Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹45.6 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹46.6 L+₹1.0 L (2.22%)Rejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹47.3 L+₹1.7 L (3.74%)Rejected-Finance | L-3 | Rejected-Finance L-3 |
Tender Value
Refer Docs
EMD Value
₹46,000
Closing Date
5 Feb 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
132 KV S/S Ghazipur
Replacement of Gaskets of 200 MVA 400/132KV ICT-I and II (BHEL Make) along with other associated works under Electy. 400KV Sub Station Division, Kasara Mau
2021_UPTCL_545669_1
E-tender No. 62 ETC(GZP)/2020-21
Open Tender
Electrical Works
Turn-key
60 days
Kasara-Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,428
EE ETD Ghazipur
₹46,000
24 Feb 2021
14 Jan 2021
6 Feb 2021
14 Jan 2021
5 Feb 2021
14 Jan 2021
180 days
Amount
Replacement of gasket of 400/132KV 200 MVA ICT-I &II alongwith associated works at Electy. 400 KV Sub Station Kasara, Mau with all cost of men , materials, misc consumables, crane/hydra normal & special T&Ps. rails etc. required for satisfactory completion of work, as per techinical specification & direction of the J.E(M)/A.E (M) as per details below:
Dismantling & safe stacking of mulsifire system of the transfomer. The scope of the work involves opening of nuts, bolts, pipes, nozzles etc. and stacking of all the dismantled items at proper place along with other associated works.
Shifting & carriage of 2 No. oil storage tank (50/20KL) & empty T/F oil drums from Electy. 400 KV Kasara, Mau open stor to near 200 MVA ICT-I&II . The scope of the works involves shifting & Loading of oil tanks & empty T/F oil drum at proper place alongwith other associated works.
Removel of jumpers of HV/LV/IV side of 200MVA ICT-I&II , the scope of work involes opening of bolts & nuts and removel of Jumpers, bushing clamps etc.
Draining of T/F oil from transformer into empty oil tanks/oil drums and stacking them at proper place.
Arrangement of 1No.20-35 Ton capacity mobile crane along with crane operator of work at site, with all cost of material ,consumable such as diesel, lubricating oil etc. till the completion of gasket replacement work.
Providing of dry air at the time opening of blanking plate for dismantling, erection, inspection of 200MVA ICT-I&II main tank and filling of dry air of dew point -500C or better for completion of work . The work shall be include connecting pipe as required and measuring of due point values of dry air.
Complete dismantling of the transformer. The scope of work involves removal of conservator tank radiators, busings, turret , complete oil pipe line cooling fan ,OLTC drive mechanism ,oil pumps & assiocated pipe line ,flange valves etc. stacking of all the dismaintled parts all proper place along with other associated works.
Lifiting of main tank body of 200MVA ICT-I&II , the scope of works involes opening of nuts ,bolts of rim gasket of main tank body , jacking & lifting of top cover, fixing of limiters and pipe stoppers between top cover and winding during replacement of gaskets ,then refitting the top cover after completion of the replacement of gasket as per details at SI No. 8 alongwith other associated works.
Replacement of rim gaskets. The scope of works involves removels of damaged gaskets ,cleaning of rim surface , fabrication of rim gasket out of 20 mm thick rubber gasket of Konica / Troboze / Nu-cork make having temperature beaging capcity around 380°C. and fixing the gaskets with adhesive at rim surface.
Replacement of old gasket from different parts of the transformers as per details below. The scope of works involesremovles of gaskets , cleaning of surface , fabrication of gaskets of appropriate size out of gaskets of thickness 12/10/8/6 mm of Konica /Nu-cork make and fixing of gaskets at proper place with adhesive along with other assoicated works:
Gaskets of 400KV turrets (Top & Bottom)
Gaskets of 400KV bushings
Gaskets of 132 KV turrets (Top & Bottom)
Gasket of 132 KV bushing
Gasket of33KV turrets (Top & Bottom)
Gaskets of 33KV bushings
Gaskets of 33KV bushings of top seal
Gaskets of nutral bushings turrets
Gaskets of nutral bushings turrets (Top & Bottom)
Gaskets of main tank inspection cover
Gasket s of HV/LV/IV/ N bushing covers
Gaskets of CT connection plate cover
Gaskets of PRV flange of main tank
Gaskets of main oil pipe betwwen main tank & radiator
Bucholz relay gasket
Teflon washer for air releashing plug
Gaskets of oil pipe line between main tank & conservator
Gaskets of oil surcharge relay & oil pipe line
Gaskets of OLTC top plate
Gaskets of drain valve / sampling valve 1'' dia. pipe
Gaskets of drain valve 2'' dia. pipe
Gaskets of drain valve 3 & 4'' dia. pipe line
Gaskets of drain valve 6'' dia. pipe line
Gaskets of 150NB oil pump
Gaskets of of flow meter (indicator 10mm thickness)
Gaskets of pipe line flange 100mm
Radiator gaskets (180 x180mm size in square shape)
Radiator valves gaskets (180 x180mm size in square shape)
Header joint (440 x 440 mm size in square shape
Air release nylon washer on radiator cap
Gaskets of M.O.G indicator
Gaskets of convertor tank
Gaskets of NRV
Replacement of defective nuts & bolts of different sizes as required
Draining out the transformer oil from OLTC chamber, overhauling of diverter switch, then fliushing with hot T/F Oil in the chamber.
Cleaning & flushing of the transformer winding in main tank with hot T/F oil through certified machine.
Complete eraction of the transformer. The scope of work involves refitting of all the dismantled parts of the transformer such as raditaor, conservator tank ,bushing , turrets, connecting oil pipe lines, cooling, fans, OLTC drive machanism, oil pumps & associated pipe lines etc. The work also involves attending the oil leakage, if any after refilling of transformer oil under vacuume In the tank as per details at Sl. No.15.
Complete evacuation of main tank of the transformer and filling of dry dry air of dew point -50°C or better in vacume upto pressure of 0.25g/sq. cm. and the again evacuating the transformer tank after requaird time interval (approx. 12/24 hrs) using certified machine. The scope of work involves measuring dew point valves of N2 after every cycle till requird value is achieved.
Performing the vacuum stand test. The scope of work involes to create the vacuum inside the tranasformer up to 70 hg mm for evacuation of mositure from core & winding and maintaining the pressure atleast for 72hrs.
Shifting of fresh (New) tranformer oil drums from store to switich yard.
Centrifuging of oil filled in oil tanks, Un-interrputed till the desired BDV value of the oil is achieved, filling of transformer oil into the main tank and radiators from oil tank as per details at Sl. No. 16, then certifuging & circulation of the oil transformer , un-interrupeted till the disired BDV value of the oil is achieved including recording of the all the parametters such as temperature, vacuum, insulation resistance etc. hourly. Centrifuging machine, its operator, all associaed T&Ps etc. shall be arranged by the contractor at his on cost.
Filling of the transformer oil into main tank and radiators from oil tanks under vacuum after performing the vacuum stand test successfully as per details at Sl.No.14.
Jumpering of HV/IV/LV side bushing of the transformer. The scope of work involving tightening of bushing clamps with appopriate sizes bolts & nuts including replacement of clamps, jumpers etc. as required.
Refitting of mulsifire system on the transformer. The scope of work involves shifting of dismantled parts of mulsifire system such as pipe lines, valves, accessories etc. to the site and connecting them properly with successful operation of the mulsifire system.
Shifting of empty oil drums from store to near 200 MVA ICT-I&II in switich yard and filling of used oil in transformer oil drums after shifting of drums switich yard to store.
Gupta Elect and Engg Works
Meena Elect & Engg. Works
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .