Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L | L1 | Accepted-AOC Lowest (L1) |
| 2 | L2₹4.2 L+₹9,580.70 (2.31%)Rejected-Finance 1191 ARDEVOK ROAD BARASAT 24 PGS N KOL 700125 | BARASAT | NORTH 24 PARGANAS | WEST BENGAL | 700125 | ₹4.2 L+₹9,580.70 (2.31%) | L2 | Rejected-Finance Not L1 |
| 3 | L3₹4.3 L+₹10,410.20 (2.51%)Rejected-Finance 112 1 THAKURBARI STREET P O SERAMPORE HOOGHLY 712201 | SERAMPORE | HOOGHLY | WEST BENGAL | 712201 | ₹4.3 L+₹10,410.20 (2.51%) | L3 | Rejected-Finance Not L1 |
Tender Value
₹4.1 L
EMD Value
₹8,300
Closing Date
21 Jan 2026, 12:00 pmClosed
EE, DIV-III, Circle III(BSUP), Housing Sector, KMD
OFFICE OF THE EXECUTIVE ENGINEER DIVISION-III, HOUSING SECTOR , KMDA(KIT WING) Unnayan Bhawan, DJ-11, Sector-II, 1st Floor, Block-A, Salt Lake, Kolkata- 700 091
Development of drainage system in front of Blocks of Housing Premises at 25, 25/1, B.B. Chatterjee Road in erstwhile KIT Scheme Kasba-I under Housing Sector, KMDA
2026_KMDA_983687_1
KMDA/HOUSING /EE/DIV-III/Circle III(BSUP)/NIT-42/T1/2025-2026
Open Tender
CIVIL WORKS
Percentage
60 days
Kasba-I
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹8,300
31 Jul 2026
13 Jan 2026
27 Jan 2026
13 Jan 2026
21 Jan 2026
13 Jan 2026
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming of the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. a) At ground floor.
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this not permitted with ordinary cement). Using grey cement (i) 35 mm thick a) At ground floor
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] With 1:4 cement mortar (i) 20 mm thick plaster
Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. All floors.
Supplying, fitting and fixing PVC pipes for underground work of approved make of Schedule 80 (medium duty)conforming to ASTMD 1785 and threaded to match with GI Pipes as per IS:1239 (Part-I).with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted includingcost of all materials ,jointing materials, cutting pipes, making threads, cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed complete in all respect.(Payment will be made on the centre linemeasurement of the total pipe line including all specials No separate payment will be made for accessories, specials.) PVC pipes. Dia (i) 80 mm
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge.
Add GST @ 18% on Total amount over item No. 1 to 9
Add Labour Welfare Cess @ 1% on Total amount over item No. 1 to 10
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Tendernotice_2.pdf
PDF • 0.17 MB
Tendernotice_3.pdf
PDF • 4.74 MB
BOQ_2400194.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .