Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Finance 140 DEORISINGHPURA RANIPUR JHANSI JHANSI UTTAR PRADESH 284205 UDYAM UP 39 0007853 | JHANSI | UTTAR PRADESH | 284205 | L1 | Admitted-Finance | ||
| 2 | L2₹3.9 L+₹965.84 (0.25%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.9 L+₹9,233.51 (2.40%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹7,800
Closing Date
19 May 2026, 2:00 pmClosed
EE
EE
29 ward 85 ke antargat lajpat nagar sthit H no 120/398 se 120/411 tak 300mm vyas ki 80mtr civer line bichhane or 07 nag mainhole nirmaan ka karya
2026_DOLBU_1147923_29
JALKAL/ZONE06/328
Open Tender
Miscellaneous Works
Percentage
JALKAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
FC
₹7,800
26 Jul 2026
13 May 2026
19 May 2026
13 May 2026
19 May 2026
13 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of C.C. Road & including Sorting Out & stacking of Servicable Materials including Supply of lab,T&P all Comp. | 100.16 | Sqm | 404.1 | ₹40,474.66 |
| 2 | Excavation of Foundation in Ordinary soil including Lift Up to 1.50 Mtr With Supply of lab,T&P etc all comp. | 150.24 | Cum | 291.89 | ₹43,853.55 |
| 3 | Concrete work With 20 Gauge Bricks Blast,L.Sand & Cement in foundation Under floor s in Prop.of 10:5:1 including Supply Lab,Mat,T&P etc all Comp. | 8.78 | Cum | 4,747.35 | ₹41,681.73 |
| 4 | Making Necessary Arrangement of Barricating With Sal ballies, Red Flag, Lab, T&P etc all Comp. | 95 | Rmt | 200 | ₹19,000 |
| 5 | 1st Class Brick Work with 1:3 Cement & Coarse Sand mortar & including Supply of lab, Mat, T&P etc all Comp. | 13.82 | Cum | 7,200 | ₹99,504 |
| 6 | 12 mm thick plaster with 1:3 cement & L.Sand mortor with Supply of lab, Mat ,T&P etc all comp. | 50.4 | Sqm | 237.17 | ₹11,953.37 |
| 7 | Providing Bier to Retain Sewage water etc all Comp. | 4 | Nos | 450 | ₹1,800 |
| 8 | RCC Work with Cement, C.Sand & 20 Gauge appd.stone ballast in prop. Of 1:1.5:3 in Slab including Supply of Lab, Mat, T&P etc all comp. | 2.51 | Cum | 1,280 | ₹3,212.8 |
| 9 | Bailing out of water with 5 H.P. Mud Pump including all accessories Such as Suction & Non skilled Lab.Including Supply of Lab, T&P all Comp | 2 | days | 470 | ₹940 |
| 10 | Cast Cement Concrete | 7 | Job | 315 | ₹2,205 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.37 MB
Tendernotice_2.pdf
PDF • 22.34 MB
BOQ_2148580.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .