Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H4₹5.4 LAccepted-Finance | ₹5.4 L | H4 | Accepted-Finance Lowest |
| 2 | H1₹8.2 LRejected-Finance | ₹8.2 L | H1 | Rejected-Finance Highest |
| 3 | H2₹7.1 LRejected-Finance OPPOSITE VIPUL GAS AGENCY HOSPITAL ROAD SOLAN H P | SOLAN | SOLAN | HIMACHAL PRADESH | ₹7.1 L | H2 | Rejected-Finance Highest |
| 4 | H3₹5.7 LRejected-Finance | ₹5.7 L | H3 | Rejected-Finance Highest |
| 5 | Rejected-Technical 379 15 CHULKANA ROAD SAMALKHA PANIPAT HARYANA 132101 UDYAM HR 18 0003278 06AAPCA2010E1Z9 B B R M MII STATUS AS VERIFIED | PANIPAT | HARYANA | 132101 | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | Kavinder Singh Govt. Contractor H4 | INDU KANWAR H3 | Ajay Sharma H1 | ROYAL ENGINEERING WORKS H2 |
|---|---|---|---|---|---|---|---|
| .01Description | |||||||
| 1.01 | Prov. 3 Phase Mono submersible pump set of reputed and approved make i.e. KSB model MR-3 confirming to letest BISspecifications i.e. 8304 . The pump set shall be fixed with free flow impellers of suitable allow as per BIS -8631-1976 with upto date amendmentsfor lifting raw water lubricated bush bearings of suitable alloy and shaft protection sleeves the pump shall be fitted coupled to submercible required cage motor com-pump to BIS 9283-1995 with upto date amendments corresponding to pump, fitted with water lubricated bush bearing alloys and shaft protection sleeve arrangement to counter balance the thrust caused due to water column in rising main and having cooling arrangement. The pump set should include the water level guard, errection clamps , cable clips and capable of following performances. | 5 | P/HP | 12,000 ₹60,000 Lowest | 15,000 ₹75,000 | 18,500 ₹92,500 | 17,000 ₹85,000 |
| 1.02Static head = 40 mtrs | |||||||
| 1.03Discharge = 5 LPS | |||||||
| 1.04Dia of Rising main = 50 mm | |||||||
| 1.05Length = 70 mtr | |||||||
| 1.06Pumping hours = 8 Hour | |||||||
| 2.00 | P/F 3 core copper cable wire 6 mm Sqm (Flat Submersible Cable) | 70 | Rmt. | 300 ₹21,000 Lowest | 315 ₹22,050 | 395 ₹27,650 | 385 ₹26,950 |
| 3.00 | P/F control panel for 5 HP Three phase with Amp. Mete,r volt meter, stater MCB water level gurd. | 2 | Set | 18,000 ₹36,000 Lowest | 18,000 ₹36,000 Lowest | 35,000 ₹70,000 | 27,500 ₹55,000 |
| 4.00 | Installation of Pump Set i/c Cutting , welding , Jointing ,complete in all respect at site. | 2 | Job | 3,000 ₹6,000 Lowest | 3,000 ₹6,000 Lowest | 7,500 ₹15,000 | 10,000 ₹20,000 |
Tender Value
₹7.2 L
EMD Value
₹14,500
Closing Date
8 Jul 2025, 11:00 amClosed
Executive Engineer
EE Jal Shakti Shimla Rural Division at Sunni
Providing and fixing 5 HP Mono Submersible pump set Jet type aspirator
2025_HPIPH_108855_1
SNN-SML-003-740-Tdr 06-14dt.26.06.25
Open Tender
Civil Works - Water Works
Item Rate
60 days
EE Sunni
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
EESuni
₹14,500
10 Aug 2026
27 Jun 2025
8 Jul 2025
27 Jun 2025
8 Jul 2025
27 Jun 2025
27 Jun 2025 - 8 Jul 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].