Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹22.4 L
EMD Value
₹44,900
Closing Date
11 Jul 2025, 5:00 pmClosed
SE-V BTPS Obra
Office of SE-V BTPS Obra
Works of Shifting and overhauling of LT and HT motors also servicing, overhauling of Switch gear of CHP, Obra TPS, Obra.
2025_RVUNL_1050454_1
N-OBR////6000008588/CHD-III
Open Tender
Repair and Maintenance Works
Fixed-rate
365 days
CHD-III BTPS
As per PQC
3 documents required · 3 mandatory
₹1,180
Chief Finance and Account Officer,Nagar Nigam
₹44,900
22 Jul 2025
20 Jun 2025
15 Jul 2025
20 Jun 2025
11 Jul 2025
20 Jun 2025
20 Jun 2025 - 11 Jul 2025
Amount
Motor Shifting Upto 30 KW
Motor Shifting V.F. motor
Motor Shifting 31KW to 70KW
Motor Shifting 71KW to 199KW
Motor Shifting 200KW 6.6 KV
Motor Shifting 525KW 6.6 KV
Motor Shifting 1250KW, 6.6KV stator/rotor
Overhauling of motor UP TO 30KW motor
Overhauling of motor V.F. motor
Overhauling of motor 31KW to 70KW
Overhauling of motor 71KW to 199KW
Overhauling of motor 200KW 6.6 KV
Overhauling of motor 525KW 6.6 KV
Shifting of boxed motor UP TO 30KW motor
Shifting of boxed motor 31KW to 70KW
Shifting of boxed motor 71KW to 199KW
Shifting of boxed motor 200KW 6.6 KV
Shifting of boxed motor 525KW 6.6 KV
Removal of sheared bolt from motor 31KW to 70KW
Removal of sheared bolt from motor 71KW to 199KW
Weight adjustment of V.F. motor
Cleaning of crusher motor 525KW, 6.6KV
Cleaning of crusher motor 1250KW 6.6KV
Checking of crusher motor Air gap of 1250KW 6.6KV
Shifting of cooler of 525KW, 6.6KV motor
Replacement of bearing of 71KW to 199KW 0.4KV motor Drive end
Replacement of bearing of 71KW to 199KW 0.4KV motor Non Drive end
Replacement of bearing of 200KW 6.6KV motor Drive end
Replacement of bearing of 200KW 6.6KV motor Non Drive end
Replacement of bearing of 525KW 6.6KV motor Drive end
Replacement of bearing of 525KW 6.6KV motor Non Drive end
Shifting of suspension magnet as per scope 8.5 KW, 18KW Weight 5 Ton approx.
Minor repairing of motor cover and foundation, lighting control panel, metal detector, panel cover, OTLS, screw pad, structure stairs, pull chord and box cover pusher arms etc. by way of cutting welding of CHP A/B TPS, Obra
Overhauling/Servicing of Coal handling control room switch gear section-A Main bus ‘A’ CHP
Overhauling/Servicing of Coal handling control room switch gear section-A Breaker I/C, O/G, ‘A’ CHP
Overhauling/Servicing of Coal handling control room switch gear section-A Panels ‘A’ CHP
Overhauling/Servicing of Coal handling control room switch gear section-A Russian control modules ‘A’ CHP
Overhauling/Servicing of Coal handling control room switch gear section-B Main bus ‘A’ CHP
Overhauling/Servicing of Coal handling control room switch gear section-B Breaker I/C, O/G, ‘A’ CHP
Overhauling/Servicing of Coal handling control room switch gear section-B Panels ‘A’ CHP
Overhauling/Servicing of Coal handling control room switch gear section-B Russian control modules ‘A’ CHP
Overhauling/Servicing of Coal handling main building Transfer point Switch gear main bus transfer point section-A, CHP ‘A’
Overhauling/Servicing of Coal handling main building Transfer point of Panels, CHP ‘A’
Overhauling/Servicing of Coal handling main building Transfer point of Russian control modules, CHP ‘A’
Overhauling/Servicing of Coal handling main building Transfer point of Switch gear main bus transfer point section. B, CHP ‘A’.
Overhauling/Servicing of Coal handling main building Transfer point of Panels, CHP ‘A’.
Overhauling/Servicing of Coal handling main building Transfer point of Russian control modules, CHP ‘A’
Overhauling/Servicing of Wagon tippler, switch gear Electrical wagon pusher S/G room of Russian breaker.
Overhauling/Servicing of Wagon tippler, switch gear Electrical wagon pusher S/G room of Russian resistance boxes A CHP.
Overhauling/Servicing of Wagon tippler, switch gear Electrical wagon pusher S/G room of Wagon tippler resistance boxes, A CHP.
Overhauling/servicing of 0.4 KV switching bus duct section of Coal handling control room SWG section-A, Section –B, Section –C, Fuel handling control room SWG Section –A, Section –B & Old /New stacker, re-claimer switch gear of CHP ‘A’.
Overhauling/servicing of L.T. Modules/panel of Breaker /I.C. coupler of CHP, control room of ‘B’ CHP.
Overhauling/servicing of L.T. Modules/panel of Breaker /O.G. feeder of CHP, control room of ‘B’ CHP.’
Overhauling/servicing of L.T. Modules/panel of Breaker /I.C. coupler of fuel handling control room of ‘B’ CHP
Overhauling/servicing of L.T. Modules/panel of Breaker /O.G. feeder of fuel, control room of ‘B’ CHP.
Overhauling/servicing of OLD stacker re-claimer Panel
Overhauling/servicing of OLD stacker re-claimer Resistance box of ‘B’ CHP.
Overhauling/servicing of OLD stacker re-claimer Control panel of ‘B’ CHP
Overhauling/servicing of New-stacker re-claimer Panel
Overhauling/servicing of New-stacker re-claimer Resistance box of ‘B’ CHP..
Overhauling/servicing of New-stacker re-claimer Control panel of ‘B’ CHP.
Servicing/Overhauling & breakdown maintenances of MIMIC plant of CHP.
Overhauling /Servicing of tippler switch gear of B CHP.
Overhauling/servicing of wagon tippler room Operator panel (On/OFF) of ‘B’ CHP
Overhauling/servicing of wagon tippler room incoming power panel of ‘B’ CHP
Overhauling/servicing of wagon tippler room Control modules of ‘B’ CHP.
Overhauling/servicing of wagon tippler room Resistance box of ‘B’ CHP.
Overhauling/servicing of wagon tippler screw pad overhauling of ‘B’ CHP.
Overhauling/servicing of wagon tippler over travel limit switch(OTLS) overhauling of ‘B’ CHP.
Overhauling/servicing of wagon tippler MCC Panel of tipper 11A, 11B, 12A, 12B of ‘B’ CHP.
M/S MADHU CONSTRUCTION (BID ID -5312645)
M/S SCIENTECS PROCESS CONTROL (BID ID -5290700)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .