Mate. Day N o t e : (1) In case, contractor provides less no. of Labour/Mate or for non availability of vehicle, payment will be deducted for each such person or non-availability of vehicle @ 20% of the accepted item rate, separately for each shortfall. (2) The Contractor shall keep one pick up Truck of minimum 1.5T payload capacity with Driver all the time and all expenditures for running at an average of 80 kms per day shall be born by the Contractor. Total 2700255.90 Item- 7 Chapter - 17 : Handling of Materials (Transportation Of Materials). S No. Item No Description of Item Unit Qty Rate Amount Loading of rails of any section and length up to 13 metres in Wagons / Truck / trailer including lead up to 50 metres and lift up to 5 metres.
I n Wagon handling is possible a n d traffic block is not required or in Truck/trailer. Loading of tongue rail, stock rail, switch assembly and crossings of any section and length, SEJ, Glued joint etc. with / without P.Way fittings and fastenings, in Wagon / Truck / trailer including lead up to 250 metre and lift up to 5 metre.
I n Wagon handling is possible a n d traffic block is not required or in Truck/trailer. Loading, leading and unloading of 52Kg / 60Kg rail up to 13 metre length by Railway's Rail Dolly / Dip Lorry to the nominated location under traffic with line protection in case road carriage is not possible with different lead with a lift up to 5 metre during block period.
For lead up to 500 metre.
For lead beyond 500 metre and up MT to 1 Km.
Extra to Items no. 171032 for lead MT beyond 1 Km for every subsequent Km or part thereof and up to 10 Km Loading, unloading and hauling of 52Kg / 60Kg rail more than 13 metre and up to 39 metre length by Railway's Rail Dolly / Dip Lorry to the nominated location under traffic and line protection in case road carriage is not possible for different leads and lift up to 5 metre.
For lead up to 500m
Extra to Item no. 171041 and MT 171042 with contractor's Rail Dolly / Dip Lorry MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY Unloading of rails of any section and length up to 13 metre, in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/trailer including lead up to 50 m e t r e , lift up to 5 metre and stacking in prescribed manner.
From Wagon where mechanical MT handling is possible a n d traffic block is not required or in Truck / trailer. Unloading of all type of rails of length 130 metre and beyond from end unloading rake and keep the panels in head-up position at specified distance from centre of track clear from any infringement.. Note: Contractor has to keep Oxygen and Acetylene gas with cutter as standby during the period of work.
During period of traffic block Loading, leading and unloading of PSC Sleepers of 52Kg / 60Kg by Railway's Rail Dolly/ Dip Lorry to the nominated location under traffic in case road carriage is not possible for different leads and lift up to 5 metres.
For lead up to 500 metres
For lead beyond 500 metre and up MT to 1 Km
Extra to Items no. 172032 for lead MT beyond 1 Km for every subsequent Km or part thereof and up to 10 Km Loading, leading and unloading of all types of P.Way fittings and all other miscellaneous material except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading.
Lead up to 5 Km
Lead beyond 5 Km and up to 10 km MT
Lead beyond 10 Km and up to 20 MT km
Lead beyond 20 Km and up to 30 MT km Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: 1 . Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items.
Lead up to 5 Km
Lead beyond 5 Km and up to 10 km MT
Lead beyond 10 Km and up to 20 MT km
Lead beyond 20 Km and up to 30 MT km MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY
Lead beyond 30 Km and up to 50 MT km
Lead beyond 50 Km and up to 100 MT Km
Lead beyond 100 Km and up to 150 MT Km
Extra for every Km per MT beyond MT-Km 100000.00 150 Km over item no. 172057 Unloading of 52kg / 60kg PSC line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 250 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied.
From Truck / Trailer Unloading of 52kg / 60kg PSC special sleepers beyond 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 50 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied.
From Truck / Trailer Unloading of Switches / Crossings / SEJ Rails / Glued Joints of any rail section and length with or without P.Way fittings & fastenings in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with lead up to 250 metre & lift up to 5 metres.
From Truck / Trailer Total 5033296.12
Item Breakup - D-Supply of ballast on cess
When distance of nearest quarry is cum up to 10 km Total 14889336.00
Item Breakup - E-NS items related to works portion
Uncoursed hand picked dry rubble cum filling (in work like rubble filling behind abutments etc.) without any special dressing of stones. Total 508269.12 Item- 2 Shoring for the protection against slope failure as per site condition S No. Item No Description of Item Unit Qty Rate Amount
Shoring for the protection against Sqm slope failure as per site condition with sufficiently rigid frame of structural sheet i.e. with MS angles, channels, pipes, shets/battens etc. with suitable anchoring arrangements/ fixing as and when required as per instructions of Engineer in Charge. Total 87103.20 Manufacture, supply and delivery of precast drains (M50 grade) of Fuji or euivalent make of similar Item- 3 specifications and dimensions. Size: 450x450(mm) as approved by the site engineer. S No. Item No Description of Item Unit Qty Rate Amount
Manufacture, supply and delivery Metre of precast drains (M50 grade) of Fuji or euivalent make of similar specifications and dimensions. Size: 450x450(mm) as approved by the site engineer. Note: The above item includes handling, transportation,unloading, and installation at the designated location as per instructions of the engineer-in-charge, ensuring proper alignment and stability. The rate is inclusive of manufacturing of material, supply, delivery, installation at site, labor, tools, equipment, loading, unloading, and all applicable taxes, complete as per site requirements and instructions of the engineer-in- charge. 100% payment will be released after successful laying & installation of drain segments as per site engineer. Laying of PCC will be paid separately. Total 2653475.00 MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY Manufacture, supply and delivery of precast drains (M50 grade) of Fuji or euivalent make of similar Item- 4 specifications and dimensions. Size: 600x600(mm) as approved by the site engineer. S No. Item No Description of Item Unit Qty Rate Amount
Manufacture, supply and delivery Metre of precast drains (M50 grade) of Fuji or euivalent make of similar specifications and dimensions. Size: 600x600(mm) as approved by the site engineer. Note: The above item includes handling, transportation,unloading, and installation at the designated location as per instructions of the engineer-in-charge, ensuring proper alignment and stability. The rate is inclusive of manufacturing of material, supply, delivery, installation at site, labor, tools, equipment, loading, unloading, and all applicable taxes, complete as per site requirements and instructions of the engineer-in- charge. 100% payment will be released after successful laying & installation of drain segments as per site engineer. Laying of PCC will be paid separately. Total 9726900.00
Item Breakup - F-NS items related to track portion
Unskilled labour component only Per for thermit welding of 52/60 kg rail Joint joints b y SKV process o n l y with c o n t r a c t o r ' s l a b o u r and tools required for the successful completion of work such as loading a n d l e a d i n g o f all required materials, t o o l s a n d p l a n t s for w e l d i n g t o s i t e o f w o r k and d e p o s i t i n g the same after completion, re spacing of sleeper for fixing o f mould a s required for welding, removal of traction bonds, picking of fish plates etc. complete f o r finished i t e m of work. After w e l d i n g h a s b e e n completed joggled fishplate with bolts/clamps and wooden block is to be provided, re-spaced sleeper is to be squared and packed brought back to its proper position before leaving the site as per direction of site supervisor Total 338838.00 Providing battery (rechargeable) operated LED lightening arrangement on hiring basis at work site Item- 2 during night hours S No. Item No Description of Item Unit Qty Rate Amount MUMBAI CENTRAL DIVISION-ENGINEERING/WESTERN RLY
Providing b a t t e r y (rechargeable) Set operated LED lightening arrangement o n h i r i n g basis at work site during night hours i.e minimum 8hrs. (No claim will be entertained at a later stage regarding t h e duration o f block working) w ith 4 n o o f L E D light of 100watt each (lightening of each LED light equivalent to 500watt of Halogen light) during night block. T h e r a t e s a r e in c lu s iv e o f all contractor's equipment, labour for operation, manning, transportation of lightening arrangement a n d its accessories from depot to site of work and back with all lead and lift w i t h c o n t r a c t o r ' s own transportation arrangement. 4no L E D light with fittings with lead wires of 200metre or of required distance with each LED light, spare batteries. consumable, s p a r e and other tools and plants etc. complete a s per the i n s t r u c t i o n of engineering in-charge at site. The unit of work is Set = Per night per set. Total 628565.40
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Typeplanforbarricadingtobeusedinconstructionsite.pdf Barricading at site
ATTACHMENT
3-JPOSTandElectfordiggingwork.pdf
ATTACHMENT
NOrelativecertificate.pdf
ATTACHMENT
ProcedureforpaymentofContractorbillasperGST.pdf
ATTACHMENT
Letterofcreditasmodeofpayment_1.pdf
ATTACHMENT
PCEletterEMDPGSD.pdf
ATTACHMENT
NoRetiredRailwayEmployeeGCCApril2022.pdf
ATTACHMENT
1-Safetyrules.pdf
ATTACHMENT
2-guidelineforelectricalcondition.pdf
ATTACHMENT
Annexure-VIBAnnualContractualTurnover.pdf
ATTACHMENT
PBGProformaGCC2022.pdf
ATTACHMENT
GCC2022ACS10UPDATED_compressed.pdf
ATTACHMENT
Arbitrationletter.pdf
ATTACHMENT
2022-CE-I-CT-GCCCorrespondencedated.14.05.2024.pdf
ATTACHMENT
2024-CE-I-CAOCWorkshop-part-2.pdf
ATTACHMENT
GCCACS11dtd13.03.2026.pdf
ATTACHMENT
Typeplanforbarricadingtobeusedinconstructionsite.pdf
ATTACHMENT
Certificateforballastsupply.pdf
ATTACHMENT
FINALSPLCONDITION020626_compressed.pdf
ATTACHMENT
PCECircularNo71RSimilarNatureofWorks.pdf
ATTACHMENT
Download all tender documents and submit your bid