Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-AOC NOCHIPALAYAM AUTHUR PO KARUR 2 | ₹12.0 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | K.SELVARAJ L1 | SRT Infra Projects L2 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH | 210 | M3 | 2,548 ₹5,35,080 Lowest | 2,600 ₹5,46,000 |
| 2.00 | Providing and laying tack coat over the Wet Mix Macadam surface using 4 Kg of Emulsion bitumen for 10 Sq.m including cost of Emulsion bitumen which will be supplied by the contractor himself at his own cost as per special condition including cost and conveyance to site handling charges including labour charges for brushing,cleaning and preparing the surface for Applyinging the tack coat and labour for applying and required quantity of bitumen binder as tack coat by bitumen sprayer including hire and fuel charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc., completed Complying with Standard Specification as per Clause 503 MORTH Specification. | 1,480 | M2 | 67.2 ₹99,456 Lowest | 70 ₹1,03,600 |
| 3.00 | Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V | 74 | M3 | 4,768 ₹3,52,832 Lowest | 4,800 ₹3,55,200 |
| 4.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and lab | 30 | M3 | 6,997 ₹2,09,910 Lowest | 7,000 ₹2,10,000 |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
20 Nov 2025, 3:00 pmClosed
Executive officer
Annur Town Panchayat
Providing BT Road Patch and CC Road Patch Work at Ward No.1 to 15 in Annur Town panchayat.
2025_DTP_624847_1
321/2025/A1
Open Tender
Civil Works - Roads
Works
180 days
Annur Town Panchayat
as per norms
1 document required · 1 mandatory
₹0
₹30,000
19 Jun 2026
20 Nov 2025
20 Nov 2025
20 Nov 2025
20 Nov 2025
20 Nov 2025
20 Nov 2025 - 20 Nov 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_747186.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .