Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | ₹8.3 L Quoted ₹9.8 L | L1 | Accepted-AOC agreement completed |
| 2 | L2₹9.8 L+₹3,145.59 (0.32%)Rejected-Finance | ₹9.8 L+₹3,145.59 (0.32%) | L2 | Rejected-Finance L2 bidder |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance 127 182 JUHI GADADA KANPUR | KANPUR | KANPUR | UTTAR PRADESH | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance 127 102 JUHI KANPUR | KANPUR | KANPUR | UTTAR PRADESH | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹9.8 L
EMD Value
₹98,300
Closing Date
25 Mar 2026, 3:00 pmClosed
Chief Engineer
Motijheel Nagar Nigam Kanpur.
Construction garbage house from karwalo nagar Under Ward-06 Zone-5
2026_NNKAN_1128204_1
1338/A.A.5/25-26
Open Tender
Civil Works
Fixed-rate
45 days
Ward-06
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹98,300
23 Jul 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in cutting or in embankment in ordinary soil excavation to be done form of regular pits not excding 1/2M. in depth and work embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5m lift and 30m lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. distance as directed by Engg. | |||||
| 2 | Providing and laying in cement concrete 1:5:10 (1cement : 5 fine sand : 10 graded brick aggregate 40mm nominal size) and curing complete, including cost of formwork in foundation and floors. | 1 | CUM | - | - |
| 3 | RCC work sith cement aproved coarse sand and 2 cm (3/4) gauge approved stone ballast in the proportion 1:1.5:3 (1cement :6 aggregate) in columns etc. all comp work | 1 | CUM | - | - |
| 4Mild steel or iron in plain work such as reinforced concrete of reinforced brick work 12mm to 32 mm for the etc. all comp work | |||||
| 5Class-150 brick work in 1:4 cement and coares sand of 1.25 fineness modulous mortar in foundation and pilinth including supply of all materials labour and tools and plants ete required for proper completion of the work | |||||
| 612 mm cement plaster in single coat on fair side of single or half brick wall for interior plastering upto floor two level including internal rounded angles chamfers, and/or rounded | |||||
| 7Cement concrete 1:2:4 cemenat c:sand etc. all comp work | |||||
| 8 | Providing and Applying white cement based putty of average thickness of 1mm, of approved brand and manufacture over the plasterd wall surface to prepare the surface even and smooth incl. cost of mat.. labour & T&P | 1 | Sqm | - | - |
| 9 | Finishing walls with two coat of acrylic smooth exteriorpaint of best quality including supply of all material labour and T&P etc. required for proper completion of the work | 1 | Sqm | - | - |
| 10Add Gst | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.78 MB
BOQ_2104196.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .