| 1 | L1₹97.8 LAccepted-AOC | L1 | Accepted-AOC Lowest Amount Quoted BY VIKNESH AGENCY (9781664.15) accepted | |
| 2 | L2₹98.6 L+₹76,439 (0.78%)Rejected-Finance 3 24 SOUTH STREET ORAKKADU VILLAGE ORAKKADU POST ORAKKADU TAMIL NADU 607103 | ORAKKADU | CUDDALORE | TAMIL NADU | 607103 | L2 | Rejected-Finance Above Estimate Rate |
Tender Value
₹99.1 L
EMD Value
₹99,500
Closing Date
1 Jun 2023, 3:00 pmClosed
Additional Collector(D)/project Director
Additional Collector(D)/project Director DRDA Tiruvallur
1.STRENGTHENING OF BT ROAD FROM GNT ROAD TO SOZHIPALAYAM SHOLAVARAM PANCHAYAT IN SHOLAVARAM PANCHAYAT UNION 2. STRENGTHENING OF BT ROAD FROM SIRUNIYUM TO PANNEERVAKAM COLONY ANGADU PANCHAYAT SHOLAVARAM BlOCK Pac.36
2023_RDTN_319821_1
755/2023/A7 dated.24.05.2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Sholavaram Block
Class I and above
5 documents required · 5 mandatory
₹0
₹99,500
Yes
13 Jul 2023
26 May 2023
1 Jun 2023
26 May 2023
1 Jun 2023
27 May 2023
Amount
1..STRENGTHENING OF BT ROAD FROM GNT ROAD TO SOZHIPALAYAM @ SHOLAVARAM PANCHAYAT
Advance patch work for making up the undulation in the existing BT Surface to an average thickness of 25mm using 13.20mm IRC HBG Metal
Collection and supply of carted earth from approved quarry an average lead 1 km including cost and conveyance of all materials to site and labour charges
Applying TACKCOAT over BM surface at 2.50 Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying TACK COAT over BT surface using 3kg of bitumen 60/70 for 10 sqm area including cost and conveyance of bituminous binder including all labour charges for preparing the surface and applying
Bituminous conctrete 25,30/40mm Thick using cmp (Grade-II) providing and laying Bituminous concrete to 40mm thick using grades of metal etc
Providing and laying 50 MM Compacted thick Bituminous macadam using 26.5 - 11.2 mm graded metal and 0.10 cum of 13.20 - 2.6 mm graded metal and 0.10 cum of 2.36 mm and below with 49.50 kgs of buitumen for premixing per 10 sqm including cost and conveyance of materials to the work site and stacking them to the department metric gauge for premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in Mini Hot Mix plant for premix carpet only, rolling by 80-100 power roller for premix carpet and seal coat separately including labour charges for spreading the mix of premix carpet, application of bitumen for seal coat over premix carpet etc, including hire charges and fuel charges for Mini Hot Mix Plant, bitumen boiler, Power roller and all other tools and plants employed etc., complete as per clause 504 of MORTH specification.(50 mm thick)
Provision for HM Stone Charges etc,..
Provision for KM Stone Charges etc,..
Provision for sign board
Providing Name board charges with painting etc complete as per standard specifications
Providing for road marking with hot applied thermoplastic compound with Reflectorising Glass beds on Bitiminious surface etc.,
Provision for Rumble stripers
Provision for Reflectors
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
2.STRENGTHENING OF BT ROAD FROM SIRUNIYUM TO PANNEERVAKAM COLONY @ ANGADU PANCHAYAT CH 0/0 - 0/880 KM
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying 50 MM Compacted thick Bituminous macadam using 26.5 - 11.2 mm graded metal and 0.10 cum of 13.20 - 2.6 mm graded metal and 0.10 cum of 2.36 mm and below with 49.50 kgs of buitumen for premixing per 10 sqm including cost and conveyance of materials to the work site and stacking them to the department metric gauge for premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in Mini Hot Mix plant for premix carpet only, rolling by 80-100 power roller for premix carpet and seal coat separately including labour charges for spreading the mix of premix carpet, application of bitumen for seal coat over premix carpet etc, including hire charges and fuel charges for Mini Hot Mix Plant, bitumen boiler, Power roller and all other tools and plants employed etc., complete as per clause 504 of MORTH specification.(50 mm thick)
Applying TACKCOAT over BM surface at 2.50Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Bituminous conctrete 25,30/40mm Thick using (Grade-II) cmp providing and laying Bituminous concrete to 40mm thick using grades of metal etc
Collection and supply of carted earth from approved quarry
Provision for HM Stone Charges etc,..
Providing Name board charges with painting etc complete as per standard specifications
Provision for sign board
Providing for road marking with hot applied thermoplastic compound with Reflectorising Glass beds on Bitiminious surface etc.,
Provision fot Rumble stripes
Provision for Reflectors
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M/s. PCN CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .