Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-Finance | ₹6.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹6.6 LRejected-Finance | ₹6.6 L | L2 | Rejected-Finance L2 |
| 3 | L3₹6.6 LRejected-Finance 0 ATMA PRAKASH BALUAGHAT SADAR JAUNPUR UTTAR PRADESH 222001 | JAUNPUR | UTTAR PRADESH | 222001 | ₹6.6 L | L3 | Rejected-Finance L3 |
| 4 | L4₹6.6 LRejected-Finance | ₹6.6 L | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹65,600
Closing Date
20 Apr 2026, 5:00 pmClosed
EO
Office Nagar Panchayat Gaurabadshahpur Jaunpur
Civil Work 02
2026_DOLBU_1131613_2
2143/NP Gaura/2025-26
Open Tender
Civil Works - Roads
30 days
Nagar Panchayat Gaurabadshahpur Jaunpur
Civil Work 02
2 documents required · 2 mandatory
₹1,275
Yes
EO
₹65,600
Yes
Office Nagar Panchayat Gaurabadshahpur Jaunpur
1 May 2026
31 Mar 2026
21 Apr 2026
31 Mar 2026
20 Apr 2026
31 Mar 2026
31 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1.01 | Excavation in foundation in ordinary soil (loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth up to a distance of 30m. from the foundation trenches including all T&P. Sl no.- 251 | - | Cum | - | - | BI01010001010000000000000515BI0100001114 |
| 2Concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 8:4:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work. Sl No.- 281 | ||||||
| 3M-150 brick work in 1:4 cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work. [SI. No.305B] | ||||||
| 4Earth work in filling with 4.00 Km. cortage cost of all material T&P & excluding GST. | ||||||
| 5Construction of granular sub base by providing coarse graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and conpacting with roller to achive desired density including all complete. | ||||||
| 6Providing and Laying of Rubber moulded (Grey colour) Interlocking Concrete Block Pavements having thickness 80 mm including leveling and dressing of surface to required level and slope, spreading and moisting 30m thick local sand on bend, filling joints with local sand on bend, filling joints with local sand etc. for proper completion of the work as per drawings and Technical Specification Clause 1504. | ||||||
| 7Providing and Laying of Rubber moulded (Red colour) Interlocking Concrete Block Pavements having thickness 80 mm including leveling and dressing of surface to required level and slope, spreading and moisting 30m thick local sand on bend, filling joints with local sand on bend, filling joints with local sand etc. for proper completion of the work as per drawings and Technical Specification Clause 1504. | ||||||
| 8Disposal of mud/malaba out side of municiple limit including all charges all complete. | ||||||
| 9Construction of padustrial board 1.20 X0.75 m including all complete. | ||||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.83 MB
BOQ_2111665.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid