Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC | L1 | Accepted-AOC Approved | |
| 2 | L2₹4.9 L+₹14,057 (2.97%)Rejected-Finance | L2 | Rejected-Finance High Rate |
| Sl No | Description | Qty | Unit | SREE SENTHIL AANDAVAR CONSTRUCTION L1 | SRI KRISHNA ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation and depositing on Bank with initial lead of 10 m & initial lift of 2 m in Hard still clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS 20 B for foundation MORTH 24 & 25. | 66 | m3 | 115 ₹7,590 Lowest | 130 ₹8,580 |
| 2.00 | Cement concrete of mix 1:4:8 (one part of cement, and four part of sand, and eight part of coarse aggregate) using hard broken granite stone jelly of 40 mm gauge for foundation levelling course, including shuttering, dewatering wherever necessary and laid I layers of not more than 15cm thick complete complying with standard specifications and drawings and as directed by the departmental Engineers including all cost & conveyance of materials laying curing etc., complete as per TNDSS No 28V,VI(S2),VI(S54) and VII | 11 | m3 | 5,560 ₹61,160 Lowest | 5,650 ₹62,150 |
| 3.00Supplying and erecting centering for sides and soffits including supports and srtutting upto 3.29mm height for plane surfaces in all floors with cross bracings using miled steel sheets of size 30cm x 60cm and 10 gauge stiffened welded with miled steel sheets of size 25mm x 25mm x 3mm for boarding and laid over silver oak (country wood).Joists of size 10cm x 6.5cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced 75cm centre to centre etc., complete complying with standard specification ans as directed for the following items as per TNDSS No 30 & 86 | |||||
| 3.01 | Wall,Deckslab and Drain sidewall below 1.00 m height | 264 | m2 | 525 ₹1,38,600 Lowest | 560 ₹1,47,840 |
| 4.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 37 | m3 | 6,949 ₹2,57,113 Lowest | 7,000 ₹2,59,000 |
| 5.00 | Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed sand (M-Sand) and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 50 | m2 | 171 ₹8,550 Lowest | 190 ₹9,500 |
Tender Value
₹57,000
EMD Value
₹11,400
Closing Date
22 Sept 2025, 3:00 pmClosed
Executive Officer, Ayothiyapattanam Town Panchayat
Executive Officer, Ayothiyapattanam Town Panchayat
Providing Storm water Drain at Ward No.11 Ramnagar in Ayothiyapattanam Town Panchayat
2025_DTP_604713_1
345-2/2025
Open Tender
Civil Works - Others
Works
90 days
Executive Officer, Ayothiyapattanam Town Panchayat
Refer to Tender
2 documents required · 2 mandatory
₹0
₹11,400
Yes
25 Oct 2025
16 Sept 2025
23 Sept 2025
16 Sept 2025
22 Sept 2025
16 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_722805.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .