| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.9 LAccepted-AOC | ₹68.9 L | L1 | Accepted-AOC As per Board recommendation |
| 2 | L2₹68.9 L+₹1,992.10 (0.03%)Rejected-AOC | ₹68.9 L+₹1,992.10 (0.03%) | L2 | Rejected-AOC As per Board recommendation |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-EMD non responsive |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
27 Jan 2023, 11:00 amClosed
EE-II,IMC
IMC office, Niti Vihar, Itanagar
1.C/o CC Drainage system at Anya colony, Banderdewa in the backside of O.C, Office 5/1-300mtrs, 2.C/o CC Drainage system from Dree colony to Dikrong river -200 mtrs,.3.C/o Community Building Boundary Wall at PTC, Banderdewa,.4.C/o RCC Retaining wall
2023_IMCAP_1046_2
IMC/EE(Pt-II)/15 FC/RFP/NIT-251/22-23/32
Open Tender
Civil Works
Item Rate
90 days
banderdewa
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Yes
Payable To EE-II,IMC
₹1.4 L
Yes
6 Feb 2023
21 Jan 2023
27 Jan 2023
21 Jan 2023
27 Jan 2023
21 Jan 2023
21 Jan 2023 - 23 Jan 2023
Amount
Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m.
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Reinforced cement concrete in walls (any thickness) including attached pilasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in :a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size
Centring and shuttering including strutting, propping etc and removal of form work for : (b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
12 mm cement plaster 1 : 4 (1 cement : 4 fine sand).
Neat cement punning.
Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m.
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Reinforced cement concrete in walls (any thickness) including attached pilasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in :a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size
Centring and shuttering including strutting, propping etc and removal of form work for : (b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
12 mm cement plaster 1 : 4 (1 cement : 4 fine sand).
Neat cement punning.
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) in ordinary soil by manual means depth upto 3m Excavation for drain
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in:a) Foundations and plinth
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :a) M 20 1 : 1.5 : 3(1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size).
Centring and shuttering including strutting, propping etc and removal of form work for :a) Foundation, footings, bases of columns etc. and mass concrete.
Reinforcement of RCC work including bending, binding and placing in position complete.
Brick work with best available local bricks in foundation and plinth in cementmortar 1:3 (1 cement : 3 fine sand).Wall
20 mm cement plaster 1 : 3 (1 cement : 6 fine sand).
Finishing walls with water proofing cement paint of approved brand and manufacture and required shade on new work (three or more coats) to give an even shade.
Applying cement slurry on RCC slabs or cement concrete work using 2.75 Kg of cement per Sq.m. for receiving cement concrete floor including roughening, cleaning etc complete.
Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. a) Foundations and plinth
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specificationsg, fitting and placing HYSD bar reinforcement in sub?structure complete as per drawing and technical specificationsb) Tar/TMT steel
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces withcement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement ina) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc and removal of formwork for :a) Foundation, footings, bases of columns etc. and mass concrete.
Centring and shuttering including strutting, propping etc and removal of formwork forb) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular Material
Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. a) Foundations and plinth
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specificationsg, fitting and placing HYSD bar reinforcement in sub?structure complete as per drawing and technical specificationsb) Tar/TMT steel
Centring and shuttering including strutting, propping etc and removal of formwork for :a) Foundation, footings, bases of columns etc. and mass concrete.
Centring and shuttering including strutting, propping etc and removal of formwork forb) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm togive a smooth and even surface excluding cost of centring, shuttering and reinforcement in ::a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Earth work in excavation in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions, lead upto 50 m and lift upto 1.50 m.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. a) Foundations and plinth
Reinforcement of RCC work including bending, binding and placing inb) Tar/TMT steel position complete.
Centring and shuttering including strutting, propping etc and removal of formwork for :a) Foundation, footings, bases of columns etc. and mass concrete.
Centring and shuttering including strutting, propping etc and removal of formwork for b) Walls (any thickness) including attached pilasters, buttresses, plinth andstring courses etc.
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm togive a smooth and even surface excluding cost of centring, shuttering and reinforcement in ::a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
A. K. Enterprises
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1187.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .