| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Submitted all documents |
| 2 | Accepted-Technical | Accepted-Technical Submitted all documents |
| 3 | Accepted-Technical | Accepted-Technical Submitted all documents |
Updated dates
Tender Value
₹62.9 L
EMD Value
₹1.3 L
Closing Date
22 May 2026, 11:00 amClosed
Executive Engineer
Office of Executive Engineer, CD UP Jal Nigam (Urban), Hapur
Construction of OHT with associated works for 264 EWS residence (Pradhan Mantri Awas Yojna)in village Handalpur, Distt,- Hapur
2026_UPJNM_1140583_1
191/M-03/08 Dated-21.04.2026
Open Tender
Civil Works - Water Works
270 days
Village- Handalpur
As per NIT/Tender Document
2 documents required · 2 mandatory
₹5,900
Executive Engineer, CD UP Jal Nigam (Urban), Hapur
₹1.3 L
EE Office, CD UPJN (Urban), Hapur
6 Jun 2026
24 Apr 2026
22 May 2026
24 Apr 2026
22 May 2026
24 Apr 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1SCHEDULE (G-1) | ||||||
| 1.01 | RCC Overhead Tank | - | - | - | - | BI01010001010000000000000515BI0100000002 |
| 1.02 | Supply of all materials labour T&P etc. required for complete construction of R.C.C. Over Head Tank of following capacity and staging min 0.6 m above buildup ground level with main components, soil testing and ‐assuming bearing capacity of soil as 8 MT, including cost of survey and supply of design and drawings. All the water retaining components of OHT shall be casted in M 30 grade cement concrete and minimum grade of concrete‐ of foundation and staging should be M 25 with approved opc cement, coarse sand and stone grit as per I.S. 11682 and I.S.456 Seismic effects and wind load should be taken into consideration as per I.S. 1893 for earthquake resistance and I.S. 875 part III for wind load on structure and including 1M wide RCC staircase (Saperate two column based RCC staircase), 1 m wide R.C.C. M30 balcony, M.S. ladder made of 50x50x6 mm angle section and 20mm plain M.S. bars with hand rails of 20mm medium class G.I. pipes, One Stainless steel ladder inside the tank from top dome to bottom dome, railing with 20mm dia medium class G.I.pipe (in 3 rows) on both sides of stair case, supported on 50x50x6mm M.S. angle section, spaced at intervals not more than 1.5m, proper ventilator at top dome in circular shape of 1.2 m dia, Food Grade epoxy coating of FOSROC / Asian paints Triblock or reputed brand on inside surface area of water container after testing of water tightness, two coat of apex painting over one coat of primer of approved colour after finishing of RCC surface with grinder, | - | - | - | - | BI01010001010000000000000515BI0100000003 |
| 1.03 | Repairs of pin holes, unevenness of all concrete surface and steel pipe works, Ultra Sonic Water level indicator fabricated with sensor connecting to automation, Lightening conductor as per I.S.2309 or its latest amendments of latest electricity rules, consisting of proper elevation rod with 5 or more fork points as prescribed in ISS 2309 1969 and I.S. 3013 1966, C.I. /M.S. manhole of min 60x60cm size with locking arrangement. | - | - | - | - | BI01010001010000000000000515BI0100000004 |
| 1.04 | Supply, fixing, jointing of D.I.D/F Pipes of appropriate size with D.I.D/F specials conforming to IS 8329/2000 as vertical pipes for inlet/outlet , overflow and washout (as per approved design) with Bell Mouth as per latest / relevant I.S. specifications with all jointing materials for proper completion of work, Construction of 120mm thick RCC floor in 1:1.5:3 with cement, coarse sand, approved stone grit and reinforcemen‐t@8mm dia@250mm c/c both way over 100mm thick PCC 1:4:8 Construction of washout / overflow chamber and chambers for sluice / butter fly valves as per departmental type design and drawing, Supply of 200 mm dia PVC(6Kg-f)/ HDPE (PN-6.0) pipe as per latest relavent I.S. code for disposal of water from overflow and washout chamber to suitable point outside the water works compound including necessory earth filling in campus, Gardening work with 2 nos Palm tree, landscaping work, installation of fountain in water works campus, watch & ward of all campus etc complete in all respect as per direction of Engineer-in-charge. including testing of bearing capacity of soil for various sites for proposed water works. | - | - | - | - | BI01010001010000000000000515BI0100000005 |
| 1.05 | 125 KL/22 m staging | 1 | No. | - | - | BI01010001010000000000000515BI0100000007 |
| 2SCHEDULE (G-2) | ||||||
| 2.01 | RISING MAIN | - | - | - | - | BI01010001010000000000000515BI0100000044 |
| 2.02 | Supply of following sizes of pipes including cost of pipes with cost of its Specials, FOR destination, all duties and insurance charges, cost of jointing materials, loading unloading, third party inspection charges, packing and forwarding charges, road transportation charges etc complete . | - | - | - | - | BI01010001010000000000000515BI0100000045 |
| 2.03 | D.I. Pipe K-9 conforming to IS 8329 / 2000 or its latest amendment | - | - | - | - | BI01010001010000000000000515BI0100000046 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
TenderDocumentHandalpurOHT.pdf
Tender Documents • 15.79 MB
BOQ_2129970.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid