| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | ₹1.3 Cr | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹1.4 Cr+₹8.4 L (6.26%)Rejected-Finance 47 HUSENI LAKDA BAZAAR 242 BELLAIS ROAD MUMBAI 08 | MUMBAI | MUMBAI | MAHARASHTRA | 400008 | ₹1.4 Cr+₹8.4 L (6.26%) | L2 | Rejected-Finance Higher Bidder |
| 3 | L3₹1.4 Cr+₹9.8 L (7.31%)Rejected-Finance SWAGAT CO OP HSG SOCIETY LTD 22 303 CHAITANYA SHIVAJI RAJE COMPLEX MHADA COMPLEX OPP EKA NAGAR KANDIVALI W MUMBAI 400 067 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | ₹1.4 Cr+₹9.8 L (7.31%) | L3 | Rejected-Finance Higher Bidder |
| 4 | Rejected-Technical 1446 ELITE ENTERPRISES NORTH SOLAPUR NEAR SUSHIL MARATHI SCHOOL SOLAPUR MAHARASHTRA 413004 | SOLAPUR | MAHARASHTRA | 413004 | - | - | Rejected-Technical Not recommended since not enlisted in d(v) and c(vii) category |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not recommended since not enlisted in d(v) and c(vii) category |
Tender Value
₹1.3 Cr
EMD Value
₹2.1 L
Closing Date
4 Dec 2021, 6:00 pmClosed
SH A K SINGH SE CWE NAVY VASCO
CWE NAVY VASCO VASCO DA GAMA GOA 403802
MANNING AND OPERATION INCLUDING REPAIR MAINTENANCE OF WATER SUPPLY INSTALLATION AT BAITHKOL HYLAND INCLUDING DG SET AT BAITHKOL FIRE PUMP HOUSE AT ARGA NEW MAP QUARTERS ARGA LITTLE BINAGA AND SANKRUBAGH UNDER GE SB KARWAR
2021_MES_486694_1
85464/E8
Open Tender
Civil Works
Item Rate
334 days
CWE NAVY VASCO
AS PER TENDER DOCUMENTS
9 documents required · 9 mandatory
₹1,000
Yes
GE SB KARWAR
₹2.1 L
Yes
29 Jan 2022
6 Nov 2021
7 Dec 2021
6 Nov 2021
4 Dec 2021
27 Nov 2021
Amount
Manning and Operation of water supply installation at Baithkol in 03 (three) shifts of 8 hours each on all days including Sundays and holidays including minor maintenance /checks complete all as specified and as directed. The installation comprises of following equipments:- (i) Centrifugal pump set 7.5 HP - 02 Nos (ii) Submersible pump set 7.5 HP - 01 No (iii) DG set 250 KVA - 01 No (v) LT Panel -02 Nos
Manning and Operation of water supply installation at Hyland in 02 (two) shifts of 8 hours each on all days including Sundays and holidays including minor maintenance /checks complete all as specified and as directed. The installation comprises of following equipments:- (i) Monoblock pump set 2 HP - 01 No (ii) Monoblock pump set 1 HP - 01 No (iii) DG set 12.5 KVA - 01 No
Notes for item Nos 1 & 2 :- (a) Contractor shall employ one fitter general mechanic/ electrician having minimum ITI qualification from Govt recognised institute with adequate knowledge & minimum 2 years experience in maintenance & operation of electric supply/water supply/fire fighting installation for each shift of 08 hours. Total -05 Nos filter general mechanic/electrician will be employed by the contractor(03 Nos for water supply installation at Baithkol against Item No.1 and 02 Nos at Hyland against Item No.2.The operator must competent to carry out the minor repair/maintenance all as specified and as directed.
Manning and Operation of water supply installation at clarified water sump and pump house at Arga in 03 (three) shifts of 8 hours each on all days including Sundays and Holidays including minor maintenance / checks complete all as specified and as directed.The installation comprises of following equipments :-
Manning and operation of water supply installation at fire and drinking water pump house Arga bay in 03 (three) shifts of 8 hours each on all days including Sundays and holidays including minor maintenance/checks all as specified and directed. The installation comprises of the following equipments:-
(a) Water pump HP-75, Head – 50 m, discharge – 200 cum/hr. Make – Kirloskar Brothers, coupled with induction motor 3 phase, 415 volt, RPM – 1430, HP – 75, Make – Chrompton Greaves – 5 Nos. (b) Chlorine Dozing pump model-402, pressure-8 kg/sqcm, discharge – 160 LPH, Make – Milton Roy, coupled with induction motor 3 phase, 415 volt, RPM – 1430, HP – 5, Make – Bharat Bijlee-2 Nos with connected accessories and 1000 ltr capacity PVC storage tank-01No. (c) Fire water pump HP-156, Head – 88 m, discharge – 273 cum/hr. Make – Kirloskar Brothers, coupled with induction motor 3 phase, 415 volt, RPM – 1430, HP – 156, Make – Chrompton Greaves – 2 Nos. (d) Jockey pump HP-30, Head – 88 m, discharge – 30 cum/hr. Make – Kirloskar Brothers, coupled with induction motor 3 phase, 415 volt, RPM – 1430, HP – 30, Make – Chrompton Greaves – 2 Nos.
Notes for Item Nos.3 & 4:- (a) Contractor has to employ minimum following staff for manning & operation of the Clarifier installations and Fire pump house at Item Nos 3 & 4 above :- (i) One skilled electrician/ Fitter general mechanic operator per shift of 08 hours (2 shifts per day) for each water supply installation at Sl No.3 & 4 above) separately havining minimum ITI qualification in respective trade from Govt recognised institute with adequate knowledge with minimum two years experience in maintenance & operation of water supply installation. The operator must be competent to carry out the minor Maintenance of water supply installation all as directed by Engineer-in-Charge. (ii) One skilled Valve operator per shift of 08 hours ( 2 shifts per day) for water supply installation at Item No. 4 above separately having minimum ITI qualification in respective trade from Govt recognised institute with adequate knowledge with minimum two years experience in maintenance & operation of water supply pipes & valves. The operator must be competent to carry out the minor maintenance of water supply pipe line & valves all as directed by Engineer-in-charge.
Manning and Operation of water supply installation at MAP Ph-II Little Binaga in 03 (three) shifts of 8 hours each on all days including Sundays and holidays including minor maintenance /checks all as specified and directed by Engineer-in-Charge. The installation comprises of following equipments:- (i) Centrifugal pump set 30 HP - 02 Nos (Make- Kirloskar) (ii) Deisel Engine Driven pump set 72 HP -01 No (Make- Kirloskar) (iii) Jockey pump set 7.5 HP -01 No (Make- Kirloskar) (iv) Centrifugal Pump Set 50 HP for Fire Fighting-01 No (Make- Spectrum) (v) LT Panel -01 No
Manning and Operation of water supply installation at MAP Ph-II Arga (Kadamba Vanam) in 03 (three) shifts of 8 hours each on all days including Sundays and holidays including minor maintenance /checks all as specified and directed by Engineer-in-Charge. The installation comprises of following equipments:- (i) Centrifugal pump set 30 HP - 02 Nos (Make- Kirloskar) (ii) Lt Panel -01 No
Manning and Operation of water supply installation at Sankrubagh in 03 (three) shifts of 8 hours each on all days including Sundays and holidays including minor maintenance / checks all as specified and directed by Engineer-in-Charge. The installation comprises of following equipments:- (i) Centrifugal Pump Set 5 HP - 04 Nos (ii) Standby DG Set 15 KVA - 01 No (iii) Centrifugal Pump Set 10 HP -2 Nos (iv) Lt Panel -01 No
Notes for item Nos .5 to 7 :- (a) Contractor shall employ one fitter general mechanic/ electrician having minimum ITI qualification from Govt recognised institute with adequate knowledge & minimum 2 years experience in maint & operation of electric supply/water supply/fire fighting installation for each shift of 08 hours. Total -09 Nos fitter general mechanic/ electrician will be employeed by the contractor (03 Nos for water supply and fire fighting installation MAP Ph-II at Little Binaga, 03 Nos for water supply and fire fighting installation MAP Ph-II at Arga and 03 Nos for water supply installation at Sankrubag). The operator must competent to carry out the minor repair/maint all as directed.
Notes for item Nos 1 to 7 :- (a) The unit rate quoted shall deemed include for maintenance of earth pits, cutting & removing of vegetation and upkeep of the surrounding area, all around the bldg upto 6 mtr from the plinth protection all as specified and as directed. In case of failure, a penalty of Rs 1000/- per month per plant/pump house shall be levied and recovered from dues. (b) The rate quoted shall deemed to be inclusive of safety gear & required tools for minor maintenance. The contractor shall provide 02 Pairs of Gum Boot & 02 Pairs of Hand Gloves & 01 set of complete tool kit(Spanner,cutting pliers,pipe wrench,screw drivers,chargeable torch & tester etc) of reputed make as approved by Engineer in charge. In case of failure to provide tools kit & safety kit a penalty of Rs 5000/- per installation as mentioned under Item No. 1 to 4 shall be recovered and levied from dues of contractor
(c) The contractor shall provide 02 uniforms (pant,shirt,shoes,cap,belt and name plate ) to each operator and design of uniform shall be got approved from GE. In case of failure, a penalty of Rs 100/- per day per Operator shall be levied and recovered from dues. (d) In case of failure due to absence of operative staff, the contractor shall be liable to pay compensation of Rs.1000/- or at twice the cost of a day’s manning & operation derived from pro rata rate of Sch ‘A’ quoted rates whichever is higher (e) The Contractor shall maintain proper records of all kinds of daily, weekly, monthly, quarterly, half yearly and yearly or whatsoever maintenance is carried out during contract period in a binded book / register and shall obtain the signature of Engineer-in-Charge every fortnightly. The quoted rate is deemed to be inclusive of binded book/register.
(f) It is responsibility of contractor to deposit the employees provident fund (EPF) to the concerned authority as per the prevailing scales as laid down by the Ministry of labour for all Electrician/operator/helper (as applicable) and necessary proof to this regard shall be submitted to Engineer-in-Charge for verification and records. The quoted rate shall be deemed to be included of above provisions. In case contractor fails to produce the proof of EPF, he shall be liable for action as deemed fit. Decision of GE in this regard shall be final and binding. (g) The contractor shall maintain all the registers under various labour law rules, 2017 and shall be produced to GE and as well as officers detailed by labour department. (h) Grease and lubricating oil for Pump/Diesel Engine/DG Set shall be measured & paid separately under respective items of this schedule here in after. However the cost of labour is deemed to be included in the unit rate quoted against item Nos. 1 to 2 above.
(i) The rates quoted shall be inclusive of all taxes ,cess, levies etc as applicable including GST (j) The prevailing rate,wage,contribution etc shall be as applicable as on the bid submission end date. (k) In view of COVID-19 alerts various restrictive instructions issued concerned authorities from time to time. Hence additional precautions essential for the work shall be taken by the contractor by way of provisioning of masks, hand sanitizers, gloves etc to workmen and all local instructions issued by the Concerned Authorities and Station Authorities shall be complied with all relevant safety precautions covered under Model Rules for the protection of health and sanitary arrangement for workmen (Annexure ‘C’) of IAFW-2249) shall be strictly followed. Nothing extra is admissible on this account
(l) The contractor shall also deploy additional man power as relief against weekly off,leave,holidays etc all as per existing Labour Act and shall substitute the operator accordingly for which no extra payment admissible. The unit rate quoted against items in Schedule ‘A’/BOQ shall be inclusive of this provision also. (m) The contractor shall pay the wages to the operator through e-payment i.e Aadhar linked bank accounts and Credit to their bank account. The wages shall not be less than prevailing minimum wages fixed/ increased at the time of payment by state Govt or central Govt whichever is more.The contractor shall pay the full wages of every month to the employees /operators within seven days of next month without fail.If contractor fails to pay the wages to the employees/operators a penalty of Rs.500 per day per operator shall be recovered and levied from dues of contractor.Contractor shall pay the full wages to the employees/operators,EPF to concerned authority and produce the necessary proof of the same before claiming / submission of RAR/Bill.
(n ) Each shift duration shall be 8 hours & duty timing shall be decided by Engineer-In-Charge. (o) The unit rate quoted shall be deemed to include for cost of labour for daily routine maintenance for trouble free functioning of installation. (p) In case of any abnormal noise/complaint the plant should be put off same should be brought to the notice of Engineer-in-Charge. (q) The operator shall check and rectify loose connection ,water leakage ,cleaning and general upkeep of pump room /GLR/HTR and area around it . (r) The operator shall check the gland, vibration, nut bolts daily & tightening up as and when required. (s) The operator shall check level of distilled water in battery & top up as and when required. The quoted rate shall deemed to include the cost of distilled water.
(t) Check battery terminals, if found loose, tighten it property. (u) The operator employed by the contractor shall be capable of carrying out minor repair maintenance & should have well experience in electrical panel, motor, pump set & fire fightings field etc. (v) The quoted rate is deemed to be inclusive of cleaning material like cotton waste, brromstick,ladder etc & contractor shall ensure general area cleanliness and upkeep of the installation on daily basis. (w) Power supply for operation of electric equipments, pump sets & fire fighting equipment shall be made available by department free of cost. (x) Fuel for operation of DG set / diesel engine driven pump sets shall be made available by the deparment at free of cost. (y) Chemicals for chlorination/dozing shall be measured & paid separately under respective items of this schedule here in after only for executed quantity,however the cost of labour is deemed to be included in the unit rate quoted against Item Nos.1 to 4 above (z) The routine preventive maintenance /checks shall be strictly carried out by the operator all as stipulated in the operation & maintenance manual.
Supply only calcium based granular disinfectant having chlorine concentration 65%-70% complete all as specified and as ddirected.
Supply only alum lump grade 1st quality complete all as specified and as directed. Notes for Item Nos 5 & 6:- (i)The chemicals/materials shall be supplied periodically after obtaining approval of Engineer in charge. (ii) Consumed quantity of chemical will be measured and paid. (iii) Chemical will not be used beyond expiry date.
Supply and filing engine oil grade 15W-40 for routine maintenance and topping up complete all as specified and as ddirected.
Supply only lubricating oil of grade 220 all specified and directed
M & L for cleaning RCC underground sumps/ground level reservoirs/ hill top reservoirs of following capacities including mouths of connected pipes etc by dewatering the sumps by using a portable pumpset of suitable capacity, removing all sludge/mud/dirt etc manually, pouring fresh water in sump through another pumpset, rinsing and dewatering the sumps including removing sludge/dirt particle manually, wash the sump using fresh water mixed with sodium hypochlorite & drain out water by a pumpset and finally applying one coat of antibacterial sodium hypochlorite solution to inner surface & including cost of writing letters as "Tank cleaned on (____ Date)" using synthetic enamel paint outside the wall of RCC water tanks in prescribed format complete all as specified and as directed.
(a) 45 ,000 litre capacity at Baithkol pump house
(b) 50 ,000 litre capacity at Fire tank Binaga
(c) 60,000 litre capacity at GLR (Arga)
(d) 90,000 litre capacity at Baithkol pump house
(e) 1,50,000 litre capacity at GLR / HTR (Little Binaga)
(f) 9,00,000 litre capacity at Bank Gate Arga (GLR)
(g) 10,00,000 litre capacity at GLR /HTR (Sankrubag pump house)
(h) 10,00,000 litre capacity at Arga (HTR)
(j) 11,00,000 litre capacity at Fire water at Arga (GLR)
(k) 96,90,000 litre capacity for drinking water at Arga (GLR)
M&L for dismantling electric motor of following capacities from the centrifugal pumpset/compressor of any make, single or three phase, transporting to workshop, strip opening the motor, cutting and removing burnt winding and rewinding using super enamelled copper wire of suitable gauge to match with the existing winding including varnishing, insulated paper, sleeves tape etc & drying, replacement of ball bearings & bushes of existing size & make, re-assembling the motor, bring back to commissioning at original place/position, connecting with proper alignment and testing complete all as specified and directed by Engr-in-Charge :-
(a) 1 HP (Hyland)
(b) 1.5 HP (Agra Pump House)
(c) 2 HP (Hyland)
(h) 60 HP (Agra Pump House)
(j) 75 HP (Agra Pump House)
(k) 156 HP (Agra Pump House)
M&L for dismantling and overhauling of centrifugal pump set of following capacities, 3 phase 415 volts by opening up the pumpset, cleaning inside & outside thoroughly, including replacement of gland packing, rubber insertion, replacement of bearings - 2 Nos (DE/NDE) and testing complete all as specified and as directed.
(e) 60 HP (Agra Pump House)
(f) 75 HP (Agra Pump House)
(g) 156 HP (Agra Pump House)
S&F in repairs of new battery of 12 volts 180 AH battery complete all as specified and as directed.
S&F in repairs of new battery of 12 volts 65 AH battery complete all as specified and as directed.
S&F in repairs battery charging system meant for charging 12 Volts, 65 AH battery all as specified and directed.
M&L for preparation of existing painted surfaces of motor, pump, water pipe lines etc at ground level drinking water pump house and filling of cavities etc and applying one coat of synthetic enamel paint using spray gun/machine as per colour code including writing SM & MES No on pump & motor, indication marking etc complete all as specified and as directed.
M&L for preparation of existing painted surfaces of pressure sand filters, air compressors, motor, pump, water pipe lines etc at clarified drinking water pump house including filling of cavities etc and applying one coat of synthetic enamel paint using spray gun/machine as per colour code including writing SM & MES No on pump & motor, indication marking etc complete all as specified and as directed.
M&L for preparation of old surface by scraping down old pealed off paint using sand paper, removing dirt/dust from fire hydrant and painting to fire hydrant (1.20 mtr long approx) with applying two coats of synthetic aluminium paint including marking the fire hydrant number as per existing shape and size etc complete all as specified and as directed.
S&F in repairs bearing No : 6309 ZZ complete all as specified and as directed.
S&F in repairs bearing No : 6314 ZZ complete all as specified and as directed.
S&F in repairs gland packing for pump of size 7.5 HP as per site requirement complete all as specified and as directed.
S&F in repairs gland packing for pump of size 30 -150 HP as per site requirement complete all as specified and as directed.
S&F in repairs water pressure gauge dial type of range 0-16 Kg/Sqcm complete all as specified and as directed.
Dismantling and taking out carefully defective spindle from sluice valve of size 80 mm dia and removing the old gate stud by grinding and making it to a shape by brass welding and turning & polishing, greasing, servicing as per original gate stud and refixing the same at position and testing complete all as specified and as directed.
All as per Item No 26 here-in-before, but of size 100 mm dia complete all as specified and as directed.
All as per Item No 26 here-in-before, but of size 150 mm dia complete all as specified and as directed.
Supply only grease for pump bearings complete all as specified and as directed.
S&F in repairs mild steel nuts, bolts, washer & flange etc complete all as specified and as directed.
S&F in repairs cast iron sluice valve of size 80 mm flanged PN-1.6 ISI conforming to IS :14846 hand wheel operated, stainless steel stem with gun metal parts flanged driller to IS: 1538 non rising stem PN-1.6 complete all as specified and as directed.
All as per Item No 31 here-in-before, but of size 100 mm dia complete all as specified and as directed.
All as per Item No 31 here-in-before, but of size 150 mm dia complete all as specified and as directed.
S&F in repair 80 mm dia water meter CI body flanged and drilled both ends confirming to IS 2373/81 mechanical driven straight reading including 80 mm dia CI stainer complete all as specified and as directed.
S&F in repairs of oil filter suitable for DG sets of 250 KVA complete all as specified and as directed.
S&F in repairs of fuel filter suitable for DG sets of 250 KVA complete all as specified and as directed.
S&F in repairs following spare parts suitable for 250 KVA DG Sets complete all as specified and as directed.
(a) V-belt (Part No 3058383)
(b) Hose clamp (Part No:43828 D)
S&F in repairs of carbon brushes for alternator of 250 KVA Gen set complete all as specified and as directed.
S&F in repair MCCB 100 Amps rupturing capacity 25 KA 4 Pole 415 volts AC with adjustable thermal setting complete all as specified and as directed.
S&F in repair MCCB 160 Amps rupturing capacity 25 KA 4 Pole 415 volts AC with adjustable thermal setting complete all as specified and as directed.
S&F in repairs MCB TPN, 50 to 63 Amps, ''C'' series 415 Volts, 3 phase, 10 KA breaking capacity of complete all as specified and as directed.
S&F in repairs MCB SPN, 6 to 32 Amps, ''C'' series 230 Volts, single phase, 10 KA breaking capacity complete all as specified and as directed.
M&L for cleaning the pressure sand filters following capacity installed at various pump house at Naval Base Karwar by opening up the inspection covers, removing the existing filter media, cleaning thoroughly and refilling the same and toping up the deficient filter media of required quantity and fixing back the covers including replacement of existing unserviceable rubber gasket all as directed. Note : (i) Filter media used for toping up will be measured and paid separately under relevent item No 45 & 46 :-
(a) 300 Cum/Hr
(b) 30 Cum/Hr
Supply only granular fine pebbles suitable for filter media of pressure sand water filters installed at various pump house at Naval Base Karwar, granular fine pebbles should be free from all types of salts, alkaline materials, minerals, silts, impurities etc complete all as specified and directed.
Supply only quartz coarse sand suitable for filter media of pressure sand water filters installed at various pump house at Naval Base Karwar, quartz coarse sand should be free from all types of salts, alkaline materials, minerals, silts, impurities etc complete all as specified and directed.
Opening the LT Panel board cubical type for pump sets located in pump house, cleaning the bus duct chamber, inspect the complete panel, tighten the all nut, bolts of incoming, outgoing ACBs/MCCB s/ SFU/Change over of different capacity and heating up for removal of moisture, record its IR value with the help of 1.1KV megger and applying thick coating of Z931 strippex B and Z 955 Strippex (SL) of stanac product for preventing from flush over and fire hazard, including replacement of 3mm thick gasket, closing of all holes complete all as specified and as directed Note : The quoted rates deemed to be included the nut & bolts, washer and minor items required for smooth functioning of panel board
S&F in repairs MCB, single pole 6 to 32 Amp, 240 Volts, 10 KA Capacity 'C' curves series complete all as specified and a s directed.
Supply, laying, jointing and testing of PVC insulated FR round sheathed flexible industrial cable heavy duty with stranded copper conductor, 1100 volts grade of cross-sectional area 16 Sq mm 4 core, conforming to IS-694 laid in pipe/ducts/wall/floors etc or fixed with saddle and clamps complete with proper thimbles, nuts, bolts and washers complete all as specified and as directed.
M&L for overhauling of Diesel Engine 156 HP, Make- Kirloskar at MES Pump House Arga by mechanic having good experience about diesel engine, replacement of gasket/packing materials, fuel filter, air filter and engine oil including carrying out the following maintenance/works and testing complete all as directed by Engineer-in-Charge :- (a) Opening, cleaning of cylinder block by using diesel thoroughly and re fixing the same after lubricating.. (b) Opening, cleaning of crank case by using diesel thoroughly and re fixing the same after lubricating. (c) Opening, cleaning of piston and piston block by using diesel throughly and re fixing the same after lubricating. (d) Opening, cleaning of Gajan Pin by using diesel thoroughly and re fixing the same after lubricating.
(e) Opening, cleaning of Compression Ring & Oil Ring by using diesel thoroughly and re fixing/setting the same after lubricating. (f) Opening, cleaning of Cylinder Head, Inlet Valve & Outlet Valve by using diesel thoroughly and re fixing/setting the same after lubricating. (g) Opening, cleaning of Push Rod & Rocker Arm assembly by using diesel thoroughly and re fixing/setting the same after lubricating. (h) Opening, cleaning of Valve tappet by using diesel thoroughly and re fixing/setting the same after lubricating. (j) Setting of timing (k) Opening, cleaning of fuel tank internally by using diesel thoroughly and re fixing the same. (l) If any defects found within one year after carrying out the overhauling/servicing, contractor will be responsible to rectify the defects without any extra cost.
S&F in repairs cast iron wafer type butterfly valve size 300 mm without lugs, gear operated, stainless steel grade 304 disc, Nitrile/EPDM rubber lining test pressure PN-1.0/PN1.6 complete all as specified and as directed.
S&F in repair MCCB 400 Amps 3 Pole 50 KA breaking capacity, 415 volts AC with adjustable thermal magnetic release complete all as specified and as directed.
S&F in repair MCCB 250 Amps 3 Pole 36 KA breaking capacity, 415 volts AC with adjustable thermal magnetic release complete all as specified and as directed.
S&F in repairs HRC fuse links 250 Amps, DIN type, 80 KA, 500V, AC, 50 Hz, Size 1 complete all as specified and as directed.
S&F in repairs HRC fuse links 125 Amps, DIN type, 80 KA, 500V, AC, 50 Hz, Size 00 complete all as specified and as directed.
S&F in repairs HRC fuse links 100 Amps, DIN type, 80 KA, 500V, AC, 50 Hz, Size 00 complete all as specified and as directed.
S&F in repairs 3 - way Inlet Breeching, gun metal body having 3 gun metal, 63 mm male instantaneous inlets, fitted with non- return valves with gun metal drain valves, 3 rubber blank caps and chain complete all as specified and directed by Enge-in-Charge.
S&F in repairs 2 - way Inlet Breeching, gun metal body having 2 gun metal, 63 mm male instantaneous inlets, fitted with non- return valves with gun metal drain valves, 2 rubber blank caps and chain complete all as specified and directed by Enge-in-Charge.
S&F in repairs water monitor 2.5" gun metal body, 63 mm male instantaneous inlets, rubber blank caps and chain complete all as specified and directed by Enge-in-Charge
S&F in repairs rubber seal, blank caps and chain for fire hydrant of any size complete all as specified and directed by Enge-in-Charge.
S&F in repairs hose box made of 18 gauge MS Sheet 800mm X 600mm X 250mm with double door with 4 mm thick glasses and door frame made of 16 gauge MS sheet painted fire red out side and brilliant white inside yard complete all as specified and as directed.
S&F in repairs Single Outlet Landing valve (Hydrant Valve) of size 63 mm dia of Straight/Right Angle/Turn Down type made out of gun metal, flanged type, conforming to IS : 5290 along woth cast iron hand wheel operated, female instantaneous outlet, ABS Blank cap and chain complete all as specified and directed by Enge-in-Charge.
S&F in repairs 63 mm dia branch pipe with 20 mm nozzle made out of gun metal, ISI Marked, conforming to IS : 903 and body testing at 21 Kgf/sqcm and suitable for 7 Kgf/sqcm working pressure complete all as specified and directed by Enge-in-Charge.
S&F in repairs fire hose delivery coupling having size of 63 mm dia made out of gun metal, ISI Marked, conforming to IS : 903 and body testing at 21 Kgf/sqcm and suitable for 7 Kgf/sqcm working pressure complete all as specified and directed by Enge-in-Charge.
S&F in repairs dura reinforced rubber lined canvas hose pipe having size of 63 mm dia of length 30 mtr with high abrasion and heat resistance, ISI Marked, conforming to IS : 636/1988 and brust pressure 35.7 Kgf/sqcm and proof pressure 21.4 Kgf/sqcm and mass wt 425 gram/mtr complete all as specified and directed by Enge-in-Charge.
Unity Enterprises
cooltech engineering services
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .