Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.1 LAccepted-AOC | ₹23.1 L Quoted ₹19.6 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹20.6 L+₹1.0 L (5.21%)Rejected-Finance | ₹20.6 L+₹1.0 L (5.21%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹19.8 L+₹28,668.40 (1.47%)Rejected-Finance | ₹19.8 L+₹28,668.40 (1.47%) | L3 | Rejected-Finance Rejected |
Tender Value
₹24.5 L
EMD Value
₹24,600
Closing Date
24 Mar 2026, 5:00 pmClosed
Executive Engineer,Central Tender Cell
Central Tender Cell, UG Floor, ICOMC Tower, Satya Nagar
Roadside development from Varenyas Restaurant to HDFC Bank Chhak Nuasahi in Ward No. 39
2026_ORULB_127155_13
BMC-EE-Tender Cell-78/2025-26 Dt. 10.03.2026
Open Tender
Civil Works - Others
Percentage
75 days
BMC AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹24,600
Yes
Office chamber of the EE,Central Tender Cell
1 Sept 2026
13 Mar 2026
25 Mar 2026
13 Mar 2026
24 Mar 2026
13 Mar 2026
13 Mar 2026 - 18 Mar 2026
18 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantlling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead. | 47.5 | cum | 858.58 | ₹40,782.55 |
| 2 | Earth work in ordinary soil including rough dressing and levelling the bed. | - | cum | 276.89 | - |
| 3 | Carriage of Excavated earth by mechanical means with in 5km lead including loading and unloading with all cost Conveyance T&P sun dries etc.complete as per direction of Enggineer-in-charge. | - | cum | 160.68 | - |
| 4 | Supplying and filling sand in foundation and over areas including watering, ramming, consolidating and dressing, labours, tools, taxes etc. all complete as per the specification and direction of Engineer-In-charge. | - | cum | 519.79 | - |
| 5 | C:C: (1:4:8) using 4 cm. size H.G. metal (C.B) including the cost of all materials, labour etc complete. | - | cum | 5,775.39 | - |
| 6 | R.C.C. work of M20 grade with 20 mm down grade chips (C.B.) including Hoisting & laying | - | cum | 6,586.34 | - |
| 7 | Labour charges for cutting, bending, binding and tying the grill including the cost of M.S. rod. | - | qtl | 9,389.58 | - |
| 8 | Iron work wrought and put up in trusses and purlins and posts etc. complete. | - | kg | 145.49 | - |
| 9 | Painting two coats over a coat of priming over new Iron work with the cost of primer & paint. | - | sqm | 265.56 | - |
| 10 | Supplying ,fixing ACP boards with all cost | - | sqm | 4,142.6 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_584849.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
DTCN.pdf
Tender Documents • 0.93 MB
BOQ_584849.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .