Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
19 Aug 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
C/o balance RCC drain of pocket-U, sector -20 YEA WC-02
2026_YEIDA_1174871_21
YEA/GM(PROJECT)/2026/556 DT-31/07/2026
Open Tender
Civil Works
Fixed-rate
180 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,960
₹4.4 L
5 Oct 2026
6 Aug 2026
20 Aug 2026
6 Aug 2026
19 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Foundation in ordinary soil (Ioam, clay or sand) including lift upto 1.5m and lead upto 30m. And including filling watering and ramming of excavated earth into the trenches or into space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30m from the foundation trenches. Depth from 0.00 to 1.50m below. UPWD/SOR-2020/AR/YEIDA | 2,180.52 | Cum | 72.8 | ₹1,58,741.86 |
| 2 | PCC: Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size). for leveling course up to 3.0m depth UPPWD SOR-2020/ 4.1.8 | 359.82 | Cum | 5,820 | ₹20,94,152.4 |
| 3 | Providing & laying in position specified grade of reinforced cement concrete excluding the cost of centring & shuttering for all work up to plinth level in 1:1.5:3(1 cement :1.5coarse sand :3 graded stone aggregate 20mm nominal size)-For Foundation upto 3.0 M UPPWD/SOR-2020/YEIDA/5.1.2 | 1,067.47 | Cum | 7,743 | ₹82,65,420.21 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of fromwork for: Foundation, footings, bases of columns, etc. UP PWD SOR-2020/5.9.1 | 1,203 | Sqm | 181.65 | ₹2,18,524.95 |
| 4.01 | Retainning Walls, Return Walls, Walls (any thickness) including attached pillaster, buttresses, plinth and string courses fillets etc. UPPWD/SOR-2020/YEIDA/5.9.2 | 7,986.4 | Sqm | 335.55 | ₹26,79,836.52 |
| 4.02 | Form Work: Suspended Floor, roofs landing, balconies, and access floors UPPWD /SOR-2020/5.9.3 | 18 | Sqm | 386.35 | ₹6,954.3 |
| 4.03 | Edges of slabs and breaks in floor and walls. Under 20cm wide. UPPWD /SOR-2020/5.9.16.2 | 19.5 | rmt | 127.4 | ₹2,484.3 |
| 5 | Rinforcement for R.C.C. work including straightening , Cutting Bending ,placing in position and bending all complete upto plinth level using Thermo-mechanically treated bars/cold twisted. UPPWD /SOR-2020/5.22.3 | 1,08,935.31 | kg | 77.08 | ₹83,96,733.69 |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.30 MB
21.pdf
Tender Documents • 1.89 MB
BOQ_2208351.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .