| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-Finance | ₹3.9 Cr | L1 | Accepted-Finance Being L1 |
| 2 | L2₹3.9 Cr+₹415.98 (<0.01%)Accepted-Finance | ₹3.9 Cr+₹415.98 (<0.01%) | L2 | Accepted-Finance Being L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically non-responsive |
Tender Value
₹3.9 Cr
EMD Value
₹7.8 L
Closing Date
14 Nov 2022, 12:00 pmClosed
Chief Engineer, MOBEDS
Koirengei, SHQ BSF Gate Near Reliance High School, Imphal East
Construction of Drain in Imphal City and Improvement of tiles in Paona Bazar
2022_DMA_1956_1
MOBEDS-04/2022
Open Tender
Civil Works - Roads
Item Rate
180 days
Imphal West
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Member Secretary, MOBEDS
₹7.8 L
28 Nov 2022
28 Oct 2022
14 Nov 2022
28 Oct 2022
14 Nov 2022
28 Oct 2022
Amount
Construction of Drain in Imphal City & Improvement of tiles in Paona Bazar ( Portion -A)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete. a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:-
a) Foundation footings, bases of column etc. and mass concrete
Providing and laying 80 mm thick factory made cement concrete interlocking paver block (Rubber Moulded) of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design / shape laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with coarse sand etc. all complete as per the direction of the Engineer-in-charge.
Construction of Drain in Imphal City & Improvement of tiles in Paona Bazar ( Portion -B)
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete. a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:-
a) Foundation footings, bases of column etc. and mass concrete
Providing and laying 80 mm thick factory made cement concrete interlocking paver block (Rubber Moulded) of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design / shape laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with coarse sand etc. all complete as per the direction of the Engineer-in-charge.
Construction of Drain in Imphal City & Improvement of tiles in Paona Bazar ( Portion -C )
Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift up to 1.5m. including getting out the excavated soil as directed within a lead of 50 m.a) Hard/ Dense soil.
Filling available excavated earth (excluding rock) in trenches, plinth sides of ,foundation etc. in layer not exceeding 20cm. in depth consolidation each deposited layer by ramming and watering lead unto 50m. lift unto 1.5m.
Providing and laying cement concrete in foundation and plinth excluding the cost of ,centering and shuttering in1:2:4 (1cement : 2c/sand: 4 graded stone agro. 40 mm nominal size.)
Reinforced cement concrete work in wall (any thickness) including attached pilasters, buttress plinth and string course fillets, column, pillars, piers, abutments, post and sntrut etc, up to floor five level excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete. a)Thermo-Mechanically Treated bars
Providing form works i/c centering and shuttering so as to give a rough finish, shuttering & propping etc height of propping & centering below supporting floor to ceiling not exceeding 4m & removal of the same for in-situ reinforced concrete plain concrete work in:-
a) Foundation footings, bases of column etc. and mass concrete
Providing and laying 80 mm thick factory made cement concrete interlocking paver block (Rubber Moulded) of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design / shape laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with coarse sand etc. all complete as per the direction of the Engineer-in-charge.
M/S Mingyao Ruivanao and co
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .