Loading…
Loading…
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
6 Oct 2026, 6:00 pm
District Soil Conservation Officer
Raika Narwal Jammu
Construction of Water Harvesting Structure at Khui Nallah - II , CO 5/N Tehsil Jammu Constituency Nagrota District Jammu
2026_SWCD_325375_11
eNit No 01 of 2026-27 dated 21.09.2026
Open Tender
Civil Works
Percentage
30 days
Construction of WHS at Khui Nallah - II Co 5/N
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Assistant Engineer (Agri), SWCD
₹2,000
21 Sept 2026
21 Sept 2026
7 Oct 2026
21 Sept 2026
6 Oct 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Water Harvesting Structure | |||||
| 1.01 | Clearing jungle including uprooting of rank vegetation grass, brushwood, trees and saplings of girth upto 30 cm measured at height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared | 33.74 | Sqm | 12.49 | ₹421.41 |
| 1.02 | Earth work in excavation by manual means over areas (exceeding 30 cm and upto 1.5 mt in depth, 1.5 mt in width as well as 10 sqm on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil | 67.97 | Cum | 479.3 | ₹32,578.02 |
| 1.03 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 3.12 | Cum | 5,733.6 | ₹17,888.83 |
| 1.04 | Centring and shuttering including strutting propping etc and removal of form work for.- Foundations, footings, bases of columns | 14.87 | Sqm | 286.35 | ₹4,258.02 |
| 1.05 | Dry stone pitching 22.5cm thick laid in courses required profile with hammer dressed stone having no side less than 15cm with minimum depth of 20 cm including preparing the bedding surface etc all complete | 43.68 | Sqm | 503 | ₹21,971.04 |
| 1.06 | Supply of Stone boulder (nallah) nominal size 225 mm (Stack measurements reduced by 15%) | 9.83 | Cum | 800 | ₹7,864 |
| 1.07 | Providing and Laying damp proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete | 11.99 | Sqm | 416.5 | ₹4,993.84 |
| 1.08 | Carriage of Materials from source to site of work Stone av 20 K M by MT and 100 Mtr HL | 9.83 | Cum | 698.68 | ₹6,868.02 |
| 1.09 | Carriage of Materials from source to site of work Sand av 20 K M by MT and 100 Mtr HL | 2.37 | Cum | 654.3 | ₹1,550.69 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Tendernotice_2.pdf
PDF • 0.59 MB
BOQ_1099642.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .