| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.5 CrAccepted-Finance PLOT 28 31 SECTOR 5 PHASE II HSIIDC GC BAWAL REWARI MAHENDRAGARH HARYANA 123501 | REWARI | HARYANA | 123501 | ₹4.5 Cr | 1 | Accepted-Finance Ist LOWEST |
| 2 | 2₹5.2 Cr+₹74.8 L (16.6%)Accepted-Finance D 90 OKHLA INDUSTRIAL AREA PHASE 1 NEW DELHI NEW DELHI DELHI 110020 | SOUTH EAST DELHI | DELHI | 110020 | ₹5.2 Cr+₹74.8 L (16.6%) | 2 | Accepted-Finance IInd LOWEST |
| 3 | 3₹5.6 Cr+₹1.1 Cr (25.1%)Accepted-Finance | ₹5.6 Cr+₹1.1 Cr (25.1%) | 3 | Accepted-Finance IIIrd LOWEST |
| 4 | Not Admitted-Fee/PreQual/Technical PO BIRLA VIKAS PO BIRLA VIKAS SATNA MADHYA PRADESH 485005 | SATNA | MADHYA PRADESH | 485005 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.2 Cr
EMD Value
₹4.2 L
Closing Date
7 Apr 2022, 5:00 pmClosed
Superintending Engineer
Electricity Transmission Circle-II, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj
169/ETC-II(P)/ 2021-2022
2022_UPTCL_677110_2
169/ETC-II(P)/ 2021-2022
Open Tender
Electrical Works
Item Rate
120 days
Minto Park Teliarganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
EE,ETD-NAINI,PRAYAGRAJ
₹4.2 L
6 May 2022
10 Mar 2022
8 Apr 2022
10 Mar 2022
7 Apr 2022
11 Mar 2022
Amount
(Location-1) Part-A (Materials)
132 KV, 1Cx1000 sq mm Almunium conductor, XLPE insulated corrugated aluminium seathed power cable.
Normal straight through joint/insulated joint suitable for above cable with all accessories.
Outdoor type complete end termination kit suitable for above cable with all accessories.
Single core 300 sq. mm. copper conductor PVC insulated 3.3 KV grade earthing cable.
Link box for 04 nos. cable termination with without SVL as required.
Single phase link box with/without SVL as required.
Terminal connector.
Concrete slab.
Warning tape.
Route marker
HDPE pipe suitable for above 250 mm.
(Location-1) Part-B (Work)
Route Survey and preparation of drawing including digging of trial pits for specified route length.
Formation of trench less road/railway track crossing with HDPE pipe.
Dismantling of all straight through joint and 04 nos. outdoor termination & dismantling of already laid 132 KV underground cable by excavation removal of slab including & backfilling & leveling of excavated ground.
Shifting of dismantled 132 KV cable from site to substation store including joint & other associated material.
Excavation of trench (800mm width & 1850mm depth).
Laying of HDPE pipe and all four cable through HDPE pipe including transporation of cable drum.
Backfilling of trench with sand, RCC cover, warning tape, route marker, filling & leveling of excavated ground. The work site shall be left as clean as possible.
Installation of straight through joint including earthing
Installation of link box for 04 nos. cable termination with/without SVL.
Installation of outdoor end termination on structure & fixing
Lifting of cable to structure top & placing for termination.
Installation of single phase link box with/without SVL.
Testing & commissioning of cable system.
Civil construction work at joint place by construction of both side wall, floor and covering it by proper size of RCC cover.
(Location-2) Part-A (Materials)
132 KV, 1Cx1000 sq mm Almunium conductor, XLPE insulated corrugated aluminium seathed power cable.
Normal straight through joint/insulated joint suitable for above cable with all accessories.
Single core 300 sq. mm. copper conductor PVC insulated 3.3 KV grade earthing cable.
Link box for 04 nos. cable termination with without SVL as required.
Concrete slab.
Warning tape.
Route marker
HDPE pipe suitable for above 250 mm.
(Location-2) Part-B (Work)
Route Survey and preparation of drawing including digging of trial pits for specified route length.
Formation of trench less railway crossing BY HDD machine with HDPE pipe.
Dismantling of all straight through joint and already laid 132 KV underground cable by excavation removal of slab including backfilling & leveling of excavated ground.
Shifting of dismantled 132 KV cable including joint & other associated material.
Excavation of open trench 02 mtr. Depth as per drawing, laying of HDPE pipe including transportation, loading, unloading from store to site and backfilling trench & leveling at site including cost of warning tap laying & cost of sockrt & jointing.
Laying of all four cable through HDPE pipe including transporation of cable drum.
Backfilling of trench with sand, RCC cover, warning tape, route marker, filling & leveling of excavated ground. The work site shall be left as clean as possible.
Installation of straight through joint including earthing
Installation of link box for 04 nos. cable termination with/without SVL.
Testing & commissioning of cable system.
Civil construction work at joint place by construction of both side wall, floor and covering it by proper size of RCC cover.
KEI INDUSTRIES LIMITED
FINOLEX J-POWER SYSTEMS PRIVATE LIMITED
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .